PG&E Pipeline Safety Enhancement Program (PSEP)

Slides:



Advertisements
Similar presentations
Why is energy important?
Advertisements

Heartland Coast-to-Coast Corridor Study ___________________ Presented Sept. 11, 2007 Sanibel Harbour Resort Spa Heartland Coast-to-Coast Corridor Study.
Worksheets.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
2014 Egg Industry Issues Forum. Building Excellence for over 90 years PREPARING FOR THE FUTURE!
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District December 2, 2008 EDUCATE ENGAGE.
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
2013 Water Rate Study and Proposed Multi-Year Water Rate Adjustments 1.
11 Expansion Projects Overview – March 2010 Pipeline & Storage Expansion Projects Overview March 2010.
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
Presentation Outline New Millennium Rail Car Initiative
CTS* Project Regulation and Licensing Department Status July 20, 2012 Lori Hewig, IT Director and Project Manager * Construction Tracking System (formerly.
WHO – HIV department | August 18, |1 | November 2013 Core epidemiological slides HIV/AIDS estimates.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 Presenter: Josh Stuckey, Manager Harris County Permits Northwest Freeway Suite 120 Houston, Texas
Superintendent’s Proposed FY 2013 – FY 2022 Capital Improvement Plan May 10, 2012.
FAFSA on the Web Preview Presentation December 2013.
1 ENTERTAINMENT TONIGHT! A GUIDE TO REACHING ENTERTAINMENT AUDIENCES ON MICROSOFT ADVERTISING Source: 1) (Source: eMarketer, Nov 2011) 2) Source: Nielsen.
New Hope Baptist Church Sunday, January 29, 2012.
10/12/ Vacuum Regulator Gas Feed Systems: Theory and Maintenance Thom DiGeronimo OperatorSchool.Com.
10 to 15 Year Golf Course Development Plan. There are currently 3 greens that have been upgraded to/close to USGA specification (1st, 4th, 17th) and 2.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
What: Bringing the Latest Technology to Consumers in Washington 1 © 2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks.
PAST, PRESENT AND FUTURE Jason Smith, TERA Environmental Consultants February 20, 2014 Simon Fraser University.
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Weekly Attendance by Class w/e 6 th September 2013.
ABC Chemical Complex1 PIPELINE SPECIFICATIONS ABC Company ABC Chemical Complex Engineering Specifications.
Physics for Scientists & Engineers, 3rd Edition
Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC.
F o r m u l a M a s s. F o r m u l a a n d M o l e c u l a r M a s s z E v e r y M o l e c u l a r m a s s i s a f o r m u l a m a s s. z N o t e v e.
TransCanada Corporation (TSX/NYSE: TRP)
1 Preparing for emergencies and climate impacts Gina Blus Sustainable Communities Feb. 28, 2013.
Gas Transmission Pipelines
Presented by Environmental Health and Safety
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
Mark Kempic President Columbia Gas of Maryland, Inc. Maryland-District of Columbia Utilities Association Fall Conference Fueling the Economic Engine.
3P Services, Germany Basil Hostage
Stress Corrosion Cracking Overview & Introduction David Johnson December 2, 2003.
1 PG&E Pipeline Safety Enhancement Program San Mateo County Jim Cogan Government Relations.
Steps towards low-risk pipeline inspection Alberto Di Lullo Flow Assurance Engineering Technologies Manager.
1 Philip Sher Connecticut Department of Public Utility Control Gas Pipeline Safety Unit RepresentingNAPSR National Association of Pipeline Safety Representatives.
SoCalGas/SDG&E Natural Gas Pipeline Safety Enhancement Plan (A ) Dave Peck Dao Phan Tom Roberts Kelly Lee Pearlie Sabino ALJ: Long Commissioner:
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
PIPELINE ENGINEERING Multi-Diameter Pigging – Factors affecting the design and selection of pigging tools for multi-diameter.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream.
Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
1 Natural Gas Transmission Pipelines Brisbane City Council Meeting June 6, 2011.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview of Integrity Verification Process (IVP) Workshop Held.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
PIPELINE SPECIFICATIONS
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Transmission 2012 Annual Reports Joint Advisory Committees.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Who is INGAA? INGAA represents the majority of the interstate natural gas transmission pipeline companies operating in the U.S., as well as comparable.
Technology … Can It Save Us? - Toolbelt Evolution - J. A. Drake, P.E. Director, Technical Serivces Duke Energy Gas Transmission.
Maintaining Pipeline Integrity with GIS & Smart Pig Data Analysis Taryn Moser, GIS Technician II 4/28/2016.
Community Pipeline Safety Initiative – St. Helena 1 Community Pipeline Safety Initiative City of St. Helena Tree Commission May 12, 2016.
PIPELINE SPECIFICATIONS
AGA Positions on Current PHMSA Rulemakings
HFPP High Friction Pigable Plug Pipeline Isolations
PIPELINE SPECIFICATIONS
Gas Transmission Pipelines
Presentation transcript:

PG&E Pipeline Safety Enhancement Program (PSEP) For Fresno County Board of Supervisors Jeanette Ishii Sr. Government Relations Representative PG&E Todd Hogenson Director, PSEP Engineering PG&E January 29, 2013

Pipeline Safety Enhancement Program - PSEP PG&E Proposed a Multi-Phase Program Phase 1 2011-2014 Phase 2 would begin 2015 Pipeline Modernization Strength Testing Pipeline Replacements ILI Upgrades & Inspections Valve Automation RCV/ASV Valve Installation & Automation SCADA Enhancements

Pipeline Safety Enhancement Program - PSEP 2012 PSEP Results Pressure Testing: Tested 175 segment miles of pipe Pipeline Replacement: Replaced/Installed 40 miles of new gas transmission pipeline Valve Automation: automated 46 valves In Line Inspection: Retrofitted 78 miles of pipe to accommodate ILI tools

PG&E Gas System Overview

Projects Completed 2012

Projects Planned for 2013

Pipeline Replacement Engineer & permit the new pipeline PG&E is replacing gas transmission pipelines in more parts of our service area than ever before: Engineer & permit the new pipeline Inform the community Construct & strength test the new line Isolate the old pipeline Connect the new line Pressurize the new line Release to Operations

Pipeline Replacement Gas Transmission Projects in Fresno County 2012, total miles installed = 16.2 miles 2013, forecasted miles to be installed = 9.1 miles Line 138……Installed 6.2 miles of pipe in 2012 Line 138……Installing 0.3 miles 2013 Line 111A……Installed 8.6 miles of pipe in 2012 Line 111A……Installing 1.6 miles 2013 Line 138D……Installed 1.56 miles of pipe in 2012 Line 118 A …Installing 7.24 miles of pipe in 2013 L-111 2012 installed, (9.43-1.58) + 0.746 = 8.596 miles

Hydrostatic Pressure Testing PG&E is pressure testing gas transmission pipelines in more parts of our service area than ever before: Inform the community Isolate the pipeline Clear the pipeline Test the pipeline strength Reconnect the gas system

Pressure Testing Projects in Fresno County Line 138 (13.5 miles)…….hydro-tested in 2012 Line 138 ( 3.4 miles)…….planned hydro-test in 2013 Line 118A (0.2 miles)……hydro-tested in 2012 Line 138D (1.5 miles)………hydro-tested in 2012 Total of 18.6 miles of pipeline pressure testing

Valve Automation Inform the community Prepare the pipeline We have several types of automation projects: replacing existing valves, adding or changing automation for existing valves, or installing valves in new locations: Inform the community Prepare the pipeline Install valve automation Test and connect the valve

Valve Automation   Plan to automate 3 valves within Fresno County in 2013 Line 300A, 1 valve Line 300B, 1 valve L-138, 1 valve

Pipeline Retrofits Inform the community Install the access point Many of our pipelines were designed and constructed before modern inspection tools called “smart pigs” were developed. These important devices travel through large pipelines to inspect welds and pipeline thickness, and identify any weaknesses such as dents or corrosion: Inform the community Install the access point Clear the pipeline: Modify the pipeline Test the new features

Pipeline Retrofits for ILI The upgrading of pipelines will include the installation of Launchers and Receivers and removing un-piggable features (plug valves) to accommodate In-Line Inspections (Smart-pigs).   Line 300A (39 miles) was upgraded in 2012 for an ILI in 2013 Line 300B (39 miles) was upgraded in 2012 for an ILI in 2013

Pipeline Safety Enhancement Program - PSEP 2013 PSEP System-wide Goals; Pressure Testing: Test 190 segment miles of pipe Pipeline Replacement: Replace/Install 64 miles of gas transmission pipeline Valve Automation: automate 75 valves In Line Inspection: Retrofit 120 miles of pipe to accommodate ILI tools, Inspect 78 miles

Where to go for more information: Online information about PG&E’s Natural Gas Transmission System and our Pipeline Safety Programs at: www.pge.com/gassystem.

Thank You