INFOMØTE 22.MARS INNFØRING AV ASAP NYTT VFR MØNSTER RY
7. April 2011
Oslo ASAP AIRSPACE Operational objectives: Oslo ASAP is intended to develop a new airspace structure within the Oslo AoR, including SIDs and STARs for Oslo and Farris TMA. Ensure adequate capacity in Oslo and Farris TMAs and in Oslo ACC while keeping: –Safety at a high standard; –Controllers’ workload at an acceptable level. Ensure efficiency of operations so as to: –Reduce CO2 emission; –Accommodate Noise Abatement Procedures (ENGM).
Proposed Sectors and Positions OSLO and Farris TMAs APP WEST APP EAST FIN DIR (DIRW / DIRE) FARRIS WEST FARRIS EAST Sectorisation ACC S1 S2 S3 S4 S5 S6 S7 S8 (FARRIS) 124,35 134,05
Principles of Point Merge
FL100 FL110 FL120
TMA Holdings
ENTO RWY 36
ENRY RWY 30
ENRY RWY 12
BUKTEN SALTNES MAX 1000 MAX 1500 MAX 1500 BEVØYA N E TOR R ,5NM N E TOR R ,7NM N N TOR R ,7 NM