How to Enhance the Competence in Mathematical Modeling by Implementing ‘Lesson Study’ in the Case of Flood? Indonesian Case.

Slides:



Advertisements
Similar presentations
1 Update on Bicyclist & Pedestrian Data Collection and Modeling Efforts Transportation Research Board January 2010 Charlie Denney, Associate Michael Jones,
Advertisements

The Burden of Obesity in North Carolina Healthy People 2010 Objectives, U.S.
50: Weather Effects.
China: Water Management and Accounting Project May 22-24, 2006 Hague.
Heart of West Michigan United Ways Partnering with the Kent County Health Department to Prevent the H 1 N 1 Virus Presented by Robert McKown Heart.
Building Capacity for Integrating Climate Change and Public Health Programs at Local Health Departments June 18, 2009, 1:00-2:00 EDT.
Facilitates funds flow from CAPITAL MARKET to HOUSING SECTOR HOUSING FINANCE IN INDONESIA ASIA PACIFIC UNION OF HOUSING FINANCE INTERNATIONAL CONFERENCE.
RIVER DRAINAGE BASINS.

The passage of water through the Drainage Basin
Boscastle August 2004 Case Study of a flooding incident in the U.K. What are we learning today Dino? The location of Boscastle. The cause of the flood.
Deadly floods hit southern Africa Severe flooding in Zimbabwe and Zambia has killed at least 21 people and left thousands homeless in the past month, and.
Ontario Low Water Response (OLWR)
DIASPORA HOMES (K) Ltd Providing housing space to eradicate slums By ERNEST KAMAU Tel /5 Nairobi, Kenya.
Water in a river drainage system
WHY DID MISSOURI CITY ADOPT A JOINT GROUNDWATER REDUCTION PLAN? A subdivision in Baytown, located in Harris County, has been turned into a park and is.
Turning a Water Plan into Water Dan Hardin, Director of Water Resource Planning.
For a CLEAN GREEN Dallas New Once-Weekly Service for Recycling and Garbage Town Hall Meeting February 7, 2008.
2004: THE HURRICANE SEASON THAT TERRORIZED FLORIDA BY JACOB WALDEN.
Motion and Measurement Nic Gilbertson & Funda Gonulates Strengthening Tomorrows Education in Measurement (STEM) Project Michigan State University Math-in-Action.
Cost-Volume-Profit Relationships
MOBILE STATISTICS - first contact
WGP-AS UNDP/RBAS Water Governance Programme for Arab States (WGP-AS) NATIONAL CAPACITY NEEDS FOR THE EFFECTIVE JOINT MANAGEMENT OF SHARED WATER RESOURCES.
Middle School 8 period day. Rationale Low performing academic scores on Texas Assessment of Knowledge and Skills (TAKS) - specifically in mathematics.
CWN Rainwater Management, June 20-21, 2007 Richard Boase, P.Geo., CCEP North Vancouver District New Directions In Urban Watershed Health.
City Council Meeting Agenda Items October 28, 2013.
Addition 1’s to 20.
Future impacts on sewer systems in England and Wales Overview of a project for Ofwat Presented to the Water Statistics Group Andrew Heather and Adam Grove.
Jurandir ZULLO Junior Effective use of agrometeorological systems and information Expert Meeting on Weather, Climate and Farmers.
Weekly Attendance by Class w/e 6 th September 2013.
1 Circuit 10 – Central Region CBC Performance and Quality Improvement Meeting Scheduled for Wednesday, August 20 th, 2014 at 10 a.m. Data for Week Ended.
R Street Improvement Project (30% Review Meeting) February 28, 2007 August 20, 2008 City of Sacramento R Street Market Plaza Project 16 th Street to 18.
FLOODING IN BANGKOK, THAILAND AREA Worst flooding in 50 Years JULY - OCTOBER, 2011 Dr. Walter Hays Global Alliance For Disaster Reduction.
TURKISH EDUCATION SYSTEM REPUBLIC OF TURKEY Language:Turkish Currency:Turkish Lira (Alphabet: Latin) Population: About Capital City: Ankara.
117 million 470 million. (Hectares)
Pathleen Titus CARDI Representative , St Kitts and Nevis
Water Terms
Ground water.
Chapter 6 Section 1 – Running Water
The Hydrologic (Water) Cycle. Surface Water Oceans Rivers and streams Lakes and ponds Springs – groundwater becomes surface water.
Water Crisis in China and Africa By: Naima Uddin Latchmie Singh.
STREAM STEWARDS. CONTINUATION OF HIJACKED POWERPOINT.
Exeter 8/12/00.
Climate Change-Related Priorities. Turkmenistan Almaty
How to Enhance the Competence in Mathematical Modeling by Implementing ‘Lesson Study’ in the Case of Flood? Subanar Fadjar Shadiq SEAMEO QITEP in Mathematics.
RIVER DRAINAGE BASINS. A RIVER SYSTEM ACTS LIKE A SYSTEM OF DOWNPIPES AND GUTTERING ON A HOUSE - IT ALLOWS THE MOVEMENT OF RAINWATER INTO THE SEA.
Assessment Task: You are a photo editor for a news organisation who is putting together a presentation on the causes, effects and responses to flooding.
Natural Disasters in Florida
The Water Cycle Unit 9 – Day 1 Please open your red textbook to page 4.
WATER CONSERVATION The process of saving water for future utilization  Need for water conservation – Changes in environmental factors – Better lifestyles.
Extinction of Species Deforestation, of course, causes trees to be cut or burned down. Many animals will lose their homes and migrate to other unsuitable.
6. Drainage basins and runoff mechanisms Drainage basins Drainage basins The vegetation factor The vegetation factor Sources of runoff Sources of runoff.
Water cycle basics ManagingWholes.com Use keys to change slides.
A RIVER SYSTEM ACTS LIKE A SYSTEM OF DOWNPIPES AND GUTTERING ON A HOUSE - IT ALLOWS THE MOVEMENT OF RAINWATER INTO THE SEA.
Water Terms
What is the water cycle?.
Why do people try to manage rivers?.
Water Terms
Environmental Issues.
What is the water cycle?.
Water Terms
Water Cycle It keeps cycling back
Water Cycle It keeps cycling back
Hydrology CIVL341.
Flooding Saturday, 23 February 2019
Hydrology The study of water.
Hydrology CIVL341 Introduction
Presentation transcript:

How to Enhance the Competence in Mathematical Modeling by Implementing ‘Lesson Study’ in the Case of Flood? Indonesian Case

Why Did ‘the Big FLOOD’ Happen in Jakarta in January 2013? How to Overcome it? Water can be our friend, but it can be dangerous How to control it? Technology VS Nature?

An Indonesian woman carries her daughter as she wades through flood water in Jakarta in January, Thousands of houses were inundated in the capital and some cities in Java following heavy rains, forcing the residents to flee their houses. (EPA Photo/Mast Irham). Jakarta Flood Prevention Must be the ‘Top Priority’ Source: prevention-needs-to-be-top-priority/563595

Breaking news-world President’s residence flooded, and embassies shut in underwater capital Jakarta ( :05) Source:

Losses on Jakarta Flooding YearTotal VictimsTotal Material Looses people dead 320,000 people displaced IDR 4.3 trillion of losses on an area of square km people dead 245,119 people displaced IDR 32 trillion of losses Source: 1.( html) html 2.( trillion/568862http:// trillion/ ( akibat-banjir-jakarta) akibat-banjir-jakarta

1.Land in Jakarta is already saturated 2.Ability of the river only able to drain less than 30% of existing flood 3.At Bogor, loss of function of absorbing up to 50 percent compared to the condition 15 years ago 4.Excessive groundwater exploitation 5.Decrease in soil at 10 centimeters per year 6.High tide on the middle of the month Source: TEMPO.CO - Fri, January 18, 2013 Green open space does not meet the minimum requirement of 30 percent of the total area. Water catchment areas in Jakarta only collects less than 10 percent of broad capital Six Causes of the Great Flood in Jakarta

How to Overcome? Biopori is a small tunnel found underground in healthy soil and is created by tree roots and soil organisms such as worms and termites. Therefore it can enhance the soil capacity, preventing floods and droughts, reducing organic trash, and facilitating agriculture. Source: httpwww.riverbasinplan.orgimagesstoriesRBPWhatIsBiopori.pdf Technology is not sufficient to overcome the flood. Save the nature is more important  How math contribute to the sustainable development? How about if every student has to participate in implementing the Biopori System in his/her school and home?

Build a Big Tunnel in Jakarta The diameter will be 16 m The length will be 19 km The cost will be IDR 16.4 T Government’s Programs (1)

Government’s Programs (2)  Building 10,000 infiltration wells in Jakarta Infiltration wells could reduce the flow of surface water that it can avoid the puddle of excess surface water flow which causes flooding.  Conducting “1,000,000,000 trees” program in Indonesia (One Billion Indonesian Trees for the World) It is an effort to establish society’s culture to plan and preserve trees. This program has been initiated by the Ministry of Forestry of the Republic of Indonesia since 2010.

Government’s Programs (3)  Building 50,000 Ponds in Jakarta The ponds could reduce the flow of surface water that it can avoid the puddle of excess surface water flow which causes flooding.  Its dimension is 5m  5m  2m for each pond  The cost is 500,000  IDR 1,000,000  Each pond can catch 50m 3 of water in average  Each pond can absorb 10 times of the volume of the pond  500m 3  500,000 ponds can absorb 500,000,000m 3 of water = 1/3 of water that discharged into the sea Source: Kompas, Wednesday 6 Feb 2013

The Tasks that the Students might do?  Measurement of rainfall How to measure the intensity of the rainfall? How to relate rainfall with flooding?  The Rainfall data collection from BNPB (National Disaster management Agency) for various places in Indonesia)  Ratio, proportion, and direct variations in relation Relationships between the number of trees and the volume of ground water Relationships between ground water, proportion of people and flood Ratio of population in Jakarta and other places in Indonesia from year to year

 Green open space Related to the program of 30% open space, why the minimum requirement of it is 30% of the total area. Measure the green space in school.  Building a Big Tunnel or 50,000 Ponds? How many m 3 of water can be absorbed in the case of 50,000 Ponds and will be discharged into the in the case of big tunnel. What about the cost? Government’s Programs (1) `

LS on Flood in QiM’s Programs  Writing proposal and designing instrument (April 5 th - 9 th, 2013)  Plan step  4 teachers  4 staff of QiM  Collecting data (May, June, July 2013)  Do and see step  2 elementary schools  2 secondary schools  Analyzing data and writing report (August 1 st - 3 rd, 2013)