Presenter: Frederick Yaw Logah (RS) CSIR-Water Research Institute, Accra-Ghana 15th July, 2014.

Slides:



Advertisements
Similar presentations
STATISTICS HYPOTHESES TEST (I)
Advertisements

1 WATERSHED SPECIFIC AND REGIONAL SCALE SUSPENDED SEDIMENT LOAD ESTIMATES FOR BAY AREA SMALL TRIBUTARIES Mikołaj Lewicki and Lester McKee Sources Pathways.
Comparative Analysis of Loads of Mercury in Coyote Creek and Guadalupe River Lester McKee RMP SPLWG Chair San Francisco Estuary Institute
Trends in Suspended Sediment Input to the San Francisco Bay from Local Tributaries Presented by Setenay Bozkurt Philip Williams &
Status Report: Evaluation of Private Sector Data in Minneapolis Shawn Turner Texas Transportation.
River Regulation / Dam Construction – Effects on Rivers and Streams.
A Preliminary assessment and management of European hake Murleccius murleccius in the Egyptian coast of Mediterranean.
IGES Executive Roundtable on Climate April 25, 2012.
Irrigation Water Conveyance
Ann D Hirekatur Project Manager State of Lake Wisconsin Meeting July 13, 2013 Wisconsin River Basin Water Quality Improvement Project.
Michael D. Wells Deputy Director and Chief of Water Resources December 10, 2009 Missouri River Freight Corridor Development Forum.
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
EW112310H-0 1 Hydrometeorological, Entomological and Epidemiological Time Markers for Urban Malaria in Niamey, Niger Earle Williams Session H36: The Hydroclimatic.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Water Management of Turtle Lake Watershed Sept 29, 2007 by Don Dill.
Precipitation - Runoff Relations Watershed Morphology
Hybrid journals at Nature Publishing Group COASP 19 th September, 2013 James Butcher PhD Associate Director Open Publishing.
When you see… Find the zeros You think….
Targeted Retention of Contaminated Sediment in a Green Flood Retention Reservoir Development of an Integrated Management Strategy for Green Flood Retention.
Weekly Attendance by Class w/e 6 th September 2013.
A. Y. KARIKARI & RUBY ASMAH. Institutions involved: CSIR Water Research Institute Institute of Aquaculture, University of Stirling, UK. Duration of Project:
Dr. Emmanuel Obuobie Surface Water Division WRI Conference Room, Groundwater Futures in Sub-Saharan Africa (Grofutures)
Irene Seco Manuel Gómez Alma Schellart Simon Tait Erosion resistance and behaviour of highly organic in-sewer sediment 7th International Conference on.
Phosphorus Loads from Streambank Erosion to Surface Waters in the Minnesota River Basin D. J. Mulla Professor, Dept. Soil, Water, Climate University of.
1 Toshihiko Anzai 1* Katsuyuki Shimizu 2, Yoshinobu Kitamura 2, and Jumpei Kubota 3 1:The United Graduate School of Agricultural Sciences, Tottori University.
San Joaquin River Bedload Sampling summary January 4 and 5, 2011 April 1 and 2, 2011 Ledger Island.
Section 3: Stream Deposition
Selection of Capacity Selection of capacity depends on: Physical characteristics Physical characteristics Inflow outflow characteristics Inflow outflow.
Long Term Storage Long term storage means to store water during high inflows years for the benefit of low inflows years. Long term storage means to store.
Sustainability Considerations in the Design of Big Dams: Merowe, Nile Basin Mentor: Prof. El Fatih Eltahir Group: Anthony Paris, Teresa Yamana, Suzanne.
The Hydrologic (Water) Cycle. Surface Water Oceans Rivers and streams Lakes and ponds Springs – groundwater becomes surface water.
Water Quality Monitoring and Parameter Load Estimations in Lake Conway Point Remove Watershed and L’Anguille River Watershed Presented by: Dan DeVun, Equilibrium.
Water Quality Monitoring and Parameter Load Estimations in Lake Conway Point Remove Watershed, L’Anguille River Watershed, and Bayou Bartholomew Presented.
1 Module 2 Mekong Resources, Benefits to people, and Planning Issues session 1 : The Mekong and its water resources.
Sediment transport in wadi systems
APPLICATION OF THE FAST THEORY TO THE SEDIMENTOLOGY OF THE PAWMPAWM RIVER, GHANA Divine Odame Appiah, Dept. of Geography and Rural Dev’t, KNUST, Kumasi.
Flooding New Orleans, Aug Flooding –Varies with intensity and amount of rainfall –Perhaps the most universally experienced natural hazard Flood.
1 Evaluating and Estimating the Effect of Land use Changed on Water Quality at Selorejo Reservoir, Indonesia Mohammad Sholichin Faridah Othman Shatira.
Sediment Yield and Channel Processes. Definitions Suspend Sediment – sediment (orgranic or inorganic) which remains in suspension in water for a considerable.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Engineering Hydrology (ECIV 4323)
Nile Sedimentology Preliminary Research Anthony Makana Paris
Surface Water Chapter 9 Notes.
Section 13.1 Streams and Rivers
Stream Erosion and Transport
Impact of rainstorm-triggered landslides on high turbidity in a mountain reservoir Impact of rainstorm-triggered landslides on high turbidity in a mountain.
Fluvial Geomorphology GRG 338-C Streamflow (Discharge)
Hydrological Monitoring of TBIWRDP programme watersheds Anteneh Kibret, TBIWRDP, BoWRD.
Describe the features and characteristics of the Three Gorges Dam.
Section 3: Stream Deposition
Natural and artificial hydromorphological changes in Norway Agnès Moquet-Stenback – Section for erosion and sediment transport – Hydrology.
Water Resources Planning and Management
Regional Workshop on SoE water quantity reporting of ETC/ICM with West Balkan Countries Skopje January 2013.
Surface Water Applied Hydrology. Surface Water Source of Streamflow Streamflow Characteristics Travel Time and Stream Networks.
Predicting the hydrologic implications of land use change in forested catchments Dennis P. Lettenmaier Department of Civil and Environmental Engineering.
Pak Mun Dam Report on Case study
Hydrological changes resulting from dam construction
Confined Growth of Water Hyacinth for Bio-remediation in Caohai, Dianchi Lake , China: The Effects on Water Quality The topic of my presentation today.
The Hjulstrom Curve Predicting velocity.
Warm-up What are four things that impact INFILTRATION? (the answer is in your notes) After you finish the warm-up put your river basin project in the inbox.
Hydrology CIVL341.
Drought Management and Water Scarcity Adaptation
CLIMATE CHANGE IMPACTS ON THE WATER RESOURCES OF GHANA
Engineering Hydrology (ECIV 4323)
Hydrology CIVL341 Introduction
Engineering Hydrology (ECIV 4323)
“Characteristics of Suspended Sediment and Flow in Downstream of Mekong River, Southern Vietnam” 5/22/2019 Duong Thai Bang (M2) (Supervised by Prof. Maki.
Presentation transcript:

Presenter: Frederick Yaw Logah (RS) CSIR-Water Research Institute, Accra-Ghana 15th July, 2014

Funded by CSIR Water Research Institute Ofori D., F. Y. Logah, K. Kankam-Yeboah and B. A. Amisigo & F. Oblim, C. Asante-Sasu & G. Appiah CSIR-WRI Accra-Ghana 15th July, 2014

Introduction Objective Methodology/Activities Results and Discussion Conclusion/Recommendation

The Weija reservoir supply water to parts:  Accra metropolitan area  Central Region Anthropogenic activities  disposal of waste,  brick/tiles factory,  sand winning,  encroachment,  harvesting of fuel wood,  farming and  fishing  POLLUTION OF WATER  Resulting in high cost of treatment to GWCL.

Location: Lat. 5° 32.5’ N – 5°37’ N & long. 0° 20’ W - 0° 25’ W Surface area of reservoir: 30 km² Volume at MWL (16 m) : 133 M m³ Volume at NWL (15 m): 115 M m³ Mean annual precipitation: 800-1,150 mm Mean monthly Tempt: 23°C in August to 32°C in April (WRC, 2007). RH ranges between 50 % – 60 % in dry months 80 %-90 % in the wet season Mean Inflow into Dam: 54.2 m³/s Water Abstraction 30% of the mean annual inflow to the reservoir (Kumah and Ashley, 2008).

Sedimentation is an important environmental concern, affecting the useful life of a reservoir  Reduction in the carrying capacity of drains and reservoir  Flooding  reduction in water supply  Reduces water quality. This study therefore seeks to assess the quantity of sediments in the reservoir and trends of sediment entering the reservoir via the Densu River at Ashaladja

The specific objectives are to:  Estimate Annual Sediment Entering the Weija Reservoir from the Densu River at Ashalaja  To Develop a Suspended Sediment Rating Curve for the Densu River Basin at Ashalaja  Estimate the Total Volume of Sediment in the Weija Reservoir

Depth Int wading sampler (USDH-48) Sediment analysis using the Oven Dry Method (Tilrem, 1979) at the sediment laboratory of the CSIR-WRI Measurement: Suspended Sediment Location : Ashalaja Frequency: Weekly basis Period : Sept Aug Sampling points: 3 points along X-section Measurement: Suspended Sediment Location : Weija Reservoir Date: 25 th Jan, Sampling points: Dam, middle & delta Weija Reservoir

Flow velocity (V) measurement were taken at 1 m intervals along the cross-section by using either  six-tenths-depth methods or  2-point measurement Current meter Measurement: Flow velocity Location : Ashalaja Frequency: Weekly basis Period : Sept Aug Discharge computation: Q = VA

 The developed suspended sediment rating curve follows the power function. where, Q s is suspended sediment discharge in tonne/day, Q w is the river discharge (m 3 /s), a is an index of erosion severity and b is an exponent equal to the slope of the curve.

Results and Discussions

Suspended Sediment Discharge Suspended Sediment Rating Curve for the Weija Reservoir a = 2.94 and b = 1.06

 Relatively low mean specific suspended sediment yield from this study compared to other basins in Ghana (Akrasi, 2005 & Akrasi, 2008). River Basins Mean Specific Suspended Sediment Yield (t/km 2 /yr) Densu * 2.04 Pra 8.28 Ankobra 4.39 Tano 0.19 Ochi-Amisa 3.71 Ochi-Nakwa4.25

 Assessment of sediment transport into the Weija Reservoir was undertaken to understand the implications for water supply and the multi-purpose uses of water from the reservoir.  Annual sediment discharge into the Weija reservoir is more than 2.6 tonne/km 2 /year and the mean suspended sediment concentration in the water column in the reservoir  Suspended sediment rating curve was developed for the Densu River Basin at Ashalaja. The can be used to predict sediment discharge into the Weija Reservoir  Estimated volume of sediment deposited in the reservoir ranged from 0.1% and 0.7% of the Reservoir Volume of 115 Mm³.

Thank You