NERC Policies Introduction

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
June 22, 2005 NAESB Board of Directors Meeting, San Antonio, Texas 1 North American Energy Standards Board Meeting of the Members NAESB Board of Directors.
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
NAESB Coordinate Interchange
Standards Review Subcommittee Update October 22, 2013.
The National Standards and Quality System Jean-Louis Racine The World Bank Cambridge, England April 19, 2007 Knowledge Economy Forum VI Technology Acquisition.
Report of the Operating Committee Don Watkins Operating Committee Chair April 28, 2009.
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
NERC Orientation Joint Guidance Committee WECC Leadership
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
The Managing Authority –Keystone of the Control System
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Communicating over the Network
The UEA House of Delegates Directing YOUR Association through the democratic process. 1.
March, 2000 Order 2000 for SERC 1 Powersmiths Intl FERC Order 2000 Summary March, 2000.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
EMS Checklist (ISO model)
Vision: A strong and capable civil society, cooperating and responsive to Cambodias development challenges 1.
ABC Technology Project
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
1 Where we are & Where we need to go. January 11, 2011 SILC Congress, Atlanta, GA Independent Living Administration.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
CUG Meeting June 3 – 5 Salt Lake City, UT
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Influencing Public Policy Bob Howard President, CIA Canadian experience.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Slippery Slope
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Cost Ranges for the Development and Operation of a Day One Regional Transmission Organization PL
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Overview of WECC and Regulatory Structure
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
NERC Reliability Standards - Development Process: Involvement & Needs Presentation to MOSC January 14, 2004 Khaqan Khan Independent Electricity Market.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Reliability and the Market Place Perfect Together The Transition from NERC to NAERO Baltics Working Group June 6, 2001 Princeton, NJ The Transition from.
Presentation transcript:

NERC Policies Introduction It probably won’t be on the test, but let’s take a few minutes to review a brief history of the North American Electric Reliabilitly Council.

What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational objectives Define and measure reliability Influence and interpret legislation regarding the power industry Study interregional connections There were several electric utility organizations around the country before NERC but their efforts were not as well coordinated as the work that NERC does today. The event that is most responsible for the organization that we know as NERC was the 1965 blackout of the northeastern U. S. and southeastern Ontario, Canada. As a result of the blackout, the U. S. government ordered a formal investigation of the event. The Federal Power Commission, now known as the Federal Energy Regulatory Commission, made several recommendations as a result of the investigation including the Electric Power Reliability Act of 1967. One recommendation was the formation of a national council on power coordination. The resulting organization was named the National Electric Reliability Council. In 1981, the name was changed to the North American Electric Reliability Council in recognition of Canadian membership but the acronym remained the same.

NERC Regions NPCC MAPP MAAC ECAR WSCC MAIN SPP SERC ERCOT FRCC NERC is “owned” by its ten regional councils. ECAR WSCC MAIN SPP SERC ERCOT FRCC

NERC Organization Board of Trustees Engineering Committee Operating Committee The activities of NERC are directed by its Board of Trustees. The technical activities of NERC are carried out by the Engineering Committee and the Operating Committee. The committees and their subgroups are comprised of managerial and technical representatives from the Regional Councils and from electric industry ownership segments, and end-use customers as appropriate.

NERC Operating Committee Mission To promote the reliability of the electricity supply for North America, To establish Policies, To monitor compliance, To provide a forum for dealing with issues. The are several pages in the NERC Operating Manual detailing operating committee organization and procedures.

NERC Standards Development Players Standards Committee Operating Committee Engineering Committee Subgroup Due Process Appeals Committee Technical Appeals Committee NERC standards include NERC Operating Standards and Requirements and Planning Standards and associated measurements for determining compliance. Standards Committee. The NERC Operating Committee (OC) or Engineering Committee (EC). Subgroup. A subcommittee, working group, or task force of the OC or EC, usually where NERC Standards are drafted and posted for review. Due Process Appeals Committee. The committee that receives comments from those who believe that the “due process” procedure was not properly followed during the development of a Standard. The Due Process Appeals Committee consists of three Board representatives selected by the Board Executive Committee to serve a term of one year. Not more than one representative of the various electric industry sector, Canada, and end-use customer representatives may serve at the same time on the Due Process Appeals Committee. The NERC Vice President shall be the staff coordinator for the Due Process Appeals Committee. Technical Appeals Committee. The committee that receives comments from those who believe that the “due process” was not properly followed during the development of a Standard. The Appeals Committee consists of the vice chairs of the Operating Committee, Engineering Committee, and Board, the NERC Vice President, and the appellant party.

Standards Development Process 1. Request to revise or develop standard 2. Assignment to subgroup 3. Drafting phase and Internet announcement 4. Draft standard posted for comment 5. Subgroup deliberates on comments 6. Draft standard submitted to Standards Committee 7. Standards Committee votes on recommendation to Board 8. Appeals processes 9. Board approves 10. Standard implementation or further appeals

Waivers to NERC Operating Policies Instances when an entity cannot comply with a NERC Operating Policy Requested from the Operating Committee Waiver request must include an alternative plan Temporary The OC expects instances when an entity will not be able to comply with an operating policy.

Waivers in Effect Scheduling Agent Financial Inadvertent Settlement Alliance RTO Midwest ISO Southwest Power Pool GridSouth Financial Inadvertent Settlement Control Performance Standard 2 ERCOT For this version of the Operating Manual, there are 3 waivers in effect. ERCOT waiver Single control area Asynchronously connected to the other interconnections Creates no inadvertent flows

Personnel Subcommittee Responsible for support materials Promotes sharing of knowledge Periodically reviews NERC Operating Policies pertaining to System Operator training and certification and recommends revisions Establishes policies and standards for NERC System Operator Certification Serves as the interim governance body for the NERC System Operator Certification Program

Introduction to the Operating Policies NERC Doctrine Policies -- Place responsibility for operating reliability on the Control Areas Standards -- Requirements that are measurable and may be audited with surveys Requirements -- Describe the obligations of a Control Area Guides -- Operating practices to be considered NERC by-laws require mandatory compliance with Standards and Requirements.

Interconnections Eastern The largest interconnection DC ties to the Western and ERCOT interconnections Western Interconnection 2nd largest interconnection DC ties to the Eastern Interconnection ERCOT

Control Area An electrical system bounded by interconnection (tie-line) metering and telemetry Two requirements: Directly controls its generation to balance its actual and scheduled interchange Helps regulate and stabilize the Interconnection’s alternating-current frequency

Control Area Obligations Interchange balance Interconnection frequency

Interchange Balance Control Areas are connected by tie lines. Tie Line metering Control Area calculates net actual interchange Control controls actual interchange and contributes to frequency regulation with AGC Control Area is obligated to attempt to match is net actual and net scheduled interchange

Generation & Load Balancing Control Area A tie line flow = 100 -150 + 100 - 50 = 100 MW 150 MW 50 MW Control Area D Control Area C Control Area E Control Area B

Interconnection Frequency Automatic Generation Control (AGC) Generator governors

Compliance Control Areas are obligated to adhere to all NERC Operating Requirements and Standards. Control Areas are approved and certified by the NERC Performance Subcommittee and the appropriate Region.

Control Area Reporting Inadvertent Interchange Accounting Control Performance Surveys Area Interchange Error Surveys Frequency Response Characteristic Surveys Frequency Bias Settings Allowable Limit of Average Deviation Survey

Security Coordinators Established in 1996 Established the requirements for sharing of data and information about the “health” of the Interconnection Established the Interregional Security Network for each Interconnection Required every Region, subregion, or interregional coordinating group to establish a Security Coordinator Required that each Region develop a security plan Rely on common operating terminology, criteria and standards

Operating Policy Layout

NERC Operating Policy Terms Several pages of terms and definitions are located in the Operating Manual

Confirmation as a Control Area To be recognized as a NERC-Certified CONTROL AREA, the entity must be reviewed by the REGIONAL COUNCIL in which the entity is a member and and confirmed that it meets the requirements of the specified Criteria.

Control Area Criteria Generation Metering Communications Transmission Arrangements System Operators E-tag Services Performance Surveys Back-up Control Center Coordination System Restoration Compliance with NERC Operating Policies and Standards

Security Coordinator Standards of Conduct

Security Coordinator Standards of Conduct Independent of employees/persons who engage in retail or wholesale merchant functions Abide by rules governing employee conduct Written procedures publicly available and provided to all Security Coordinator employees

Questions?