VALUE AT RISK.

Slides:



Advertisements
Similar presentations
Copula Representation of Joint Risk Driver Distribution
Advertisements

Value-at-Risk: A Risk Estimating Tool for Management
An Example of Quant’s Task in Croatian Banking Industry
Market Risk Cheryl J. Rathbun Citigroup Chief Operating Officer
Risk and Return Learning Module.
Chapter 25 Risk Assessment. Introduction Risk assessment is the evaluation of distributions of outcomes, with a focus on the worse that might happen.
Options, Futures, and Other Derivatives 6 th Edition, Copyright © John C. Hull Chapter 18 Value at Risk.
COMM 472: Quantitative Analysis of Financial Decisions
FIN 685: Risk Management Topic 6: VaR Larry Schrenk, Instructor.
VAR METHODS. VAR  Portfolio theory: risk should be measure at the level of the portfolio  not single asset  Financial risk management before 1990 was.
TK 6413 / TK 5413 : ISLAMIC RISK MANAGEMENT TOPIC 6: VALUE AT RISK (VaR) 1.
Financial Risk Management Framework - Cash Flow at Risk
Chapter 21 Value at Risk Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull 2012.
VAR.
Chapter 21 Value at Risk Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull 2012.
Risk Management Jan Röman OM Technology Securities Systems AB.
 Known dividend to be paid before option expiration ◦ Dividend has already been announced or stock pays regular dividends ◦ Option should be priced on.
Sensitivity and Scenario Analysis
Value at Risk Concepts, data, industry estimates –Adam Hoppes –Moses Chao Portfolio applications –Cathy Li –Muthu Ramanujam Comparison to volatility and.
RISK VALUATION. Risk can be valued using : Derivatives Valuation –Using valuation method –Value the gain Risk Management Valuation –Using statistical.
Value-at-Risk on a portfolio of Options, Futures and Equities Radhesh Agarwal (Ral13001) Shashank Agarwal (Sal13003) Sumit Jalan (Sjn13024)
1 Risk in the MOLINO André de Palma UCP & Ecole Nationale des Ponts et Chaussée Lætitia Andrieu CERMICS-ENPC Nathalie Picard University of Cergy-Pontoise.
Lecture Presentation Software to accompany Investment Analysis and Portfolio Management Seventh Edition by Frank K. Reilly & Keith C. Brown Chapter.
AN INTRODUCTION TO PORTFOLIO MANAGEMENT
Value at Risk (VAR) VAR is the maximum loss over a target
AN INTRODUCTION TO PORTFOLIO MANAGEMENT
Options, Futures, and Other Derivatives 6 th Edition, Copyright © John C. Hull Chapter 18 Value at Risk.
Value at Risk.
Risk Management and Financial Institutions 2e, Chapter 13, Copyright © John C. Hull 2009 Chapter 13 Market Risk VaR: Model- Building Approach 1.
Measuring Returns Converting Dollar Returns to Percentage Returns
Portfolio Management Lecture: 26 Course Code: MBF702.
Hedging and Value-at-Risk (VaR) Single asset VaR Delta-VaR for portfolios Delta-Gamma VaR simulated VaR Finance 70520, Spring 2002 Risk Management & Financial.
Alternative Measures of Risk. The Optimal Risk Measure Desirable Properties for Risk Measure A risk measure maps the whole distribution of one dollar.
Calculating Value at Risk using Monte Carlo Simulation (Futures, options &Equity) Group members Najat Mohammed James Okemwa Mohamed Osman.
Portfolio Management-Learning Objective
Market Risk Chapter 10 © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
Irwin/McGraw-Hill 1 Market Risk Chapter 10 Financial Institutions Management, 3/e By Anthony Saunders.
©2003 McGraw-Hill Companies Inc. All rights reserved Slides by Kenneth StantonMcGraw Hill / Irwin Chapter Market Risk.
LECTURE 22 VAR 1. Methods of calculating VAR (Cont.) Correlation method is conceptually simple and easy to apply; it only requires the mean returns and.
Value at Risk Chapter 20 Value at Risk part 1 資管所 陳竑廷.
Chapter 10 Capital Markets and the Pricing of Risk.
© 2008 Morningstar, Inc. All rights reserved. 3/1/2008 LCN Portfolio Performance.
Fundamentals of Futures and Options Markets, 5 th Edition, Copyright © John C. Hull Value at Risk Chapter 18.
Investment Analysis and Portfolio Management First Canadian Edition By Reilly, Brown, Hedges, Chang 6.
Value at Risk Chapter 16. The Question Being Asked in VaR “What loss level is such that we are X % confident it will not be exceeded in N business days?”
Market Risk A financial firm’s market risk is the potential volatility in its income due to changes in market conditions such as interest rates, liquidity,
Measurement of Market Risk. Market Risk Directional risk Relative value risk Price risk Liquidity risk Type of measurements –scenario analysis –statistical.
 Measures the potential loss in value of a risky asset or portfolio over a defined period for a given confidence interval  For example: ◦ If the VaR.
Value at Risk Chapter 20 Options, Futures, and Other Derivatives, 7th International Edition, Copyright © John C. Hull 2008.
Options, Futures, and Other Derivatives, 5th edition © 2002 by John C. Hull 16.1 Value at Risk Chapter 16.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 14.1 Value at Risk Chapter 14.
Chapter 7 An Introduction to Portfolio Management.
Capital Asset Pricing Model (CAPM) Dr. BALAMURUGAN MUTHURAMAN Chapter
March-14 Central Bank of Egypt 1 Strategic Asset Allocation.
Value at Risk (VaR).
Types of risk Market risk
The Three Common Approaches for Calculating Value at Risk
5. Volatility, sensitivity and VaR
Value at Risk and Expected Shortfall
Market-Risk Measurement
Chapter 12 Market Risk.
Risk Mgt and the use of derivatives
Portfolio Risk Management : A Primer
Capital Asset Pricing Model (CAPM)
Types of risk Market risk
Market Risk VaR: Model-Building Approach
Lecture Notes: Value at Risk (VAR)
Andrei Iulian Andreescu
Lecture Notes: Value at Risk (VAR)
Understanding Corporate-Value-At-Risk (C-VaR)
Presentation transcript:

VALUE AT RISK

VALUE AT RISK VALUE AT RISK Definition : The expected maximum loss ( or worst loss ) over a target horizon within a given confidence interval Evolved through the requirements of SEC to provide a minimum capital requirement in provision for risks taken by financial institutions

Models to estimate VaR Historical Market Data assumption is that historical market data is our best estimator for future changes and that asset returns in the future will have the same distribution as they had in the past Variance – Covariance (VCV) assuming that risk factor returns are always (jointly) normally distributed and that the change in portfolio value is linearly dependent on all risk factor returns Monte Carlo Simulation future asset returns are more or less randomly simulated

Historical Market Data involves running the current portfolio across a set of historical price changes to yield a distribution of changes in portfolio value, and computing a percentile (the VaR). Benefits Simple to implement does not assume a normal distribution of asset returns Drawbacks requires a large market database computationally intensive calculation.

VALUE AT RISK (VAR) Market Value x Risk Variability Confidence Level = Worst Loss

DEFINITION : Market Value : Risk variability : Current market value of the respective transaction to be managed Mark to market at the end of time horizon Risk variability : Usually the standard deviation of the risk to be managed The higher the variability the higher is VAR

DEFINITION : Time Horizon : Confidence Level : Time period to be considered correspond to time required for corrective actions as losses starts to develop Annualized The longer the time horizon the higher is VAR Confidence Level : Confidence level of loss occurring The higher the confidence level the higher is VAR

Example : Current market value of transaction USD 100,000 paid by 3 months usance L/C Standard deviation of Rp/USD is 10% Time horizon is 3 months Confidence level is 95% VAR = 100,000 X 0.10 X X 0.95 = USD 4,750.00  Maximum expected loss

WEAKNESSES OF HISTORICAL SIMULATION Past is not prologue, history does not always repeat it selves Trends in the data, since all data are treated equal, despite the fact that some periods might experience higher volatility For new assets or market risks no historical data available

MODIFICATIONS OF HISTORICAL SIMULATION Weighting the recent past more, assuming that the recent past is a better predictor of the immediate future than the distant past ( can be using indexes to adjust each return based on its timeline) Combining historical simulation with time series models, by fitting a time series models through the historical data Volatility updating, by comparing past volatility with recent volatility and then adjusting the past return accordingly e.g. past volatility = 0.5, recent volatility 0.75, past return 10%, recent predicted return is 0.75/0.5* 10%=15%

Variance – Covariance (VCV) Basic assumption is that the risk factors are normally distributed Hence are the returns also normally distributed

Variance – Covariance (VCV) VAR formula for VCV : σ = standard deviation of the risk Sigma for 95% confidence level is 1.645 Sigma for 99% confidence level is 2.33

Exchange rate (USD/Rp) EXAMPLE : Exchange rate (USD/Rp) Loss / Gain (p) Probability (r) d2 = r * p2 9.600 -400 0.025 4.000 9.700 -300 2.250 9.800 -200 0.050 2.000 9.900 -100 0.200 10.000 0.400 10.100 100 10.200 200 10.300 300 10.400 400 Average = S = d2 = 20.500 d = 143.18 With 95% confidence interval the VAR = 1.645 * Rp. 143.18= Rp. 235.53  The maximum potential loss for exchange rate risk is Rp. 235.53

ASSESMENT OF V-CV METHOD Strength : simple to compute after making assumptions about the distribution of returns and inputted the means, variances and covariances or returns Weaknesses : Wrong distributional assumptions, if it turns out that the returns a re not normally distributed and the outliers are higher, computed VaR can be lower that actual VaR Input error, if data used to calculate are for example based on historical data, which is not reflecting the current situation Nonstationary variables, happens if the underlying assumed correlation does not hold anymore, e.g. interest rate is adjusted by FED

Monte Carlo Simulation Decide on N, the number of iterations to perform. For each iteration: Generate a random scenario of market moves using some market model. Revalue the portfolio under the simulated market scenario. Compute the portfolio profit or loss (PnL) under the simulated scenario. (i.e., subtract the current market value of the portfolio from the market value of the portfolio computed in the previous step). Sort the resulting PnLs to give us the simulated PnL distribution for the portfolio. VaR at a particular confidence level is calculated using the percentile function. For example, if we computed 5000 simulations, our estimate of the 95% percentile would correspond to the 250th largest loss; i.e., (1 - 0.95) * 5000.

STRENGTH OF MONTE CARLO SIMULATION Does not need to rely on historical data, those historical data can still be used as benchmark and then adjust accordingly Does not need to assume normal distribution for the returns Can be used for any type of portfolio including options or option like securities

WEAKNESSES OF MONTE CARLO SIMULATION Needs to estimate the probability distribution for all the market risk variables that we want to consider Number of simulations that need to be run on the model will be substantially large

MODIFICATION ON MONTE CARLO SIMULATION Scenario simulation, only likely combination are run through the model Monte Carlo simulation with Variance-Covariance method modification, assuming normal distribution for the returns

Indications on method to use For Value at Risk for portfolios, that do not include options, over very short time periods (a day or a week) and normality can be assumed, the variance-covariance approach does a reasonably good job. If the risk source is stable and there is substantial historical data (commodity prices, for instance), historical simulations provide good estimates. In the most general case of computing VaR for nonlinear portfolios (which include options) over longer time periods, where the historical data is volatile and non-stationary and the normality assumption is questionable, Monte Carlo simulations do best.

LIMITATIONS OF VaR : Return distributions cannot always be correctly predicted History may not be a good predictor Nonstationary correlations Only looking at the downside risk (negative side of risk) Best for calculating short term risk Difficult to use for comparing different investments

VaR can lead to suboptimal decision Overexposure to risk, managers will tend to be more bold in making risky investments while actually the rest of 5-10% probability of incurring risk might be huge Agency problem, because VaR usually uses past data, managers who knows about irregularity in the volatility can misuse them for his own advantage.

VAR is best used for financial institutions, since they are dealing with short term assets which are related to the common market risks VAR for nonfinancial institutions should be used as a secondary measure, unless it is for short term assets.