Phase 2 pixel challenges  ATLAS and CMS phase 2 pixel upgrades very challenging  Very high particle rates: 500MHz/cm 2  Hit rates: 1-2 GHz/cm 2 (factor.

Slides:



Advertisements
Similar presentations
TDC130: High performance Time to Digital Converter in 130 nm
Advertisements

10-Nov-2005US ATLAS Tracking Upgrade Santa Cruz 1.
Module design for B-layer replacement V.1. Bare Module dimensions mm Active area mm mm Footprint mm stack 200um chip 20um bumps.
Two Higgs are better than one: Physics at the Super Large Hadron Collider and the implications for the CMS Silicon Tracker Tom Whyntie 1 st year PhD student,
V. Re 1 INFN WP3 Microelectronics and interconnection technology WP3 AIDA meeting, CERN, May 19, 2010 Valerio Re - INFN.
ATLAS-CMS SLHC Workshop, 20/3/07 Costas Foudas, Imperial College London 1 Results from Studies for a Tracking Trigger for CMS at SLHC Overview of this.
Report on INFN activities CHIPIX65 - project
ITk Kick-off meeting, 4th November 2014Vaclav Vrba / Zdenek Dolezal / Miroslav Havranek 1 Participating institutions: Institute of Physics, Academy of.
Chip Developments of the Bonn Group Hans Krüger, Bonn University -1-
ATLAS users and SLAC Jason Nielsen Santa Cruz Institute for Particle Physics University of California, Santa Cruz SLAC Users Organization Meeting 7 February.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
Jorgen Christiansen on behalf of RD53
PG2 Solid State Tracking Detectors Seems like we are all newcomers here Topics are arranged according to R&D topic not sub-system as it was in 2013 – Meaning.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ATLAS/CMS/LCD RD53 collaboration: Pixel readout integrated circuits for extreme rate and radiation LHCC status and outlook report June Jorgen Christiansen.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
Hartmut Sadrozinski, SCIPP RD50 Sensor Meeting Trento, Feb. 28, Electronics Issues for sLHC Tracking Detectors Noise, Threshold Signal Signal/Threshold.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
ATLAS – CMS RD collaboration: Pixel readout integrated circuits for extreme rate and radiation The “pixel 65” collaboration 1.
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
Roger Rusack – The University of Minnesota 1.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
C ONSEQUENCES OF 1MH Z, 20 US TRIGGER ON PIXEL DETECTOR Jorgen Christiansen CERN/PH-ESE 1.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
Advanced Semiconductor Technologies for SLHC A. Marchioro / PH-ESE.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
RD53 Status Report – July 2014 L. Demaria - Report on RD53 - CMSTK week
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
RD53 IP WG 1 Jorgen Christiansen / PH-ESE. IP WG agenda General Issues IP block matrix (no recent changes) General schedule Specifications of IP blocks.
Development of Pixel Phase 2 chip. Goals New Pixel Chip needed to go beyond the Phase 1 baseline chip – Should be the solution for Phase 2 pixel – Should.
INFN Activities on Pixel Phase 2 Electronics L. Demaria on behalf of INFN institutes: Bari, Padova, Pavia/Bergamo, Perugia, Pisa, Torino 1/28/2014 L.Demaria:
ATLAS Trigger Development
65 nm technology for HEP: status and perspectives Pierpaolo Valerio, CERN on behalf of the RD53 collaboration.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Electronics for HL-LHC trackers NB: Only considering silicon trackers Jorgen Christiansen CERN/PH-ESE Acknowledgements to all my tracker colleagues from.
New Trigger Strategies Discussion Perimeter Institute HL-LHC Workshop June 8, 2015 Eva Halkiadakis, Matt Strassler, Gordon Watts.
NA61 vertex detector Status update from RBI effort Tome Anticic Ru đ er Bošković Institute.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
M. Gilchriese 1 Pixel R&D The useful lifetime of the innermost pixel layer is expected to be limited to a few years at design luminosity. However, there.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.
Jorgen Christiansen, CERN PH-ESE 1.  Finally officially part of CERN grey book: Recognized experiments  Spokes persons and Institute chair elected 
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
Elia Conti on behalf of the RD53 Collaboration RD53: status and main activities for 2016 ACES 2016 – Fifth Common ATLAS CMS Workshop for LHC Upgrades –
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Trigger & Tracking detector for CMS
Technology and R&D Summary and next steps Burkhard Schmidt.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
RD53 status and plans. Pixel readout integrated circuits for extreme rate and radiation 4th LHCC status report Jorgen Christiansen and Maurice Garcia-Sciveres.
Charge sensitive amplifier
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Hybrid Pixel R&D and Interconnect Technologies
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
ARAMIS Is it an interesting event?
SVT detector electronics
SVT – SuperB Workshop – Frascati Sept. 2010
Tracking in SuperLHC 1. Radiation damage
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Phase 2 pixel challenges  ATLAS and CMS phase 2 pixel upgrades very challenging  Very high particle rates: 500MHz/cm 2  Hit rates: 1-2 GHz/cm 2 (factor 16 higher than current pixel detectors)  Smaller pixels: ¼ - ½ (25 – 50 um x 100um)  Increased resolution  Improved two track separation (jets)  Participation in first/second level trigger ? A.40MHz extracted clusters and shape (outer layers) ? B.Region of interest readout for second level trigger ?  Increased readout rates: 100kHz -> 1MHz  Low mass -> Low power  Very similar requirements (and unc ertainties) for ATLAS & CMS  Unprecedented hostile radiation: 10MGy(1Grad), Neu/cm 2  Hybrid pixel detector with separate readout chip and sensor.  Phase2 pixel will get in 1 year what we now get in 10 years  Pixel sensor(s) not yet determined  Planar, 3D, Diamond, HV CMOS,,,  Possibility of using different sensors in different layers  Final sensor decision may come relatively late.  Very complex, high rate and radiation hard pixel readout chips required 2 ATLAS HVCMOS program

RD53 collaboration recently approved by LHCC  Similar requirements, same technology choice and limited availability of rad hard IC design experts in HEP makes this ideal for a close CMS – ATLAS RD collaboration  Even if we do not make a common pixel chip  Initial 2day workshop between communities confirmed this.  Workshop:  Forming a RD collaboration has attracted additional groups and collaborators  Synergy with CLIC pixel (and others): Technology, Rad tol, Tools, etc.  Institutes: 17  ATLAS: Bonn, CERN, CPPM, LBNL, LPNHE Paris, NIKHEF, New Mexico, RAL, UC Santa Cruz.  CMS: Bari, Bergamo-Pavia, CERN, Fermilab, Padova, Perugia, Pisa, PSI, RAL, Torino.  Collaborators: 99, ~ 50% chip designers  Collaboration organized by Institute Board (IB) with technical work done in specialized Working Groups (WG)  Initial work program covers ~3 years to make foundation for final pixel chips  Will be extended if appropriate: A.Common design ?, B.Support to experiment specific designs 3

RD53 e CHIPIX65 NameRD53CHIPIX65 R. BeccherleEng. Designer30% - Responsabile WP2 R. BellazziniPhys. FERMI-GLAST L. Fanucci *Engineer Prof F. MorsaniEng. Designer25% G. MagazzùEng. Designer30% M. MinutiEng. FPGA expert F. PallaPhys. CMS20% A. Rizzi *Phys. CMS S. Saponara *Engineer Prof M. T. GrippoPhD Student10% K. AndrosovPhD Student S. DonatoPhD Student * Also Pisa University