1 IEEE 802.16m-09/0019 2009-05-19 Work Plan for IEEE 802.16m Standard & IMT-Advanced Submission.

Slides:



Advertisements
Similar presentations
Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Advertisements

Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, November Date: Author:
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Doc.: IEEE /1392r0 Submission November 12, 2008 De Vegt (Qualcomm)Slide 1 Inputs for a VHT Selection Procedure Date: Authors:
Doc.: IEEE /0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide TGn Editor Report May 2009 Date: Authors:
Doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project.
Doc.: IEEE 802.EC-10/xxxxr0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Date: Authors:
802.16m Closing Report May 13, 2010 Bangalore, India Session # m-10/
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
802.16m Opening Report January 12, 2009 San Diego, CA Session # IEEE m-09/0005.
IEEE m-08/ m Closing Report May 15, 2008 Macau Session #55.
Doc.: IEEE Submission March 2006 Robert F. HeileSlide st Session of meetings of the IEEE Working Group for Wireless.
Vivek Gupta, Chair WG Joint Opening Plenary IEEE Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta
802.16m Opening Report August 16, 2010 Calgary, Alberta, Canada Session # IEEE m-10/0024r2.
802.16m Closing Report November 11, 2010 Dallas, Tx Session # IEEE m-10/0035.
DOCUMENT #:GSC15-PLEN-15 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Opening Plenary 6.1 TD-SCDMA & TD-LTE Standard and.
Doc.: IEEE tvws Submission September 2009 Stanislav Filin et al, NICTSlide 1 Comments to WS coexistence draft PAR Notice: This document.
Omniran ecsg 1 OmniRAN EC SG November 2013 EC Opening Report Chair: Max Riegel (NSN)
Doc.: IEEE Submission March 2008 Michael Lynch, Nortel Networks Update on ITU-R and IMT-Advanced At the November meeting IEEE 802:
Doc.: IEEE sru Submission November 2013 Shoichi Kitazawa(ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Submission doc;IEEE sru July 2014 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0021r2 Submission July 2008 Jing Zhu, Intel CorporationSlide 1 IEEE 802 Air-Interface Support for Co- Located Coexistence Notice:
Doc.: IEEE /0810r0 Submission May 2011 Minho Cheong, ETRISlide 1 Selection of Key Requirement Elements for Baseline FR-EM Document Date:
1 IEEE m-07/001r Work Plan for IEEE m Standard & IMT-Advanced Submission.
1 IEEE m-09/0019r Work Plan for IEEE m Standard & IMT-Advanced Submission.
Proposal for IMT-Advanced Development Work Plan for m Document Number: IEEE C /030 Date Submitted: Source: Jose Puthenkulam
xxx July, 2007Peretz Feder IEEE MEDIA INDEPENDENT HANDOVER DCN: xxx Title: Liaison Report – Work Related to.
Proposed TGm Plans for Upcoming Sessions & Work Plan Updates IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1646.
Doc.: IEEE /0024r0 Submission February 2010 Päivi Ruuska, NokiaSlide 1 Process Considerations Notice: This document has been prepared to assist.
Proposed Feature Rapporteur Group Timelines and Call for contributions IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0762r2.
Proposal for TGm SDD Call for Proposal Topics Schedule Document Number: IEEE C802.16m-08/256 Date Submitted: Source: Jose Puthenkulam
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0747r1 Date Submitted: Source:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1181 Date Submitted: Source:
802.16m Closing Report July 16, 2009 San Francisco, CA Session # IEEE m-09/0035r1.
Updates Required for the m Work Plan IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0741 Date Submitted:
Incremental Process for
Suggestion to update Work Plan for IEEE m Standard
Comments on Standards Development Process
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE TGa Project Timeline
Work Plan for IEEE m Standard & IMT-Advanced Submission
July 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, July.
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
Comments on Standards Development Process
Submission Title: [Proposed project timeline]
IEEE MEDIA INDEPENDENT HANDOVER
Sept 24, 2009 Waikoloa, Hawaii Session #63.5
Liaison Report Date: Author: Jan 2008 Month Year
TGac Status and Timeline
IEEE IMT-Advanced Review Process
Submission Title: [Proposed project timeline]
802.11bd Timeline Date: Authors: January 2019
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Proposed timeline for the Light Communications TG
IEEE SGa Project Timeline
September 2009 Closing Report
Timeline for the Light Communications TG
802.11be Timeline proposal Date: Authors: May 2019
TG 1 November Session Opening Report
July 2014 doc.: IEEE /21/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Nov 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, Nov.
TGbd Closing Report – Vietnam
Presentation transcript:

1 IEEE m-09/ Work Plan for IEEE m Standard & IMT-Advanced Submission

2 Documents to be Developed in TGm TGm will develop the following documents as part of m standardization process: –System Requirements Document (SRD) A set of possible deployment scenarios and applications of the m standard. A set of performance targets and features that m compliantsystems shall meet or exceed. –Evaluation Methodology Document (EMD) A complete set of parameters, models, and methodologies for the link-level and system-level simulations that allow fair evaluation/comparison of various technical proposals. Channels Models: A set of spatial channel model parameters are specified to characterize particular features of MIMO radio channels to be used for simulating technical proposals for the future m standard. –System Description Document (SDD) Architecture and design of the m air interface amendment Captures the core technical concepts behind the features included in the amendment Will enable analysis and/or simulations for characterizing the coarse level performance benefits of the air interface in association with the Evaluation Methodology Document –802.16m amendment – IMT-Advanced Proposal

3 TGm Timelines Sep ’07* Jan’08* Jan 09* Letter Ballot Sponsor Ballot Jan’10Nov ’08 Nov ’07 Jan ’09 IEEE m m Amendment IMT Advanced Proposal System Description System Requirements Evaluation Methodology ITU-R IMT Advanced IMT.TECH IMT.EVAL IMT.RSPEC Jun ’08 Oct ’08 Proposal Submission Jan’09 Circular Letter Jun ’08 Proposal Evaluation & Consensus BuildingDevelop Recommendation Q2Q3Q4Q1Q2Q3Q Q1Q2Q3Q4 Apr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov Dec Q1Q2Q3Q Oct ’09 Jun ’10 Final Proposal Sept ’09* *System Requirements and Evaluation Methodology, System Description, IMT-Advanced Proposal Documents may be further updated based on ITU output (shown by dotted lines). ITU based potential updates Refinements AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec IEEE ITU-R WP5D May ’10 ITU based Updates 3 Amendment Ready for IMT- Adv evaluation July ’09 Working Doc Amendment Feature Complete. EC Conditional Approval for SB. Amendment Ready for Industry Release. RevCom submission EC Conditional Approval for RevCom submission

4 Process for staging m Amendment feature development WG LB SB PHY/MAC features required for IMT- Advanced for a working system Feature 1 Feature 2 Feature N Feature N+1 Next Project (New PAR) AWD 50% 75% RG P802.16m draft RG Amendment Feature development: -Feature developed as a RG contribution to TGm -Finally included only as a complete proposal, not a partial one -Develop as a self contained clause/subclause unless it is essential -Do not put place holders in Amendment till the feature is ready. (SDD will still have all features) -RGs should track Amendment development for consistency -WG LB recirculation scope should allow feature addition -All features have to go thru at least one WG LB recirculation Feature inclusion vote 50% AWD = Amendment Working Doc RG = Rapporteur Group LB = Letter Ballot SB= Sponsor Ballot Final feature addition meeting

5 Feature RG process for the Amendment Feature Rapporteur Groups (RG) will develop contributions for adoption by TGm as per Process (in previous slide) RGs will be authorized/re-authorized at each TGm session TGm will provide final deadlines for completion of RG work. RG must start with a work plan based on TGm final deadlines. RGs must report progress at every TGm session RG final output contribution must be complete by TGm deadlines for adoption into the AWD/Draft RGs may meet during TGm sessions RGs can arrange teleconferences with 7 day advance notice RGs conduct straw polls for decision making RGs are open to all participants

6 Amendment Feature RG timelines SDD Cha pter Features to be discussed in RGs Essential for IMT-Adv. at Amendment level detail CFC Issued for FeatureRG Target for completion 12Inter-Radio Access Technology Functions (No SDD text) NoNA LBSNoTo be decided in July’09Nov’09 14E-MBSNoTo be decided in July’09Nov’09 15RelayNoTo be decided in July’09Nov’09 16Co-deployment and Co- existence (No SDD text. Section deleted this session) NoNA FemtocellNoMay’09Sept’09 18Self organizing networksNoTo be decided in July’09Nov’09 20Interference MitigationNoMar’09Sept’09 22Inter-ABS Synchronization NoTo be decided in July’09Nov’09