Presented by: Yasra Adowar Petroleum Industry Regulatory Team

Slides:



Advertisements
Similar presentations
72V - Recoil, Recoil IS, & Instinct New Vehicle Delivery Tips
Advertisements

Lockout/Tagout Awareness Training
Coach Air Conditioning
Preferred Utilities Manufacturing Corp.
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
Left Side Discharge Pressure Regulator
Installation. Indoor Unit Installation Typical Installation.
By Yasra Adowar Petroleum industry Regulatory Team.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Petroleum Equipment Institute
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
Unit 5 Bench Testing, Maintenance, and Troubleshooting.
Bench Testing, Maintenance, and Troubleshooting.  Identify three primary steps in bench testing a helitorch.  Identify six considerations in maintaining.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Georgia Environmental Protection Division Stage II Vapor Recovery Decommissioning Testing 1. Test Notification & Protocols 2. Test Procedures.
CARBURETED FUEL SYSTEM
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Pressure Switches. New modulating and multi-stage furnaces are more complex and require that installation instructions and procedures be followed so that.
Overview of the 1.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
MassDEP Stage I Vapor Recovery Program
Designing and Installing Exterior Vapor Distribution Systems
NFPA 31 Standard for the installation of Oil- Burning Equipment
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by B. J. Benton United Pump and Controls, Inc.
EVAPORATIVE EMISSION CONTROL SYSTEMS
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Section 4 Ancillary Equipment Section 4 Ancillary Equipment Definition Dispensers & Under Dispenser Containment Vapor Recovery Drop Tube & Fill Port.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
ABL-14d Able Elective Engines Instructors: George Crowl.
OPW Vapor Recovery Solutions
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
1 1 Staying in Compliance: Spill and Overfill Presented by: Brent Roth OPW Retail Fueling IPECA UST Seminar 2015.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
Presented at the Fifth Annual California Unified Program Conference February 6, 2003 Enhanced Vapor Recovery Cindy Castronovo Air Resources Board Cal-EPA.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
Phase II Enhanced Gasoline Vapor Recovery and In-Station Diagnostics
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
© 2016 Chevron Corporation Vacuum Truck Safe Operation SWP Update.
Edward S. Kubinsky Jr. CROMPCO, LLC
Automotive Heating And Air Conditioning
14 Refrigerant Recovery, Recycling, and Recharging.
R1 Fundamentals of Refrigeration
EVAPORATIVE EMISSION CONTROL SYSTEMS
FIGURE 33-1 A typical fuel tank installation.
COMPLIANCE CHALLENGES FACING OWNERS OF UNDERGROUND STORAGE TANKS
Fuel Supply System Service
Overfill Prevention Technology and Maintenance
Emergency Electrical Power Supply for Buildings
R1 Fundamentals of Refrigeration
Jeremy Lewis Director of Service WildcoPES. Jeremy Lewis Director of Service WildcoPES.
TRENTON Casing Filler Presentation
NEW COMPLIANCE REGULATIONS
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Instructions: Adding refrigerant fluid to system
Filling of SAPPHIRE 25 & 42 Bar Systems (TFPP Hardware)
Compressor Operating Instructions
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

Presented by: Yasra Adowar Petroleum Industry Regulatory Team Georgia Procedures for Decommissioning Stage II Vapor Recovery Systems at Gasoline Dispensing Facilities Presented by: Yasra Adowar Petroleum Industry Regulatory Team

Purpose Instruct the owner on how to verify if the contractor has followed the decommissioning procedures as specified in the Rules For Air Quality Control, 391-3-1-.02, and steps defined in the EPD Stage II decommissioning checklist.

Applicability Decommissioning required by April 30, 2016. One of the following Types of Stage II VR Systems may be installed at your site: Systems with one or two vacuum pumps at each fueling point Gilbarco Dresser/Wayne WayneVac Tokheim OPW vapor EZ Franklin Electric INTELLIVAC Catlow ICVN-V1 Healy 800 ORVR Systems with one centrally located vacuum pump: Hasstech and Healy Systems ( with no vapor pumps): Balance

Stage II Decommissioning Checklist Decommissioning checklist should be filled out by a qualified contractor who performed the decommissioning to ensure all steps for decommissioning are accomplished. The checklist has to be completed & signed by the contractor. The form must be submitted by either the owner or the decommissioning contractor to the testing company. The testing contractor must complete and sign for steps 13,14, & 15 of the Stage II decommissioning checklist. A copy of the decommissioning tests notification form along with the Stage II decommissioning checklist form must be submitted by the testing contractor to EPD at the same time.

Stage II Decommissioning checklist

Stage II Decommissioning checklist(cont.)

Stage II Decommissioning checklist(cont.)

Next series of slides will demonstrate all locations that need to be plugged or capped to decommission the Stage II Vapor Recovery System

Liquid collection points Verify if Liquid Collection Points or condensate traps were installed at your site during the installation of the Stage II VRS. If you do have a liquid collection point, confirm the following: The liquid collection point/trap has been emptied from any fluid. The copper tube ends at the STP and at the collection unit have been disconnected and capped by flare fitting. A plug in the submersible pump to seal the vacuum port has been installed and the cap on the liquid collection sump has been replaced.

Liquid collection points(cont.)

Disconnecting Vapor Pumps or Processing Units If the Stage II vapor recovery system in your site includes a vapor pump for each fueling position check the following: The wiring at the pump motor has been disconnected and all wires have been capped off by using appropriately-sized wire nuts to insulate the wires as it was recommended. The replaced wires has been either installed in the electrical junction box or inside the vacuum motor hosing. Otherwise it should be completely removed. The vacuum pump has been disabled or removed. The vacuum pump tubing at the vapor inlet and the outlet have been disconnected and plugged.

Disconnecting Vapor Pumps or Processing Units (cont.)

Disconnecting Vapor Pumps or Processing Units (cont.) If the Stage II vapor recovery system in your site includes a centrally located vacuum pump check that: The vacuum pumping mechanism has been removed and a plug with thread has been installed into the tank top bung(e.g Mini-jet Healy vacuum pumps), or at the inlet and outlet of vapor piping (e.g Vane Pump 500), to create a vapor-tight seal The vapor piping that was attached to the centrally vapor pump has been either capped by using a threaded plug, threaded cap, or glued fitting if the piping is fiberglass. Make sure that the contactor dose not use any type of rubber cap held in place by a hose clamp to seal the vapor piping.

9000-01 MINI-JET INSTALLATION WITH RED JACKET PUMP

9000-02 MINI-JET INSTALLATION WITH RED JACKET PUMP

9000-01 MINI-JET INSTALLATION WITH FE PETRO PUMP

Installation of theVP-500 vane pump

Disconnecting Vapor Pumps or Processing Units (cont.) If your Stage II vapor-recovery system is Hasstech, check that the collection unit and the processing unit have been removed from service and all vapor piping connected to the system have been capped or plugged. Hasstech collection unit Processing unit with the burner and two electrodes

All electrical components of the Stage II VRS Check if all other electrical components of the stage II VRS has been safely disconnected to avoid any electrical hazards as it was recommended. Open the junction box and check the wires have been disconnected and capped with appropriate sized wire nuts and all wires have been sealed off in the electrical junction box. Note: Removing all electrical components is to avoid confusion and mistakes of deciding the presence or the decommissioning of the stage II VRS by the inspector during his inspection.

All other electrical components of the Stage II VRS Healy monitoring system layout

All other electrical components of the Stage II VRS G-70-7-AD-Vacu Rite VCP-2A Control box and status panel G-70-7-AD VCP-2A Hasstech status panel Vacu Rite VCP-3A G-70-164-AA Hasstech System Hasstech control panel

Stage II VR Balance System Decommissioning

Reprograming of Dispenser Electronics Make sure the all dispensers are cleared from any error codes and have no any malfunctions and the vapor pump motors control circuits have been disabled.

Sealing off below grade vapor piping Check that the vapor return piping has been capped at a height below the level of the dispenser’s base and seals must be vapor tight. All vapor piping at the VP 500 cabinet must be below the level of the cabinet’s base and seals must be vapor tight. Make sure that the contactor dose not use any type of rubber cap held in place by a hose clamp to seal the vapor piping.

Sealing off below grade vapor piping

Sealing off Vapor Piping at the Tank Check your non-gasoline tanks are not manifolded with the gas tanks below grade(at either the vent lines or at the vapor return lines). Gasoline tanks should remain manifolded (if a manifold exists). Ensure vapor piping has been plugged at the extractor fitting when piping is located at the tank sump and is accessible from grade. If the piping is fiberglass, it may need to be cut. Vapor return line is connected to the extractor and Should be disconnected and capped .Extractor needs to be plugged

Sealing off dispenser vapor piping Observe that both ends of the vapor piping inside the dispenser cabinet have been securely capped and sealed. Ensure that a rubber cap held in place by a hose clamp is not used to seal the vapor piping.

Stage II Hanging Hardware Replacing the Stage II nozzle, hoses, and breakaways with conventional equipment is voluntary. Note: In the absence of the top off decal warning, liquid may collect in the vapor path and may lead to excess fugitive liquid and/or vapor loss from nozzle during normal operation if the Stage II nozzle is not replaced with a conventional nozzle. If you have chosen to replace the Stage II hanging hardware with conventional, then a compatible adaptor fitting must be used in the coaxial fuel outlet to isolate the vapor path in the piping and to convert the fuel outlet to non vapor recovery.

Non-Stage II Hanging Hardware and Adapter This adapter shown above is for non stage II hanging hardware and cannot be used with Stage II hanging hardware because it has different sizes and different type of threads

Installation of Pressure/Vacuum Vent Valve Most, if not all, facilities should already have the required type and numbers of P/V Vent Valves per Stage I EVR Executive Orders (EOs). Check that no more than three P/V vent valves have been installed in your site. Photo attached is for a site that has violated the installation requirement per the EVR EOs. Check that the p/v vent valve of healy system has been removed and capped( see slide #18).

Removal of Stage II Instructions Ensure that no instructions related to Stage II VRS have been left on dispenser cabinets.

Performing and testing results Ensure that all required testing has been conducted and that all tests have passed. The tests are required within 30 days of the Stage II system being decommissioned. Tests required include: Pressure Decay Test (must be conducted twice – once before and once after the Tie Tank Test Tie Tank Test Read the test results and make sure that all gasoline tanks are manifolded above or below ground, pressure /vacuum vent lines are still functional, and gasoline vapor return lines are not manifold with non-gasoline (diesel) tanks.

Troubleshooting Vapor return lines were not sealed off correctly !

Unplugged Vapor Piping Dispenser vapor line was unplugged!

VP 500 Healy Vapor Pump Not Removed and Vapor Return Piping Not Properly Sealed From the disp. to pump From the pump to the underground storage tank

Site Not Fully Decommissioned

Conclusion Following these procedures should ensure the safe and effective decommissioning of the Stage II Vapor Recovery System. Decommissioning may begin on May 1, 2014 and must be concluded by April 30, 2016. Decommissioning must be completed before facility returns to dispensing gasoline.

Questions