START-UP AND OPERATION OF MECHANICALLY SEALED EQUIPMENT 1:13.

Slides:



Advertisements
Similar presentations
AUTOMOTIVE COOLING SYSTEMS
Advertisements

Coach Air Conditioning
Chapter 4 Air-Conditioning Components
Circulating Water System
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Fluid Mechanics.
Lubrication features of a large diesel engine
ADX 150 – Engine Repair ADX 170 – Climate Controls
General System Maintenance BUS 4 COMPONENT FLOW.PPT
Drilling Engineering – PE311 Circulating System
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
CAFS On-Line Orientation
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
Suction Pumps.
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
Glycol Pumps Operating Pressure: 100 to 1500 psi Circulation Rate: 3 to 450 gph.
Improving Mechanical Seal Reliability
PUMPS AND GAS-MOVING EQUIPMENT
Proper Pump Installation Practices
Rotating Equipment PUMPS.
Basics of Pump Vigyan Ashram, Pabal.
Dennis Sabre Fire Appliances
Introduction to Hydraulics ClassAct SRS enabled. In this presentation you will: identify the fundamental parts of a hydraulic system and safety issues.
Pump Installation Vigyan Ashram, Pabal.
Pump types and theory.
What is going on inside a packed stuffing box?
Experts in Chem-Feed and Water Treatment General Hydraulics Fluid Mechanics.
COMPRESSOR BASICS.
Oil Pressure Problems What to look for.
STEAM HEATING.
Hydronic Mechanical Controls
Air Compressors.
Hydraulics For The Long Term
Lease Automatic Custody Transfer
Steam Traps Function and Types.
Glycol Pumps Operating Pressure: 100 to 2000 psi Circulation Rate: 3 to 450 gph.
1 Fuel Pumps. 2 Pumps 1.All oil burners for residential heating have pumps A. They are connected to a motor through a coupling 2.Description A. An oil.
Components of Centrifugal pumps
Plan 2 – Dead-end Seal Chamber Optional Jacket
Left side compressor behind Left control box Right side compressor behind Right control box.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Pumps Unit 10. Learning Objectives TLW be able to describe the following about pumps used in the process industry: –Types –Uses –Operation –Monitoring.
Parul Institute of Engineering & Technology Subject Code : Name Of Subject : Fluid Power Engineering Name of Unit : Pumps Topic : Reciprocating.
Introduction to Energy Management
Submitted by Pradeep pataskar Roll no.11031M02034.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Prepared By Rohit G. Sorte M.Tech
Small Engines Ag  Identify basic terms and definitions associated with carburetion  List and identify individual engine parts related to carburetion.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
Air Compressors Capacity Horsepower Pressure Duty Cycle.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Industrial Resources, Inc.
CENTIFUGAL PUMP OPERATION
Chapter 37: Fluid Containment
Chapter 18 The Clutch System.
Components Pumps.
Fluid Statics/Dynamics
COMPRESSOR BASICS.
EXECUTIVES & NON-EXECUTIVES
Unit 37: Fluid containment Dr
ITEMS TO CHECK ON Running Pumps
SB Packing Automatic Downpuller Power Unit
Trouble Shooting Hydraulic System Failure
COMPRESSOR BASICS.
Hydraulic Pump Power Power = rate of conversion of energy.
Presentation transcript:

START-UP AND OPERATION OF MECHANICALLY SEALED EQUIPMENT 1:13

START UP & OPERATION SEALS ARE ESPECIALLY VULNERABLE DURING THIS TIME, SO IT IS IMPORTANT TO GIVE ATTENTION TO THE FOLLOWING INFORMATION...

SINGLE INSIDE SEAL Start-Up Procedures Start-Up Procedures Gradually Heat up or Chill Down if ApplicableGradually Heat up or Chill Down if Applicable Heating / Cooling onHeating / Cooling on Steam / Gas Purge onSteam / Gas Purge on Verify that Environmental Control Piping is Properly ConnectedVerify that Environmental Control Piping is Properly Connected

Start-Up Procedures Suction Valve Open Suction Valve Open Discharge Valve Closed to One-Quarter open Discharge Valve Closed to One-Quarter open Start Pump and Gradually Open Discharge Valve to Proper Flow Start Pump and Gradually Open Discharge Valve to Proper Flow SINGLE INSIDE SEAL

Operating Procedures After Start-Up, Check for: Leakage, Squealing, Vibration or CavitationAfter Start-Up, Check for: Leakage, Squealing, Vibration or Cavitation Never Adjust Flow with the Suction Valve. It must ALWAYS BE WIDE OPENNever Adjust Flow with the Suction Valve. It must ALWAYS BE WIDE OPEN If the Pump is Running Dry, the Seal is Not Being Lubricated. Severe damage to the seal and/or pump may occur. Turn the Pump Off ImmediatelyIf the Pump is Running Dry, the Seal is Not Being Lubricated. Severe damage to the seal and/or pump may occur. Turn the Pump Off Immediately SINGLE INSIDE SEAL

DUAL PRESSURIZED SEAL Start-Up Procedures Gradually Heat up or Chill Down if ApplicableGradually Heat up or Chill Down if Applicable Heating / Cooling onHeating / Cooling on Steam / Gas Purge onSteam / Gas Purge on Verify that Environmental Control Piping is Properly ConnectedVerify that Environmental Control Piping is Properly Connected

DUAL PRESSURIZED SEAL Start-Up Procedures Ensure Adequate Liquid Level in Buffer Supply Tank orEnsure Adequate Liquid Level in Buffer Supply Tank or Ensure that Barrier System is OperationalEnsure that Barrier System is Operational Double Check Barrier Piping to the Seal Inlet & Outlet to Ensure that They are Correct for Pump RotationDouble Check Barrier Piping to the Seal Inlet & Outlet to Ensure that They are Correct for Pump Rotation

DUAL PRESSURIZED SEAL Start-Up Procedures Apply and Check for Adequate Barrier System flow through the Seal Apply and Check for Adequate Barrier System flow through the Seal Ensure that Barrier Pressure is 20 to 25 psi. Greater than Anticipated Stuffing Box Pressure (Suction + %(Differential)) Ensure that Barrier Pressure is 20 to 25 psi. Greater than Anticipated Stuffing Box Pressure (Suction + %(Differential))

DUAL PRESSURIZED SEAL Start-Up Procedures Suction Valve Open Suction Valve Open Discharge Valve Closed to One-Quarter Open Discharge Valve Closed to One-Quarter Open Start Pump Start Pump Gradually Open Discharge Valve to Full Open Gradually Open Discharge Valve to Full Open

Operating Procedures After Start-Up, Check for: Leakage, Squealing, Vibration or CavitationAfter Start-Up, Check for: Leakage, Squealing, Vibration or Cavitation Never Adjust Flow with the Suction Valve. It must ALWAYS BE WIDE OPENNever Adjust Flow with the Suction Valve. It must ALWAYS BE WIDE OPEN If the Pump is Running Dry, damage may occur to the pump. Turn the Pump OffIf the Pump is Running Dry, damage may occur to the pump. Turn the Pump Off DUAL PRESSURIZED SEAL

Operating Procedures Never Remove Barrier Supply from the Seal While the Pump has Process Liquid AppliedNever Remove Barrier Supply from the Seal While the Pump has Process Liquid Applied If Seal Begins to Leak Barrier Fluid to Atmosphere, Plan Maintenance as Soon as Possible. Delaying Removal may Damage the Seal Beyond Economical RepairabilityIf Seal Begins to Leak Barrier Fluid to Atmosphere, Plan Maintenance as Soon as Possible. Delaying Removal may Damage the Seal Beyond Economical Repairability DUAL PRESSURIZED SEAL

Reminders The Pumped Liquid Lubricates Single and Non- Pressurized Inner Seals only! Dry running destroys them ! Suction Valve Always Wide Open Before Pump Start-Up Heat or Cool Gradually Never Throttle a Pump with the Suction Valve Start a Centrifugal Pump with the Discharge Valve 25 Percent Open Where Possible Always Start a Positive Displacement Pump with the Suction and Discharge Valves Wide Open

Reminders Report Cavitation, Vibration, Leakage, Squealing Do Not Run a Pump at Shut-Off Barrier Liquids for Pressurized Seals Must Be Pressurized Before the Pump Valves are Opened Barrier Fluid Circulation Systems Must Be Operational and Applied Before the Pump Valves are Opened Inlet & Outlet Must be Piped in Accordance with Specified Rotation of The Pump

Reminders Use Tubing Where Possible Do Not Tie Inlet & Outlet Lines Together Do Not Remove Pressure Source to Add Barrier Fluid to a Sealing System that is in Operation Seal & Piping System Must Not Trap Air Anywhere All Supply Lines Must Slope up to Reservoir / Tank Flush Out All System Components after a Seal Failure

END START-UP AND OPERATION OF MECHANICALLY SEALED EQUIPMENT