CEO, PBL Group Ltd., Bangkok

Slides:



Advertisements
Similar presentations
M-25 over Harbor Beach Creek
Advertisements

Concrete Structures Introduction to design methods in reinforced concrete Sustainable construction – is concrete “green”? Possibilities in concrete structure.
Innovative Solutions for an Evolving Industry
ODOT Structure Project Manager Seminar Specifications
ODOT Structure Project Manager Training
Module Floor Systems.
Precast Bent System for Bridges in Seismic Regions
SEMINAR ON SEGMENTAL CONSTRUCTION OF BRIDGE
Floor Systems. B1 Level Floor System Options Option 1 – Slab on Grade with Grade Beams Option 2 – Structural Slab at Grade.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
TRADITION, POWER QUALITY , INNOVATION
Introduction to composite construction of buildings
IIT Madras, SERC Madras, Anna Univ., INSDAG
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
Concrete Fooring & Roofing System
St Croix River Crossing S.P Contractor Information Meeting 15 May 2013 River Spans.
Bridges.
Competency: Draw Wall Sections
Bridge Engineering (6) Superstructure – Concrete Bridges
Concrete and Masonry Work Different forms of concrete work Each has it’s own unique hazards – Lift Slab – Pre-stressed Concrete – Concrete Pumping – Masonry.
TEQIP-II Institutions
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
Fundamentals of Building Construction, Materials & Methods, 5 th Edition Copyright © 2009 J. Iano. All rights reserved. Plant-Cast Precast Concrete Concrete.
Spliced Precast Girders
ENG-1010 Lecture 16 Bridge Design.
Welcomes to presentation on Segmental Construction by Crib & Crane and Crib & Goliath Gantry at National Seminar on Design & Construction of Bridges Welcomes.
Chapter 34 Bridge Construction.
2E8 Materials (Civil Engineering Component) Civil Engineering Materials Department of Civil, Structural and Environmental Engineering Trinity College Dublin.
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
 Project Delivery  Design Considerations  Lessons Learned.
EUROCODES - Background and Applications – Moscow 9-10 December 2010 Prof. Ing. Giuseppe Mancini - DISTR - Politecnico di Torino 1 EUROCODE 2 – Design of.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
-Beam -Truss -Arch -Suspension -Cable Stayed
BRIDGE DESIGN SAIF HAROON BY Post-Doctoral Research Associate
By PARIKH KALPESH. Overview Introduction Structural evaluation of the bridge deck, girders, abutment, and piers Recommended non destructive tests Short.
Note: Moment Diagram Convention
Spliced Girders A Producer’s Perspective
Bridge Engineering (9-1) Suspension Bridges I. *Components: Anchorage (blocks or tunnel type), towers, main cables, hangers, stiffened (box) girder and.
Maruti Steel Fab. Shaping Ideas One of the Largest Manufactures of Formworks in INDIA.
Types of Bridges Photos by J.S. O’Connor. Steel Multi-Girder.
1 9 th Oct Design and Construction of Main & Crescent Bridges.
ROB at Koratty in lieu of LC No.54 Progress as on
No Cell Phones, Please. Thank You.. Division of Layne Christensen Company Specialty Foundation Construction Jet Grouting Drilled Micropiles Vibratory.
Outline of the Execution Manual for Seismic Retrofitting of Existing Pile Foundations with High Capacity Micropiles Masashi ITANI Takeshi OSHITA Seiichi.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Chapter 43 Common Commercial Construction Materials.
Prestressed Concrete I.  *Unfavorable effects induced from the presence of cracking in reinforced concrete: To expose the reinforcement to corrosion;
FOUNDATIONS.
Presented By: Marvin Burns, PE Janssen & Spaans Engineering, Inc.
Condition of Prestressing of the Ft. Lauderdale- Hollywood Airport Deconstructed Segmental Bridges Luis M. Vargas Beiswenger Hoch and Associates.
Construction Methodology for Suramadu Main Bridge.
Offsite manufactured Bridges
High Bridge Re-Deck Project
Required Drawings and Info for Formwork or Scaffold Design
Visit for more Learning Resources
Structural Considerations for Bridges
STRUCTURAL CONCEPT Cityland MART VPKC3 - VNCC.
Danube Bridge Vidin – Calafat
Micro Pile to Concrete Connection
Bridge modelling with CSI software.
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
CONSTRUCTION METHODS & TECHNOLOGY
RCC UNIT-12 Prestressed Concrete
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
Cebus Rimon Industrialized Construction Ltd
TWO-WAY SYSTEM WITH UNBONDED TENDONS
By: Clarence Fragoso and Jonathan Lopez
Micro Pile to Concrete Connection
Presentation transcript:

CEO, PBL Group Ltd., Bangkok PBL Group' Presentation Handouts PBL Group Ltd. 8/11 Soi Viphavadi 44, Viphavadi-Rangsit Road, Lardyao, Jatujak, Bangkok 10900,Thailand. Part 2 Examples of Bridges and Girders (Completed and on-going projects) To be on display until arrival of delegation Presentation by Mr. Prapat Boonlualoah CEO, PBL Group Ltd., Bangkok 1

Thimphuchu Bridge, Bhutan for the Royal Government of Bhutan Steel Arch structure with PT slab Span = 78.60 m Strand Type = 0.6” Anchorage Type M1206 = 8 No. in beams Anchorage Type SF 206 = 80 No. in slab Total quantity = 11 Tons

Thimphuchu Bridge, Bhutan for the Royal Government of Bhutan Client  Royal Government of Bhutan Funded by  Royal Government of Bhutan Tech. Support  JICA, Japan International Cooperation Agency Designer  Slaich Bergerman Consultantcy Supervision  Green Place & Acecoms, AIT Joint-Venture Contractor  Gaseb, Bhutan & Simplex, India Joint-Venture Project Value  52,000,000 NU (1,155,555.00 USD)

Thimphuchu Bridge, Bhutan Tendon Layout

Thimphuchu Bridge, Bhutan Sectional Details

Section at the Junction of Edge Beam & Cross Beam Thimphuchu Bridge, Bhutan Section at the Junction of Edge Beam & Cross Beam

Thimphuchu Bridge, Bhutan Laid-out Tendons

Semtokha-Rongchu Bridge, Bhutan for the Royal Government of Bhutan Semtokha-Rongchu Bhutan Semtokha-Rongchu Bridge, Bhutan for the Royal Government of Bhutan 2 nos. Box Girders with 2 webs Span = 45.00 m Strand Type = 0.6” Anchorage Type M2206 = 40 No. in web Total quantity = 24 Tons

Semtokha-Rongchu Bridge, Bhutan for the Royal Government of Bhutan Semtokha-Rongchu Bhutan Semtokha-Rongchu Bridge, Bhutan for the Royal Government of Bhutan Client  Royal Government of Bhutan Funded by  Royal Government of Bhutan Tech. Support  JICA, Japan International Cooperation Agency Designer  Green Place & Acecoms, AIT Joint-Venture Supervision  Green Place & Acecoms, AIT Joint-Venture Contractor  Rinson, Bhutan & Gannon, India Joint-Venture Project Value  27,000,000 NU (600,000.00 USD)

Semtokha-Rongchu Bhutan

Semtokha-Rongchu Bhutan

Semtokha-Rongchu Bhutan Details at End Pier

Cross Section at End Pier Cross Section at Mid-span Semtokha-Rongchu Bhutan Cross Section at End Pier Cross Section at Mid-span

Installation Work in Progress Semtokha-Rongchu Bhutan Installation Work in Progress

Semtokha-Rongchu Bhutan Installation Set-up

Equipment Handling & Operation Semtokha-Rongchu Bhutan Equipment Handling & Operation

Semtokha-Rongchu Bhutan Wedges and Strands

Semtokha-Rongchu Bhutan De-shuttering

Bang Pakong Bridge, Thailand 295 Girders Span = 25.00/35.00 m Strand Type = 0.5” (12.7mm) Anchorage Type M1205, M1905

Bang Pakong Bridge, Thailand Contractor  Vijitpan Construction Co,Ltd. Owner  Highway Department of Thailand Supervision  Highway Department of Thailand

Bang Pakong Bridge, Thailand Horizontal Plan Vertical Plan I-Girder of Lengths 25 m and 35 m

Reinforcement Details Bang Pakong Bridge, Thailand Reinforcement Details I-Girder of Lengths 25 m and 35 m

Bang Pakong Bridge, Thailand Sections A-A and B-B I-Girder of Lengths 25 m and 35 m

Bang Pakong Bridge, Thailand Sections C-C and D-D I-Girder of Lengths 25 m and 35 m

Bang Pakong Bridge, Thailand Girder Sections I-Girder of Lengths 25 m and 35 m

Rama VIII Bridge, Bangkok Owner  Bangkok Metropolitan Administration Funded by  Royal Thai Government Designer  Buckland and Taylor (Canada), Asdeco (Thailand) Consultant  Mott McDonald (UK) Contractor  KPV, China State, BBR JV

Cross Beam with Tendon Type M1906 Rama VIII Bridge, Bangkok Cross Beam with Tendon Type M1906

Anchor and Backspan PT Details Rama VIII Bridge, Bangkok Anchor and Backspan PT Details

Anchor and Backspan PT Section Details Rama VIII Bridge, Bangkok Anchor and Backspan PT Section Details

Anchor and Backspan Reinforcement Details Rama VIII Bridge, Bangkok Anchor and Backspan Reinforcement Details

Anchor and Backspan Reinforcement Details Rama VIII Bridge, Bangkok Anchor and Backspan Reinforcement Details

Ribbed Beam of Backspan Rama VIII Bridge, Bangkok Ribbed Beam of Backspan

Rama VIII Bridge, Bangkok Post-tension Tie Beam at Main Pylon Pile Cap

Standard Highway Girder Bridge Over Srattani-Poonpin River, Thailand Standard Highway Girder

Namdong Bridge, LAOS PDR I-Girder of 25 m length with PT Type M705

Precast Double-T Girder Thai Oil Jetty, Auo Udom, Cholburi, Thailand Precast Double-T Girder of 24.00 m span

Standard Hollow-Box Beam Vehicular Bridge over Klong Prapa, Thailand Standard Hollow-Box Beam

Highway Standard’ Pedestrian Bridge of I-Grider Chaengwattana Road, Thailand Highway Standard’ Pedestrian Bridge of I-Grider

Ground Anchors Production at Factory

Coil Awaiting Dispatch to Site Ground Anchors Coil Awaiting Dispatch to Site

Single Strand Stressing Jack General Stressing Equipment Single Strand Stressing Jack Capacity: 200 – 300 kN

Multi-Strand Stressing Jack General Stressing Equipment Multi-Strand Stressing Jack Capacity: 1100 – 9000 kN

Technical Data of TT 450 Stressing Jack General Stressing Equipment Technical Data of TT 450 Stressing Jack

General Stressing Equipment Hydraulic Pump

Anchorage and Tendon Data

Anchor Plate Casting Type M Grout Inlet Corrugated Metal Round Duct Wedges Anchor Head Type M Anchor Plate Casting Type M Grout Inlet Corrugated Metal Round Duct Anchorage Spiral Reinforcement Anchorage Components

Sample Board Type M 3106 Set-up

To be continued in Part 3. Work Examples - Buildings PBL Group' Presentation Handouts PBL Group Ltd. 8/11 Soi Viphavadi 44, Viphavadi-Rangsit Road, Lardyao, Jatujak, Bangkok 10900,Thailand. To be continued in Part 3. Work Examples - Buildings To be on display until arrival of delegation Presentation by Mr. Prapat Boonlualoah CEO, PBL Group Ltd., Bangkok 53