Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Presentation transcript:

Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to 4.5K complete in both rings! – Dec. 5, beam setup in RHIC begins. – Dec 16, 20 hr unplanned Maintenance day – Dec 20 (AM)-21(PM), blizzard 09 shut us down – Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late) – Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared  s=200 GeV/n Au-Au – Jan 2 (midnight) STAR in Physics Mode – Jan 8 (0600) PHENIX in Physics Mode – Jan 12, Rebucketing not yet routine – Mar. 11, End 10 week  s = 200 GeV/n Run, begin  s = 62.4 GeV/n setup – Mar. 13, Begin 4 week  s = 62.4 GeV/n run – Apr. 10, End 4 week  s = 62.4 GeV/n Run, begin  s = 39 GeV/n setup – Apr. 12, Begin 1.5 week  s = 39 GeV/n run – Apr. 23, End 1.5 week  s = 39 GeV/n Run, begin  s = 7.7 GeV/n setup – Apr. 25, Begin 4 week  s = 7.7 GeV/n run – May 20, End 4 week  s = 7.7 GeV/n Run, begin  s = 5.0 GeV/n setup – May 23, End 4 week  s = 7.7 GeV/n Run, begin  s = 5.0 GeV/n setup – May 25, begin 0.5 week beam studies at  s = 5 GeV/n and ~ – 25 CRYO WEEK – This is it unless we have $’s to run longer – revisit in March – May 29, end 0.5 week studies – May 31, begin  s = 11.5 GeV/n for STAR – Jun 15, end 2 week  s = 11.5 GeV/n run – Jun 15, Begin Cryo Warm-up – Jun 16, Warm-up complete, Run 10 ends – 28.2 CRYO WEEKS

Through 11 Jan store 11433, ZDC Singles correction for STAR is wrong, PHENIX ZDC thresholds adjustments in progress (?)

Through 11 Jan store 11433

Ring Bunches/Cycl es Avg Bunch in RHIC (10^6 ions) Avg Efficiency XCBM to RHIC XCBM to Uxf1Uxf1 to WxfWxf to ArcArc to RHIC Blue56/ Yellow56/ Injected Beam Statistics for Fill number Started filling RHIC: Thu Dec 31 22:51: , Fill complete: Thu Dec 31 22:59: , Minutes to fill: 7 31 Dec 1 st Physics Store Ring Bunches/Cycle s Avg Bunch in RHIC (10^6 ions) Avg Efficiency XCBM to RHIC XCBM to Uxf1Uxf1 to WxfWxf to ArcArc to RHIC Blue68/ Yellow68/ Injected Beam Statistics for Fill number Started filling RHIC: Tue Jan 5 03:22: , Fill complete: Tue Jan 5 03:32: , Minutes to fill: 9 5 Jan Physics Store Ring Bunches/Cycl es Avg Bunch in RHIC (10^6 ions) Avg Efficiency XCBM to RHIC XCBM to Uxf1Uxf1 to WxfWxf to ArcArc to RHIC Blue111/ Yellow111/ Injected Beam Statistics for Fill number Started filling RHIC: Tue Jan 12 07:19: , Fill complete: Tue Jan 12 07:24: , Minutes to fill: 5 12Jan Physics Store

Run 10, 31 Dec through 12 Jan (AM) 1 st Physics Store 11340

106 x 10 9 /111 = 0.96x10 9 /bunch 111 x 10 9 /111 = 1.0x10 9 /bunch 20 min after first collisions Fill (12 Jan) Injected Beam Statistics from ELOG Blue = 111 bunches 1.10x10 9 /bunch Yellow= 111 bunches 1.15x10 9 /bunch

12 Jan Store 11438, singles corrected (Preliminary, STAR has issues) No rebucketing Loss in 3 hrs = 27900/7800 = 3.6 L peak ~37x10 26 cm -2 s -1 Loss in 3 hrs = 18000/6200 = 2.9

Min L peak Max L peak Within 20%!! 1/11 – 1/12 stores, singles corrected (Preliminary, STAR has issues) No rebucketing Max L store avg Min L store avg

Through 1/7/10

Future Topics Toward Smaller beta* - new quad triplets – D. Trbojevic

Archive

5 June 0714 (w/o stochactic cooling) 1.02 x 10 9 /bunch 0.97 x 10 9 /bunch Run 7 Fill 8878 Injected Beam Statistics from ELOG Blue = 103 bunches 1.04x10 9 /bunch Yellow= 103 bunches 1.13x10 9 /bunch

5 June 0715 Store 8849 (w/stochactic cooling) 1.02 x 10 9 /bunch 0.97 x 10 9 /bunch Run 7 Fill 8849 Injected Beam Statistics from ELOG Blue = 103 bunches 1.23x10 9 /bunch Yellow= 103 bunches 1.15x10 9 /bunch

5 June 0716 Physics ON Loss in 3 hrs = 3.1 = 3.7

Physics production or beam studies weeks  s NN (GeV) 25-cryoweek run27-cryoweek run STAR Beam 5 GeV  Revised Run 10 Plan, Nov 25, 2009

Run 10 Au-Au Goals 11/19/09 STAR –  s = 200 GeV/n Luminosity Sampled/Delivered = 2/4 nb M Central Events 300M Min-bias events PHENIX –  s = 200 GeV/n Luminosity Recorded/Delivered = 1.4/>6 nb -1 Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb -1

Run 7 Fill 8544

Through 30 Nov 09

– Oct. 5, N2 scrubbing – Oct. 30, Temp. Control devices in and ready (required for 45 K wave cooldown). – Nov. 2, 45 K wave begins. – Nov. 12, AGS Testing. – Nov , APEX Workshop – Nov. 16, beam setup in Booster and AGS – Nov , RHIC Dry Run – Nov 22, Beam extracted from AGS to W dump Run 10 Setup

Wednesday midnight Thursday midnight

25 Cryo Weeks