Lessons from Survey System Testing at Microsoft: The Good, The Bad and The Ugly Presented by L. Allen Slade Microsoft People Research at the 17 th Annual.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Symantec 2010 Windows 7 Migration Global Results.
Un percorso realizzato da Mario Malizia
Global Surveying via the Web: Better, Faster, Cheaper... and More Chaotic Presented by L. Allen Slade and Nicholas Mills at the Society for Industrial.
XML - Beyond the Hype Everything you must know to succeed in implementing XML Lisa Shreve - Syscom Strategies Mike Rawlins - Rawlins EDI Consulting.
Who Wants to be a Millionaire? Adapted from TCEA 2002
1 Integrating Research to Create Retention Intelligence at Microsoft Presented by L. Allen Slade, Lisa Sandora, Laura Hamill, and Kate Suckow Microsoft.
Prof. Dr. Hans-Jürgen Scheruhn | Online Process Management Hochschule Harz Wernigerode University for Applied Sciences Prof. Dr. Hans-Jürgen.
Slide 1 FastFacts Feature Presentation October 16 th, 2008 We are using audio during this session, so please dial in to our conference line… Phone number:
American Express Interactive Marcus Eaton Carole Walls.
By Rick Clements Software Testing 101 By Rick Clements
Survey Internal Communication trends in the Italian banking sector Mario Spatafora Simone DellOrto Milan, September 2002.
The Healthy Minnesota Workplace Initiative Work Well SM Healthy Minnesota Workplace Toolkit Tools to assist Minnesota agencies and companies create healthy.
Changes in access to the government surveys Labour Force Survey/Annual Population Survey user meeting Welcome.
Strategic Approach to Implementation Marianne Groth Learning: Re-Imagined.
1. Bryan Dreiling Main Contact for Three Year Plans
APS Teacher Evaluation
Introduction Lesson 1 Microsoft Office 2010 and the Internet
Evaluating Expressions
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Computer Literacy BASICS
Traffic Analysis Toolbox & Highway Capacity Manual Transition
Presenter: Beresford Riley, Government of
EE, NCKU Tien-Hao Chang (Darby Chang)
PULSE SURVEY The Incentive Industry Trends 2011 June 2011.
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
© eComScience Pvt. Ltd OffshoreSoftwareDevelopment eComScience Consulting perspective.
Online Course Evaluations Report from Ad hoc Committee.
Employee & Manager Self Service Overview
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
1 an online tool for GSM networks Planning and Inventory and others… IMK Consulting Simple tools for complex needs IMK – your IT tailor.
Capacity Planning For Products and Services
Center for Activity Theory and Developmental Work Research Using Activity Theory to Help Teachers Redesign their Practice Yrjö Engeström University.
Welcome, Panel of Examiner and Process Development Members! Washington State Quality Award PEPD #1 Training 2008.
Microsoft Office Illustrated Fundamentals Unit C: Getting Started with Unit C: Getting Started with Microsoft Office 2010 Microsoft Office 2010.
Powered by: SmartPros ADP LUNCH & LEARN CPE PROGRAM “Implementing Client Retention & Partnering Strategies” Authored by David Gilman, President of Gilman.
Copyright © [2002]. Roger L. Costello. All Rights Reserved. 1 XML Schemas Reference Manual Roger L. Costello XML Technologies Course.
The Virtual Participant — 28th June 1999Page 1. The Virtual Participant Knowledge Management and Electronic Conferencing Project team: Simon Masterton,
Chapter 1 Introduction to Visual Basic Programming and Applications 1 Exploring Microsoft Visual Basic 6.0 Copyright © 1999 Prentice-Hall, Inc. By Carlotta.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
New Product Innovation National Correctional Industries Association Enterprise 2004 March 23, 2004.
Project Connect Online Affordable, Secure and Easy to Use Collaboration for Project Teams 01/21/2009.
Global Analysis and Distributed Systems Software Architecture Lecture # 5-6.
Before Between After.
Key Steps in Developing CG Scorecards Ralitza Germanova IFC Global Corporate Governance Forum Vienna, May 17-18, 2012.
Chapter 11: Systems Development and Procurement Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
A Power Tools Treasury: great tools that many folks haven't yet met (or don't know well enough) Presented by Mark Minasi 1 WSV350.
Developing and Supporting Online Learning in a Traditional UK Polytechnic University: A view from the middle Rachel Forsyth, Learning and Teaching Unit,
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
1. 2 Introduction Industry trends Engagement models Governance Innovation Case Study Summary & Wrap Up Agenda.
Presented to: By: Date: Federal Aviation Administration FAA Safety Team FAASafety.gov AMT Awards Program Sun ‘n Fun Bryan Neville, FAASTeam April 21, 2009.
1 Traveling? Don’t Forget OIE! A global OIE rollout case study.
Cingular Case Studies September 24, © 2007 BearingPoint, Inc.IM – Content, Portals and IntegrationCommunications and Utilities AT&T B2B Wireless.
Chapter Learning Objectives
Improving Process for Better Software. Who We Are An experiential learning program that provides technology solutions for our partners, and real- world.
Learn how at centerpartners.com. An Insight Throughout our 13 years in business we have always thought of ourselves as more than a “call center”. To us,
GlobalProjectManagement.org 1 PROJECT Lessons learned.
Performance Management System Implementation & Lessons Learned Amanda Oldfield AVP, HR Operations & Project Manager First Niagara Financial Group.
By Anthony W. Hill & Course Technology1 Common End User Problems.
PRODUCT DESIGN & PROCESS SELECTION. Product & Service Design The process of deciding on the unique characteristics of a company’s product & service offerings.
Nonprofit Seminar: Developing Leadership Steve Smith Graduate Lecturer MS Leadership & Nonprofit Management
© Copyright 2015, Esquare Info Solutions - Confidential Esquare Info Solutions Simplifying Open Source…
Security Outsourcing Melissa Karolewski. Overview Introduction Definitions Offshoring MSSP Outsourcing Advice Vendors MSSPs Benefits & Risks Security.
How We Got Here PC and Internet changed the rules –Viruses, information sharing, “outside” and “inside” indistinguishable –Vulnerability research for.
SharePoint Migration On Time and On Budget. Welcome to SharePoint Saturday Houston  Please turn off all electronic devices or set them to vibrate. 
SP Business Suite Deployment Kick-off
GEOP 4355 Supply Networks: Supplier management
Mark Quirk Head of Technology Developer & Platform Group
Presentation transcript:

Lessons from Survey System Testing at Microsoft: The Good, The Bad and The Ugly Presented by L. Allen Slade Microsoft People Research at the 17 th Annual Conference of the Society for Industrial and Organizational Psychology Contact: L. Allen Slade One Microsoft Way Redmond WA,

Lack of Systematic Testing: The Bad (1998) Actions First global web based survey Vendor churn Trust and hope (i.e., dont test) Impact: Failure Survey locked up Vendor replaced 6 weeks of downtime Data integrity issues? Lesson: Testing is necessary

Emerging Testing: The Ugly (1999) Actions Very limited testing was planned New research team put together a very quick test plan: Load testing Data integrity testing Full system testing Testing results 25% decrease in capacity vs. previous year. Adding encryption reduced capacity further Miscoding employee response. Impact Good user experience. Fixes delayed survey launch by 3 weeks. Lessons Testing must be planned. Always have slack time after the last test to fix your system.

Systematic Testing: The Good (2000) Actions Selected new vendor Evaluated internal testing capabilities. Agreed to full testing as part of contract. Partnered more effectively with internal IT. Did not test reporting ordering tool. Testing results Identified load issues. Tweaked a few data issues. Impact Fixes delayed survey launch 10 days. Virtually flawless experience for employees/managers. HR users: Report ordering tool had slow response time during last two days. Lesson Testing is a partnership. Always have slack time after the last test to fix your system. Test all components.

Systematic Testing v. 2.0: The Better (2001) Actions/context: Refined the test plan – including load testing report tool. Outsourced tasks. Nimda virus hit day after survey launch Testing results Outsourced testers not very effective No load issues identified. Test environment had only MS survey. Data integrity testing revealed bugs – in test data Impact System not penetrated by Nimda virus. Downtime as precaution. Survey locked up on a few users. DLL conflicts between different surveys The tilde problem. Vision impaired employees unable to access survey. Lessons Simplify where few bugs are identified Build test cases that approximate reality. E.g., 70% favorable responses Test survey in production IT environment Accessibility testing (or accommodation)

The Impact of Survey System Testing 1998 The Bad 1999 The Ugly 2000 The Good 2001 The Better Response57.7% (15,824/ 27,444) 66.4% (21,323/ 32,089) 80.8% (32,123/ 39,753) 86.4% (41,252/ 47,721) Downtime6 weeks10 hours2 hours 24 hours Report Ordering Few reports1,550 reports ordered offline through Excel 2,748 reports ordered online 2,226 reports ordered online 4,774 reports pushed thru manager portal

There Never is A Final Version A flawless survey would still need to be tested the next year: Technology changes Systems are complex