SALES PRESENTATION : WATER CLOSET SUPPORTS 0211Y-M54-XX 0240Y-M54-XX.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Structural Steel Construction
Unit 43 Wall Framing Wood-framed Wall Components • Constructing Wood-framed Walls • Sheathing Exterior Walls • Weather Barriers • Rainscreen Walls • Structural.
FVCC Fire Rescue Forcible Entry.
Interior Wall and Ceiling Finish
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Cabinet and Countertop Installation
The idea evolved from two different contractor customers who shared with us a better way to perform hydrostatic testing of DWV piping system. Two different,
Kevin Coke ID#: Rochede Sibblies ID#: Sandrene Haughton ID#:
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Introducing Finelite Series 14. White Cross BladeRound Perf Concave Shield Square Perf Concave Shield Each shielding type is finished in 96% reflective.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Service Technician Training
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Joining, Installing, and Supporting Pipe
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7.
Architectural Drawing
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
PowerPoint Presentation
Skilled Trades 1201 Floor Framing
Condensation Piping and Installation Drain Pans
PLUMBING FIXTURES INTRODUCTION CLASSIFICATION WATER DEMAND TRAPS
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
Competency: Draw roof plans
Chapter 4: Air Leakage Control: Materials and Techniques
Blodgett Cafe Series July Cafe Series Spec Sheets 24” Range 36” Range 48” Range 60” Range 72” Range Radiant STK Infrared STK Banquet Broiler Cheesemelter.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Alarmline Linear Heat Sensor Typical Applications.
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Wall and Ceiling Construction
Roof and Ceiling Framing
Competency: Draw wall sections and details
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Chapter 28 Structural Components of Framed Construction.
CON 4003/CVE 4073/CVE 5073 Construction Estimating Prof R. V. Locurcio.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
After the roof design is selected, the next decision is the type of roof construction-- trusses or stick built. Trusses. Less labor to install trusses.
Unico Tips and Tricks. First Steps Layout and material list to be done by the salesman Wear Hospital Style Booties, if working in a non-drop cloth area.
APPLICATIONS OF TECHNOLOGY
Unit 209: Drainage systems
Structural Components
The GranView Fireplace
AMP 101 Product Line 320 Series Vertical Sump.
APPLICATIONS OF TECHNOLOGY
Competency: Draw roof plans
FIXTURES.
Competency: Draw wall sections and details
Competency: Draw roof plans
Zurn Carriers - Overview 101
Zurn Urinals - Overview 101
Zurn Lavatories & Sinks - Overview 101
Zurn Fire Valves - Overview 101
Warm-up 9/19/16 What template are we using?
Zurn Hydrants - Overview 101
THE SKINNER COMPANY Product Review
Zurn Lavatories & Sinks - Overview
171-SH SH Box with Pre-Installed 101⁄2" Pigtail Popular 4" square boxes and switch boxes Pre-installed 101⁄2" insulated grounding.
Competency: Draw wall sections and details
Wood Frame Construction
Common Components of a Traditional Wood Framed Building
Competency: Draw roof plans
Wall and Ceiling Construction
Competency: Draw roof plans
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Presentation transcript:

SALES PRESENTATION : WATER CLOSET SUPPORTS 0211Y-M54-XX 0240Y-M54-XX

THE AGENDA THE PROBLEM THE SOLUTION BENEFITS ITEMS TO REMEMBER SETTINGS FEATURES BATTERY PREFABRICATION OPTIONAL ACCESSORIES HOW TO SELECT A WATER CLOSET SPECIFICATIONS APPLICATIONS CERTIFICATIONS & LISTINGS SUMMARY ANY QUESTIONS? 0211Y-M54

THE PROBLEM Public restrooms can be difficult to maintain and keep clean. ARCHITECTS want to control building costs and ensure structurally sound designs by selecting proper water closet supports. CONTRACTORS want products that save time and reduce installation costs during construction. CUSTOMERS insist on the best value for their investment and expect a high level of sanitation.

THE SOLUTION OFF-THE-FLOOR WATER CLOSET SUPPORTS LABOR SAVING water closet supports for various installation applications. Application VERSATILITY for metal stud, block, or narrow wall chase configurations. REDUCED MAINTENANCE and cleaning costs. 0211Y-M54

BENEFITS MORE ECONOMICAL than conventional floor mounted units. LESS SLEEVING: only one sleeve required for vertical inlet fitting. NO SCAFFOLDING OR LADDERS. FASTER INSTALLATION: the installer works on the floor rather than in the ceiling below. No more DROPPED CEILINGS, saving on construction costs. SANITATION: Mops pass more easily beneath “off the floor” mounts, reducing sanitation hazards and cleaning costs. (see right) VS.

ITEMS TO REMEMBER NOTE: Adjustable Horizontal Supports maintain the proper pitch (slope) in a battery installation. PIPE CONNECTIONS (TWO TYPES) 1.NO-HUB (Mechanical Joint). 2.CAULK (Hub & Spigot). SIPHON JET SUPPORTS Requires FOUR STUDS to mount. BLOWOUT SUPPORTS Requires THREE STUDS to mount. 0211Y-M54

SETTINGS Closet Horn Depth and Flange Thickness: Fixture support closet connection should extend 5/16” beyond face of wall. (DIMENSION “R”) Studs should extend 2 ¼”. (DIMENSION “X”) Use DETAIL A (to the left) for exact dimensions. NOTE: Closet gasket must be compressed for gas and water tight seal. DETAIL A S + 1/16” – D = R R = Distance coupling should extend beyond finished wall. S = Depth closet horn. 1/16” = Distance closet is to set away from finished wall. *D = ½” for felt gasket and 3/8” for neoprene gasket.

CONT’D SETTINGS

FEATURES AN OVERVIEW ADJUSTABLE horizontal/vertical fitting supports. WIDE RANGE OF APPLICATIONS, from metal stud to block walls. VERSATILE: Designed to fit in wall chase from inches. Available with NO-HUB & CAULK CONNECTIONS. Figure No. 0210Y: Adjustable fixture supports for siphon jet water closets shallow rough-in type Figure No. 0210DY Top View

…MORE FEATURES Typical SMITH Fixture Support with Waste Fitting QUARTERBACK ® Figure No. 0211Y-M58-M54

BATTERY PREFABRICATION 0200 Water Closet Support Saves TIME & LABOR -M54 Side Mounted Leg-M54-M58 Faceplate w/ “O” Ring Seal SYMMETRIC construction. Increased load-bearing. Half inch incremental markings for quick rough-in. ADJUSTABLE coupling, nipple, and test cap. New FACEPLATE adjustment option. ENHANCED sealing with faceplate “O” Ring.

OPTIONAL ACCESSORIES SUFFIX –M12 EXPOSED FLUSH VALVE SUPPORT Redesigned with greater strength, a stronger angle clip, and a more rigid stud. SUFFIX –M40 WATER CLOSET SUPPORT FOR WIDE PIPE CHASE Provides a set of feet behind wall for extra rigidity. An alignment yoke ensures proper nipple alignment. SUFFIX –M13 TILING FRAME Provides a rim for flat surface tiling. Available for siphon jet closets only. SUFFIX –M50 ELEVATED SUPPORT BASE For back-to-back installations which require a single elevated water closet. Ideal and adaptable for hospitals & nursing homes.

OPTIONAL ACCESSORIES CONT’D SUFFIX –M54 FACEPLATE WITH SIDE-MOUNTED BASE SUPPORT ASSEMBLY CONCEALED FLUSH VALVES Supply pipe enters the rear of the water closet, above the top of the faceplate without interference. SUFFIX –M17 WATER CLOSET SETTING GUAGE Designed to eliminate costly trial and error test mounting. SIPHON JETBLOWOUT FRONT VIEW TOP VIEW

HOW TO SELECT A WATER CLOSET 1.OFF-THE-FLOOR or FLOOR MOUNTED fixture? 2.SIPHON JET or BLOWOUT WATER CLOSET? 3.Select VERTICAL FITTING with appropriate SIDE INLETS. 4.LEFT or RIGHT HAND HORIZONTAL FITTINGS? 5.Review BATTERY INSTALLATION.

SPECIFICATIONS WATER CLOSET SUPPORTS WATER CLOSET FITTINGS  SIPHON JET: Smith No series. Adjustable shallow rough-in support for one-pour construction.  BLOWOUT: Smith No series. Adjustable rough- in support.  WALL HUNG RESIDENTIAL FLOOR-MOUNT: Smith No. 0550F siphon jet supports. Complete w/ waste fitting and cast iron face plate. Securely bolted to floor construction.  WALL HUNG RESIDENTIAL STUD-MOUNT: Smith No stud-mount siphon jet. Steel reinforcing strap transmits top fixture to interior wall, bottom fixture to sole plate.  FLOOR MOUNTED BACK OUTLET FITTINGS: Smith No with Type 2 outlet connection or Smith 0672/0674 stack fittings. 0211Y-M540310Y 0550 STUD MOUNT

CONT’D 0440Y 0675 LIMITED CHASE SPACE?  Use Smith “compact” No series. BACK-TO-BACK BOWLS?  Use Smith No. 0200D series. FURRED WALL SPACE?  Use Smith “compact” No or No stack fittings.

APPLICATIONS

CERTIFICATIONS & LISTINGS IAPMO Listed – File #1618 Conforms to ASME – A M

SUMMARY OFF-THE-FLOOR WATER CLOSET SUPPORTS: SAVE TIME AND REDUCE INSTALLATION COSTS. SAVE TIME AND REDUCE INSTALLATION COSTS. PROVIDE INSTALLATION VERSATILITY FOR BATTERY PREFABRICATION. PROVIDE INSTALLATION VERSATILITY FOR BATTERY PREFABRICATION. USE ADJUSTABLE HORIZONTAL AND VERTICAL FITTINGS TO FIT INSTALLATION REQUIREMENTS. USE ADJUSTABLE HORIZONTAL AND VERTICAL FITTINGS TO FIT INSTALLATION REQUIREMENTS. PROVIDE A WIDE RANGE OF APPLICATIONS. PROVIDE A WIDE RANGE OF APPLICATIONS. REDUCE MAINTENANCE & CLEANING COSTS. REDUCE MAINTENANCE & CLEANING COSTS. IMPROVE SANITARY CONDITIONS. IMPROVE SANITARY CONDITIONS.

…QUESTIONS?

THANKYOU! 0240Y-M54-XX 0185