Reflections Glass Selection and Specification J. Peter Jordan, FCSI, AIA, CCS, LEED™ AP Jordan Consultants, LLC Houston, Texas Houston Area Glass Association.

Slides:



Advertisements
Similar presentations
What you need to know before you apply
Advertisements

WAYNE DALTON OF SYRACUSE PRESENTS:
Woodharbor Doors & Cabinetry is a registered provider with the American Institute of Architects Continuing Education Systems. Credit earned on completion.
Framing Assignment 4 Print SetSingle Family Dwelling SFD.
2 NTCA is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will.
Creating Interior Backgrounds
Floors & Floor Construction What lies beneath the surface that we see? Concrete slab: is it on grade, or on a frame? Wood joist construction: what direction.
Procurement: We are not Vogons It is a very sobering feeling to be up in space and realize that one's safety factor was determined by the lowest bidder.
Life Science Services and Solutions
Finishes - Preparation. The term aesthetics is used to describe the outward appearance of a product. Basic preparation is needed before any finish can.
FIRE DOOR INSPECTIONS NFPA 80 STANDARDS THIS STANDARD REGULATES THE INSTALLATION AND MAINTENANCE OF ASSEMBLIES AND DEVICES USED TO PROTECT OPENINGS IN.
December 2011 | Maximizing the Outer Envelope Help your customers think from the outside in December
Into the Lion’s Den: Managing Expectations David Boersen, Senior Planner, Babbage Consultants Ltd.
Managing a Successful Mechanical System project Following design – what next?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
1 Trade Skills HVACR116 Fiberglass Duct Board and Insulation Material.
RESILIENT FLOOR COVERINGS.  KINYUA BRIAN MURITHI  KINUTHIA GEROGINA WAMBUI  KYALO PATRICK KELI  KIOKO SHAWN MWENDWA.
Green Building Leadership in Energy and Environmental Design (LEED)
VOCABULARY POWER POINT. VOCABULARY NO. 1 ARTIST – A person who uses imagination and skill to communicate ideas in visual form. SIX ARTISTIC TERMS – line,
Glass Technology: processes and applications Harvard Graduate School of Design.
CRYSTAL FOUNTAINS Canada Mexico Industry Science Workshop.
Energy Environment & Sustainable Development Thematic Network on Energy in the Built Environment Thematic group 5 : Building Components (including windows.
INTERIOR WALL FINISHES
Construction Engineering 221 Drawings and Specifications.
Getting Your Fair Share For Professional Service Providers.
Glass & Glazing.
Spontaneous Glass Breakage
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
The Importance of the Qualifications Based Selection (QBS) Process
Slide Title EDUCATING SUPPORTING REPRESENTING title goes here Borrower Survey Chartered Accountants NAMA FORUM Conor O’Brien.
Chapter 21 Cladding with Metal & Glass
Glass. Raw Materials Soda-lime-silicate which is made from –silica (sand) –Soda –Lime.
Choosing the Right Siding When selecting siding, there are six basic issues to consider: 1. Water Resistance. Water-resistant types of siding will have.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
Atlantis 1 st September, 2014 Presentation. Atlantis 1 st September, 2014 Why People Should Hire an Interior Designer ? It’s something to think about.
ARC 810: Building Climatology Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 810: Building Climatology Department of.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
Written by: Micah Rooke Georgia CTAE Resource Network 2010.
Artworks created to support worship ceremonies (rituals and celebrations). Artworks to express or communicate emotions, ideas, feelings, or to decorate.
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
Construction Joints Head of Wall Deflection Systems An AIA Continuing Education Program Credit for this course is 1 AIA/CES Learning Unit for HSW credit.
Copyright © 2009 Delmar, Cengage Learning Chapter 12 Synthetic Materials.
The Certified Private Equity Professional (CPEP) Designation
CE 241 MATERIALS SCIENCE Introduction
An Introduction To Food Service Consulting FCSI & AIA Working Together.
Modelling Design for Manufacture.  Plays a vital role in the process of designing. From conception to completion  Three dimensional models: Provides.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
2015 NAIOP Northwest Florida Development Award Nomination Form Instructions Slide Slide 1 is for instruction purposes only and should not be included in.
Floor Coverings. Floor coverings are materials that are used as the top surface of a floor. What are they?
Chapter 14. Popular Coordinates well with all styles of furniture Adds beauty and warmth Has some resilience, durability, and resists dents Cost is moderate.
Material Properties Brian Russell.
Choose Right Retractable Awnings
Texture coating system: give your house an elegant look
ABOUT US We Decor Enterprise are one of the leading manufacturer of False Ceiling Systems, Gypsum Board, Decorative Ceiling in Kolkata. We offer premium.
Aluminum Siding Repair Toronto
Manufacturer of Roofing Sheds - Roofing Contractor, Commercial Roofing Sheds and Steel Roofing Shed Experienced temporary storage tent roofing services.
Remodeling and Renovating
Heat gain and heat loss in buildings
All About Window and Doors
All About Windows Replacement
Construction Glass Market Global Scenario, Market Size, Outlook, Trend and Forecast, 2015 – 2024 Bhavana Patel SEO Analyst
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Understanding Standards Art and Design (Higher)
Environmental Product Declarations
Editing & Polishing your Assignment
Glass NAME: Nada Al salimi Nasra AL SAAIDI.
Leadership in Energy and Environmental Design (LEED)
Alamdar Innovations Crafted with Perfection
AVANT ART GLASS BROOKLYN.
Presentation transcript:

Reflections Glass Selection and Specification J. Peter Jordan, FCSI, AIA, CCS, LEED™ AP Jordan Consultants, LLC Houston, Texas Houston Area Glass Association July 12, 2012

Jordan Consultants, LLC Jordan Consultants, LLC, seeks to add value to its clients’ design and construction through building product research, evaluation, and selection, production of construction specifications, and advising on sustainability, project procurement, and building envelope performance. Since its formation in 2006, the firm has provided specifications for more than 350 projects in Texas, Florida, New York, and Connecticut. Mr. Jordan has practiced in Georgia, Hawaii, and Texas, and has worked on projects in Texas, Florida, California, New Mexico, New Jersey, Hawaii, and throughout the Pacific Rim. He is a member of AIA and CSI, a Certified Construction Specifier, and a LEED Accredited Professional.

Introduction When I first started working in architectural practice in the mid-1960s, glass options for glazing were limited to 1/4-inch glass in a few tints. Architects must now select from a variety of glazing materials and assemblies of those materials, each of which offers a slightly different advantage in performance or appearance.

Introduction They generally don’t do it very well.

Introduction Have you seen specifications for: 1/4-inch polished plate? “No tong marks” on annealed glass? LOF as a specified manufacturer? Low-e glass; just “low-e glass”? Have you been scratching your head, asking “What th’ heck?”

Introdction This presentation is a quick overview of: What architects should be considering in selecting and specifying glazing. Constraints in specifying glass. How to respond to an ambiguous or defective specification.

I can see clearly now…

Glass (as you know) Glass is a clear, rigid, supercooled liquid, that is manufactured primarily from silica (sand) soda ash, and limestone with traces of other materials. Glass may be annealed, tempered, bent, formed, coated, or laminated to provide complex assemblies for functional and decorative purposes.

Glass and glazing Generally, glazing preserves visual contact between two spaces, usually between inside and outside while providing a weather barrier.

Glass and glazing Glazing may also serve as a barrier for Thermal energy transmission. Sound transmission. Security. Ballistic and blast protection.

Glass and glazing Glazing may be simply glass, but glazing may also be: Plastic (acrylic or polycarbonate). Clear ceramic (fire-rated glazing). Assembly of one or more of any products listed above.

Glass The standard for commercial glass is ASTM C 1036 “Standard Specification for Flat Glass.” This specification covers: Clear and tinted flat glass (annealed or float glass) Wired flat glass Patterned flat glass

Glass Selection

Ten years ago, PPG Industries ran a marketing campaign to Architects: “Looks are everything!”

Glass Selection It wasn’t really true then, and it is even more complex today: New energy codes. New windstorm codes. New security concerns.

Design Intent The Architect will have an idea about what the building looks like… Is the surface smooth or textured? Is the surface shiny or matte? What color (or colors) is it? Is the building structure concealed or expressed? These concerns affect the “Visual Quality” of the building design.

Design Intent The “Visual Quality” then needs to be balanced against concerns for: Thermal comfort Structural performance Cost

COST Glass Selection Glass selection should be made in response to: Visual Quality Thermal Performance Structural Performance

Glass Selection Questions: Clear? Tinted? What color? Reflective? What color? Screened? Pattern or image? What color? Visual Quality

Glass Selection Questions: Wind pressure? Burglar resistance (smash-n-grab) Debris impact resistance? Bullet resistance? Blast resistance? Structural Performance

Glass Selection Questions: Solar heat gain coefficient? U-value? Thermal Performance

Glass Selection Visual Quality Thermal Performance Structural Performance

COST Glass Selection At the end of the day, glass selection will be made in response to:

Glass Performance - Cost Cost of the glazing unit is determined by: Base cost of glass as manufactured Cost of fabrication processes such as Application of reflective coating Application of low-e coating Application of fritted coating Lamination process (two plies or three or more) Insulted glazing fabrication (two lites or three)

Glass Performance - Cost So… Cost of glass + application of low-e coating + insulated glazing construction (with two pieces of glass) will probably cost less than Cost of glass + application of low-e coating + application of reflective coating + insulated glazing construction (with two pieces of glass) will probably cost less than …

What Does the Architect Want?

Choose one… The best looking stuff The good stuff The most expensive stuff The cheapest stuff The right stuff

What Does the Architect Want? The real answer is The most economical product that meets the critical design criteria, including Visual quality Thermal performance Structural Performance

What Does the Architect Want? How does he go about it?

Drawings and Specifications Drawings and Specifications should communicate the Architect’s “design intent” to Bidders for pricing and Contractors for construction.

Drawings and Specifications What if critical decisions have not been made? What if the Architect’s “design intent” is not clear?

Drawings and Specifications Ambiguity should have a price… The price should not undermine the critical design criteria.

What to do?

If you are bidding, Get a copy of the Drawings and Specifications, and get them early enough for a thorough review. If there are discrepancies, conflicts, or omissions, ask questions. Don’t make an assumption which may lead to submitting a bid for the wrong stuff. Submit an RFI on a timely basis.

What to do? If the Architect says “Bid it the way I drew it,” Consider walking away from the job; it could be a gigantic headache and you may be expected to provide stuff you didn’t include in your price. You may or may not get paid for this. Consider carefully whether you should submit a bid for what you think the Architect wants or submit a “lowball” bid and request a change order later.

What to do? If you have a contract in place, Confirm product selections through submittals before ordering products. Allow plenty of time for multiple submittals. Don’t hesitate to inform everyone if the direction that the selection process is going will mean a change order.

What to do? If the project is seeking LEED certification, Thermal performance will be important if not critical. If there is a significant amount of glass on the project, location of manufacturer and fabricator may be critical.

Conclusion

Conclusion The glass industry has evolved over the last 50 years, becoming more complex in the types of products offered. At the same time, glass performance and aesthetics have become more sophisticated and, in some ways more critical. Architects can choose from a variety of products and assemblies to meet specific requirements.

Conclusion However…

Conclusion Effective product selection and specification requires more attention and knowledge than ever before. Product representatives and Installers provide helpful information helpful, but to be effective, they must be given design criteria that are meaningful.

Conclusion Architects must become more informed so that they can make good use of the expertise that is available.

Conclusion If this process comes together so that intelligent decisions are made, Then… Meaningful specifications that really do communicate design intent can be developed, and Glazing product manufacturers and installers will better understand the requirements for the project.

END OF SECTION J. Peter Jordan, FCSI, AIA CCS, LEED™ AP Jordan Consultants, LLC 50 Briar Hollow Lane Suite 235W Houston, Texas Tel: (713) Fax: (713)