Cleanup of Sewage Lakes: Case Studies in Jeddah and Riyadh.

Slides:



Advertisements
Similar presentations
January April July October September February March May JuneAugust November December © 2010 Donor By Design Group LLC Goal $_________ Grants $______ Q:
Advertisements

Small-scale Sanitation: Dutch experiences at home and abroad Carel de Villeneuve Ministry of Transport, Public Works and Water Management The Netherlands.
Wastewater Lagoon Cleanout How do they do that? Why is it important?
Fayette County Wastewater Management Plan October 6, 2005.
Presented by Melanie Williams. Plan Schedule Water Quality Status Trends Chain of Lakes Basinwide Issues Recommendations & goals Public Review Comments.
Taskforce Meeting March 4, Focus on food waste Also other organics such as leaves and yard waste and agricultural wastes Food waste about
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Water supply and sanitation affecting health. Presentation overview Objectives Last decade WSS coverage Vietnam National Health Survey Diarrheal illness.
Commitment to Responsible Fleet Operation 1997 Joins Cities for Climate Protection 1999 One of the founding members of Ann Arbor Clean Cities Coalition.
Project for support of the participation of West Balkan countries in the work of the EEA Wim Mol European Topic Centre on Air pollution and Climate change.
Exchange of practices and experience in developing national information systems on population’s connection to public water supply and to wastewater treatment.
Wrocław is the chief city of Lower Silesia situated in the southwest part of Poland. It is one of the oldest and most beautiful towns in Poland.
Water Pollution.
Fresh Water Historically limiting factor in arid regions World population more than doubled 2.3 billion  5.3 billion Per capita water use doubled.
Environmental Science 2012
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
1 Milwaukee Metropolitan Sewerage District Legislative Audit Bureau November 2003.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
THE NORTH CAROLINA AGRICULTURAL WATER RESOURCES ASSISTANCE PROGRAM NC Water Resources Congress October 30, 2014.
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
Water Resources In the United States: Perspectives and Challenges by Dr. Jerome Delli Priscoli Institute for Water Resources US Army Corps of Engineers.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Do Now: Where does our water go when we flush the toilet? Wash our hands in the sink? Water our lawns, wash our cars?
Water Pollution G. Tyler Miller’s Living in the Environment 14 th Edition Chapter 22 G. Tyler Miller’s Living in the Environment 14 th Edition Chapter.
Do Now: Where does our water go when we flush the toilet? Wash our hands in the sink? Water our lawns, wash our cars?
A C E C A MERICAN C OUNCIL OF E NGINEERING C OMPANIES of Virginia Gary Weishaar, P.E. R. Stuart Royer and Associates, Inc. Consulting Engineers Richmond,
Water Treatment Chapter 11. Sewage Treatment Rationale More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement.
11.2 Water Use and Management Pg 296 – 303 “We all live downstream”
Water Pollution. Types and Sources of Water Pollution  #1 problem - Eroded soils  Organic wastes, disease-causing agents  Chemicals, nutrients  Radioactive.
Aerobic vs Anaerobic Bacteria AerobicAnaerobic Must have oxygen to survive. Cannot live in the presence of oxygen.
Water=Liquid Gold. Problems Dry Land –Much of the M.E. and N. Africa are covered with desert. Sahara, Rub Al Khali, and part of Iran and Afghanistan are.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
State Water Planning Presented to State Water Plan Regional Advisory Committees December 8-19, 2003 William A. Gast Chief, Division of Water Use.
Did You Know….. Very little bit of our water in the world is drinkable. Only 3% of the Earth’s water is fresh water. 97% of the water on Earth is salt.
Water Chapter : Water Resources Water is essential to life on Earth. Humans can live for more than month without food, but we can live for only.
SWITCH Training Kit: Pilot Training, Muñoz, July 2010 Wastewater Management in the City of the Future Wastewater and sustainable urban water management.
Sediment Management a key to Sustainable Development Presented By: J. Douglas Reid-Green, BASF Corp.
1 Ocean Disposal of Wastewater (An Introduction) by Prof. B. S. PANI I. I. T. Bombay, Mumbai.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
Demonstration Project in Waste Water Treatment Delhi Jal Board, India Is Water Business Export Business? DHI, 14 October 2011 Peter Sand.
Ulrich Zeidler and Shelley Mc Millan Regional Conference on Integrated Nutrient Reduction Management in the Danube - Black Sea Basin October 23-25, 2007,
1 Improvement of the Polish data collection system on water and waste water statistics Project co-financed by the European Commission under the Grant Agreement.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project GEF Danube – Black Sea Strategic Partnership 3rd Biennial GEF International.
By: Tyler Stevens Mikayla Stern-Ellis Zach Jones & Althea.
Environmental Science  Mid-1800s, 25,000 people living along the River Thames in London died of cholera  River was declared “dead” by 1950  Walk.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Septage Management in Indonesia Serving the urban poor and starting to close the loop? Reini Siregar Budi Damawan, Isabel Blackett Indonesian team Cebu,
PRESENTED TO: ENGINEERING AND PLANNING SUBCOMMITTEE OF THE METROPOLITAN WATER POLLUTION ABATEMENT ADVISORY COMMITTEE DECEMBER 5, 2013 Regional Wastewater.
Faecal Sludge Management (FSM)
Mulberry River Watershed
Unit 5 Lesson 3 Human Impact on Water
Water Use and Managment
Water Pollution.
First Assessment of Transboundary Rivers, Lakes and Groundwaters
Presentation to the Livingston City Council on the Phase II MS4 Permit
Civil & Chemical Engineering Department Graduation Project 2
Prepared By : Osama amr Qutayba mElhim
Living in the Environment
Population: 550,000 Current Energy Source: Nuclear Power
The SWITCH Approach to Integrated Urban Water Management
Human Impact on the Hydrosphere
2019 Water and Waste Water Rates
Alternative Energy Earth and Space 1
Water Treatment & Pollution: What will I be learning about today
Sanitation Study and Wastewater Network System AL Tayba Village
Wastewater Treatment and Nutrient Reduction
Water Quality Vocabulary October 11, 2011
Presentation transcript:

Cleanup of Sewage Lakes: Case Studies in Jeddah and Riyadh

Background Jeddah Sewage Lake – Drivers and project overview – Recommended plan – Clean-up Completion Al-Nazeem Sewage Lake (Riyadh) – Project overview – Sediment management – Clean-up status Project’s Benefits

Septage issues in nearly all Cities – ~50 % of population served by central collection systems – Country-wide issue that is independent of city size

No inventory available for sewage lakes Jeddah – Only 6 percent of municipal planning area is currently sewered – ~140,000 m3/day hauled by tanker trucks Riyadh – ~50 percent of population on central collection system Wastewater pumped from cesspits and trucked to sewage lake – Air pollution from trucks – Significant energy investment in trucking

Background Jeddah Sewage Lake – Drivers and project overview – Recommended plan – Clean-up Completion Al-Nazeem Sewage Lake (Riyadh) – Project overview – Sediment management – Clean-up status Project’s Benefits

Received 1500 to 2000 tanker trucks/day Up to 50,000 m3/day of sewage Lake grew to 2.8 km2 in surface area

May 2010 – Custodian of the Two Holy Mosques King Abdullah bin Abdulaziz issued a royal decree ordering that the hazardous Sewage Lake be emptied within 1 year – NWC took responsibility for the project June 2010 – NWC hires Lake Contractor July 2010 – Water evacuation efforts initiated – Planning consultant hired October 2010 – Lake Evacuation completed November 2010 to July 2011 – Sediment clean-up July 25, 2010 October 2, 2010

Flood Management – Removal of the Sewage Lake Dam Water Management – Evacuation of the Lake – Water Use and Agricultural Activities Sediment Management – Characterization – Treatment/Management alternatives Regulatory Requirements Mitigation Needs Recommended Plan Plan Supervision 9

Additional sediment depth sampling points – 125 measurements Sediment depths – Main Lake – <0.5 m – West Lake - <1.2 m Sediment volume – Main Lake 300,670 m 3 – West Lake 84,724 m 3 10 Total Volume = 385,000 m3

11 ~ 3-5 cm thick Characteristics of silty clay

Main Lake Data – Data indicated meeting KSA criteria for agricultural use of sludge and US EPA “Exceptional Criteria” – A few sites with elevated petroleum hydrocarbons Secondary Lake – Showed sediments also met KSA and EPA Criteria – Did show general contamination by petroleum hydrocarbons

Open Water and Wetlands Ecosystem Upland Ecosystem Planted Forest

Continued drying of sediments – Use mineral material as a drying agent – Sample new areas as can be accessed Mix thinner sediments in place – When sufficiently dry Excavate thicker sediments – Spread in upper areas of the Main lake with thin deposits Mix sediments that have been spread Conduct “Site Release Sampling Plan” – Verification of site safety Excavate sediment material littered with trash from former conveyance channel and dispose at a land fill

16 Organic Sediment <50% Organic Matter ~0.75 g/cc Mineral Soil <1% Organic Matter ~1.5 g/cc Subsoil Mixed Topsoil <25% Organic Matter ~1.0 g/cc Subsoil Stratified Sediment Before Mixing Topsoil Condition After Mixing 20 cm 10 cm 30 cm Tillage

17 Stratified Sediment Before Mixing Topsoil Condition After Mixing Tillage

October 2010 – Lake Evacuation completed November - December – Sediment drying and mixing activities – Additional sediment characterization December-February 2011 – Completion of report documentation – Additional rainfall events partially refilling the lake to ~2m depth March – August 2011 – Pumping to evaporation ponds – Continued sediment drying and mixing activities – Completed site release sampling 29 March 2011

Lake evacuation – Delayed because of availability of pumps – Started in March 2011 – Completed in May 2011 Sampling grid – Final grid included 205 cells – Thick vegetation along margins prevented sampling of infrequently flooded areas

Total Organic Carbon – low levels indicating sediments are stable Metals – maximum values <12% of criteria Microbiological – Fecal Coliform – Maximum value of 24 MPN/g versus standard of 1000 MPN/g – Parasite eggs – None detected Petroleum Hydrocarbons – Only 3 sites showed some values exceeding levels of 2000 mg/kg for Total Petroleum Hydrocarbons – Additional mixing and re-sampling significantly reduced levels Cleanup plan was executed and site release sampling demonstrated site was safe for turnover back to the municipality

Background Jeddah Sewage Lake – Drivers and project overview – Recommended plan – Clean-up Completion Al-Nazeem Sewage Lake (Riyadh) – Project overview – Sediment management – Clean-up status Project’s Benefits 23

Lake has been used for approximately 20 years Received – 1000 to 1500 trucks per day – ~20,000 to 30,000 m3/day Mixture of Domestic and Industrial Waste – Domestic waste eliminated in January 2011 – Industrial waste eliminated in Mid-May

Lake area is ~3.5 km2 When cleanup began in June/July 2011 – very little water remained Cleanup focus – Sludge characterization – Sludge drying – Sludge treatment Lake are divided into 4 zone with 39 separate lakes

Characterization focus – Metals – Microbiological indicators – Petroleum hydrocarbon fractions – Volatile and Semi-volatile compounds Results – Zones 3 & 4 – no results exceed criteria – Zones 1 & 2 Metals and hydrocarbon issues at several locations

Clean-up has involved excavation, mixing and combining with clean sand Lake contractor is conducting verification sampling Upon completion – site release sampling will be conducted by an independent laboratory

Background Jeddah Sewage Lake – Drivers and project overview – Recommended plan – Clean-up Completion Al-Nazeem Sewage Lake (Riyadh) – Project overview – Sediment management – Clean-up status Project’s Benefits 30

NWC Efforts have eliminated two long standing health hazards Detailed investigations have led to environmentally sensitive solutions Jeddah Lake project recognized with GLOBAL WATER INTELLIGENCE Reuse Project of the Year (reuse of sludge to enhance soils)

Cleanup of Sewage Lakes: Case Studies in Jeddah and Riyadh