The tunnelling for the “Metro do Porto” By Alex Wilson & Frances Coker Singhateh.

Slides:



Advertisements
Similar presentations
Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.
Advertisements

Geotechnical-Geophysical Void Mapping and Foamed-Sand Backfilling of the Rapson Coal Mine, Colorado Springs, Colorado – Case Study Kanaan Hanna, Jim Pfeiffer.
CONSTRUCTION DRILLING INC.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Presentation by Bert J Huls Prepared by Les MacPhie August 13, 2005
Post Graduated Master Course TUNNELLING AND TUNNEL BORING MACHINES
Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.
BOX PUSHING TECHNOLOGY
A geo-guide for non-specialists Are you prepared? Underground risks – face them, don’t hide from them!
 1 Stormwater Management and Road Tunnel A “SMART” Solution Transportation Research Board Committee ADC60 Sustainable and Resilient Infrastructure Workshop.
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
Environmental Drilling By: Josh Humphreys October 8,2006.
Soil & Site Investigation
Michael Swinford Bechtel International Project Director, Autostrada Transilvania Friday 22 nd October 2010 Albanian Motorway Project A New Direction.
Foundations Purpose – To transfer weight of structure (including live loads) to the ground within allowable settlement criteria.
Tunnelling Methods.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
MEXICO CITY’S SINKING CATHEDRAL
GROUNDWATER CONTROL.
Project details • New headquarters for HKSB
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.
Foundations Excavations
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Subsidence Natural Man induced. Natural subsidence Plate tectonics – regional changes in land and water.
Weathering, Erosion, and Landforms
Soils Investigation Soil Investigation
Geotechnical investigation and risk assessment at Budapest metro line 4 Dr. Tibor Horváth Geovil Ltd. INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND.
Railway and Metro Tunnels
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
ITA Croatia TÜLİN SOLAK Temelsu International Engineering Services Inc. Congress centre “Lacroma”, Dubrovnik April, 7-9, 2011 ITA Croatia “TUNNELING ACTIVITIES.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
Geo-Engineering In North Wales A Study of the A55 Between Chester and Anglesey.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
The Tunnel Dismantling Machine (TDM)
CHANNEL TUNNEL!!!!!! BY JAKE. FAB FACTS!!! 1.The channel tunnel is 31.4 miles long and it’s the 11 th longest tunnel in the world 2.The project costs.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
SUBMERGED FLOATING TUNNELS
Sardar Vallabhbhai Patel Institute Of Technology,Vasad.
Construction Beam Tunnel
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
DIAPHRAGM WALLS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
TUNNEL BORING MACHINE GUIDED BY: Vineeth SUBMITTED BY: Aswin Gopal.V.T
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
Geotechnical Engineering II
Acciona Infrastructuras Canada
TRENCHLESS TECHNOLOGY
Well 38 Drilling & Testing Amendment
Mole robot INTRODUCTION
Soil & Site Investigation
REVISION 1 1. Foundations.
N.N.Som Consulting Geotechnical Engineer
Reedy River Basin Sewer Tunnel Project Update
An Introduction to Subway Construction Technology
Large Air Systems – Sales Training
Presentation transcript:

The tunnelling for the “Metro do Porto” By Alex Wilson & Frances Coker Singhateh

Where is Porto? North-west coast of Portugal, on the mouth of the river Douro

The metro lines

Metro Format  Comprises 70km of light railway, of which roughly 6.1km is in bored tunnel.  12 stations are located underground and were excavated for using the NATM tunnelling system.  Original Budget was 750 million Euros (55million euros allocated to tunnelling)  Tunnelling started in June 2000 and finished 42 months later.

Tunnel – standard underground line Surface –urban areas with crossroads and traffic lights Surface – segregated channel with level crossings

Major constraint was in the CBD  Porto is built on a relatively high gradient river valley.

Porto’s Geology  Porto is built on a highly variable granite Batholith.  Medium grained 2 mica (igneous rock) granite, which has undergone deep weathering due to the help of tectonic movements, such that decomposed granite are felt next to fresh granite at various depths and locations.  Tunnels pass through ~ 6 grades of weathering (W1-W6) and alteration ranging from fresh granite to cohisionless granular soil.  High water levels, man made ‘minas’ and deep wells increased the challenge ahead.

MAN MADE WATER MINES

A typical distribution of weathered granite taken found at the face of the EPB driven Tunnel. The different degrees of weathering of the granite taken from a borehole. The weathered granite on the left side is at a depth of 24m under the sound granite of the right.

Tunneling  3 tunnels were to be excavated by a TBM EPBM boring at up to three bar pressure.  They were lined with pre- cast concrete segments of 7-9 m internal diameter  The machine had a nominal face opening of 20% to allow excavated material to flow through the machine face.  A continuous conveyor belt was used to remove the soil before trucks took it away.

COLLAPSE OF TUNNEL  No sooner had the boring started work on the tunnel, it was stopped as two houses collapsed resulting in the death of one.  This was the third and largest collapse till the surface and it left a 250m³of hole.  This happened due to the over excavation and face collapse in the extremely heterogeneous geology.

THE COLLAPSE HOUSES

First Action  A commission of inquiries was set up by the government.  16 recommendations were concluded as a specification guide.  The Engineer, Construction manager and the contractor were forced re-think their roles.

First Action (cont.d)  It concluded that the accident could have been avoided.  Reinforcing team with trained geotechnical engineers.  Advance knowledge of area to be drilled before the boring is used.  Investigation of the ground structure resulted in an additional machine, in preparation for advance tunnelling.

Solutions  Panel of experts after reviewing came up with two proposals about the EPBMs  - The use of an automatic bentonite injection system.  - An additional double piston pump.

Herrenknecht EPB TBM and Pressure Mechanism

CONTRACTOR’S MODIFICATION  10 independent foam generators.  New rotary fluid joint.  New twin belt weighing system.  An early alert system in place when an operator reaches any critical level.

CONCLUSION  Despite the safety precautions in place the use of TBM was recommended.  Daily meetings held with management team to share information and any problem that may arise.  Could have tried other tunneling methods (i.e.Cut-and-cover method, Drill and blast, Immersed tube method, Lunardi Method, Slurry-shield machine, Wall-cover construction method )

References  hoek/references/H2004e.pdf hoek/references/H2004e.pdf hoek/references/H2004e.pdf  os/downloads/conference_inaveiro.pdf os/downloads/conference_inaveiro.pdf os/downloads/conference_inaveiro.pdf  hoek/references/H2005c.pdf hoek/references/H2005c.pdf hoek/references/H2005c.pdf  alsworld/feature-pdfs/jul06/Porto%20pressure.pdf alsworld/feature-pdfs/jul06/Porto%20pressure.pdf alsworld/feature-pdfs/jul06/Porto%20pressure.pdf  ms/fileadmin/filemounts/ge ms/fileadmin/filemounts/ge ms/fileadmin/filemounts/ge neral/pdf/ItaAssociation/ProductAndPublication/Train ing/Seminars/2006-lisbon/Cunha_abstract.pdf  s/newsite/events/Genmeet_2 s/newsite/events/Genmeet_2 s/newsite/events/Genmeet_2  005_Marques.ppt#685,28,II. Engineering 005_Marques.ppt#685,28,II