INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

– n° 1 Review resources access policy, procedures, rules and challenges: The Italian experience and future challenges Antonia Ghiselli INFN-CNAF Workshop.
European, National and Local INFN GRID projects Leonardo Merola Dipartimento di Scienze Fisiche - Università di Napoli Federico II Istituto Nazionale di.
Installation and evaluation of the Globus toolkit WP 1 INFN-GRID Workload management WP 1 DATAGRID WP 2.1 INFN-GRID Massimo Sgaravatto INFN Padova.
INFN & Globus activities Massimo Sgaravatto INFN Padova.
CHEP 2000, Roberto Barbera NA3, NA4, and NA5 activities Milano, Università di Catania and INFN Catania - Italy ALICE Collaboration.
WP 1 (Globus) Status Report Massimo Sgaravatto INFN Padova for the INFN Globus group
DataTAG WP4 Meeting CNAF Jan 14, 2003 Interfacing AliEn and EDG 1/13 Stefano Bagnasco, INFN Torino Interfacing AliEn to EDG Stefano Bagnasco, INFN Torino.
LNL CMS M.Biasotto, Padova, 24 aprile Farm monitoring Massimo Biasotto - LNL.
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Andrew McNab - Manchester HEP - 15 February 2002 Testbed Release in the UK EDG Testbed 1 GridPP sources of information GridPP VO GIIS and Resource Broker.
S.L.LloydGrid Steering Committee 8 March 2002 Slide 1 Status of GridPP Overview Financial Summary Recruitment Status EU DataGrid UK Grid Status GridPP.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Andrew McNab - Manchester HEP - 10 May 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –What are other sites doing? –What are.
Stephen Burke - WP8 Status - 14/2/2002 Partner Logo WP8 Status Stephen Burke, PPARC/RAL.
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Work Package 1 Installation and Evaluation of the Globus Toolkit Massimo Sgaravatto INFN Padova.
LCG Tiziana Ferrari - SC3: INFN installation status report 1 Service Challenge Phase 3: Status report Tiziana Ferrari on behalf of the INFN SC team INFN.
Deployment Team. Deployment –Central Management Team Takes care of the deployment of the release, certificates the sites and manages the grid services.
Alessandro Italiano INFN – CNAF 26/09/2003 1/5 Status of the INFN - EDG testbeds Alessandro Italiano 7th DataGrid Conference.
IPv6 and IBP storage network and content delivery system over an IPv6 Testbed Gabriella Paolini
LNL CMS M.Biasotto, Bologna, 29 aprile LNL Analysis Farm Massimo Biasotto - LNL.
Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Consistency of Accounting Information with.
November 21, 2002Luca Vaccarossa INFN - Milano1 Interoperability Demos and Atlas applications Luca Vaccarossa (INFN - Milano) ATLAS Software Workshop 21/11/2002.
– n° 1 VO Magic – Planck – Compchem in the production infrastructure.
Réunion DataGrid France, Lyon, fév CMS test of EDG Testbed Production MC CMS Objectifs Résultats Conclusions et perspectives C. Charlot / LLR-École.
The EDG Testbed Introduction and Setup The European DataGrid Project Team
Status of Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN Testbed status report L. Gaido WP6 meeting CERN - October 30th, 2002.
The EDG Testbed Deployment Details The European DataGrid Project
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
DATAGRID ConferenceTestbed0 - resources in Italy Luciano Gaido 1 DATAGRID WP6 Testbed0 resources in Italy Amsterdam March,
DataGrid is a project funded by the European Union VisualJob Demonstation EDG 1.4.x 2003 The EU DataGrid How the use of distributed resources can help.
05/23/2002Flavia Donno, INFN-Pisa1 DataTAG experiment grid integration plan Flavia Donno, INFN-Pisa DataTAG/iVDGL joint meeting, May 2002.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
CMS Stress Test Report Marco Verlato (INFN-Padova) INFN-GRID Testbed Meeting 17 Gennaio 2003.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
THE INFN GRID PROJECT zScope: Study and develop a general INFN computing infrastructure, based on GRID technologies, to be validated (as first use case)
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
Roberto Barbera Prague, ALICE Multi-site Data Transfer Tests on a Wide Area Network Giuseppe Lo Re Roberto Barbera Work in collaboration with:
Prototyping production and analysis frameworks for LHC experiments based on LCG, EGEE and INFN-Grid middleware CDF: DAG and Parametric Jobs ALICE: Evolution.
30/07/2005Symmetries and Spin - Praha 051 MonteCarlo simulations in a GRID environment for the COMPASS experiment Antonio Amoroso for the COMPASS Coll.
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
Condor on WAN D. Bortolotti - INFN Bologna T. Ferrari - INFN Cnaf A.Ghiselli - INFN Cnaf P.Mazzanti - INFN Bologna F. Prelz - INFN Milano F.Semeria - INFN.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
M. Cristina Vistoli EGEE SA1 Organization Meeting EGEE is proposed as a project funded by the European Union under contract IST Regional Operations.
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
DGAS Distributed Grid Accounting System INFN Workshop /05/1009, Palau Giuseppe Patania Andrea Guarise 6/18/20161.
– n° 1 The Grid Production infrastructure Cristina Vistoli INFN CNAF.
BaBar-Grid Status and Prospects
The EDG Testbed Deployment Details
INFNGRID Monitoring Group report
INFN – GRID status and activities
The INFN TIER1 Regional Centre
Presentation transcript:

INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

INFN participation to DataGrid WP6 Integration Team: – packaging – installation and configuration using LCFG – Information Service – documentation Authorization Site managers

The goal The goal is to provide a working infrastructure for the middleware validation This is achieved by providing: –a simple automatic installation tool –test suites –a wide deployment of the infrastructure –an effective support service

Infn Testbed resources They consist of: –Dedicated resources for middleware testing & validation 6 sites with a cluster (10 CPUs and a disk server with 300GB of disk space) 12 sites with a small cluster (3-5 nodes) –A Tier1 Regional Centre prototype at CNAF –Experiments’ Tier2 and Tier3 RCs

GARR PoP access points (PoP) main transport nodes TORINO PADOVA BARI PALERMO FIRENZE PAVIA MILANO GENOVA NAPOLI CAGLIARI TRIESTE ROMA PISA L’AQUILA CATANIA BOLOGNA UDINE TRENTO PERUGIA LNF LNGS SASSARI LECCE LNS LNL SALERNO COSENZA S.Piero FERRARA PARMA CNAF ROMA2 Testbed Sites 6 main 12 small INFN TESTBED Sites Geant 2.5Gbps 600Mbps USA

CMS Replica Catalogue TB1 CNAF site SE370GB CE (10 PIII 1GHz, 512 MB RAM) ATLAS Replica Catalogue GE Switch LCFG server InfnGrid VO Ldap server User Interface Test RC RC

INFN TB1 site (6 sites) SE370GB CE (10 PIII 1GHz, 512 MB RAM) 512 MB RAM) FE Switch LCFG server User Interface

INFN sites for Testbed1 R.Broker I Garr-B  Garr-G Cnaf MI PD CE SESE TO CT CE SESE RC/CMS PI CE SESE SESE SESE SESE RC/ATLAS VO RC (155M  622M) (155M  ) 622M) (155M  622M) UI

Testbed1 setup steps The rpm lists for the grid elements (CE, WN, SE and UI) have been tested and manually configured at CNAF (Globus2 alpha 15) The CE, WN, SE and UI have been installed and configured using LCFG in the Testbed1 sites Test-suites for the grid elements are being developed (SE almost ready, CE, WN, UI under construction) CEs and SEs have been registered in II at CNAF The UI users have to be mapped to the local RB account (e.g. wp1 at CNAF, condor at CERN).

Testbed1 setup steps InfnGrid VO has been created and populated with every InfnGrid application-independent people Testbed1 group (inside InfnGrid VO) created (users involved in test and validation activities) Mkgridmap ready to be used to create the gridmapfile where needed (CEs) Testbed1 users created on the UIs NetSaint installed and configured to monitor the INFN Testbed1 resources (ping, CPU, disk usage)

InfnGrid & DataGrid testbeds DataGrid Appl. & WP6 partners VOs INFN-Grid VO Infn sites 2 grid domains: 6 sites for DataGrid Testbed1 6+12sites for national Testbed1 CERN Lyon/in2p3 RAL/pparc nikhef mito ba ca na le pd/lnl Cnaf/bo ct pi roma ts ge pv rm3 fe pr Each InfnGrid site can join the DataGrid Testbed if needed

RB – II- GRIS layout INFN CERN UK IN2P3 RBIIRBII CTTO CNAF ALICE RBII ….. Testbed1 Alice CMS CE & SE Grises: ….. CMS RBII

GRID monitoring at INFN Interim solution Tool chosed: NetSaint ( Present/future activities: –monitoring of all INFN Testbed1 sites –monitoring of the ALICE testbed –interface to the RRDTool for plots of historical trend of monitored parameters –interface to Globus MDS 2 under way Current implementation: (username: infn-tb - password: guest)

Grid monitoring at INFN

Conclusions A lot of work has been done to install and test the software Strong cooperation among people from different WPs Site managers support for installation and testing some work still to be done

Conclusions Strong need for well defined software releases to work on The grid should be widely distributed. We are at a very early stage. Need for a deployment plan and a support structure Test of an MDS infrastructure for the grid domains (VO) and services needed

Thanks to Marco Serra (Roma1) Enrico Ferro (Legnaro) Massimo Biasotto (Legnaro) Marco Verlato (Padova) Andrea Chierici (CNAF) Flavia Donno (Pisa) Silvia Resconi (Milano) Roberto Barbera (Catania) Carlo Rocca (Catania) Giuseppe Sava (Catania) Gennaro Tortone (Napoli) Antonio Forte (Torino) Stefano Lusso (Torino) Alessandro Cavalli (CNAF) Stefano Barale (Torino) Alessandro Italiano (CNAF) Daniele Mura (Cagliari) Andrea Sciaba’ (Pisa) Alessandro De Salvo (Roma) P. Lo Re (Napoli) and, last but not least, Authorization WG, IT & Loose Cannons