Total Loss Monitor Report All experimenters meeting 5/12/14 A. Leveling.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Who Wants To Be A Millionaire?
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
0 - 0.
Editing Instructions Simply add a question and 4 possible answers by overtyping the white text. The green box on the next slide shows which answer should.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
September – October, 2012 Maryann Donie
Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Teacher Evaluation Instructional Collaboration Day #2 January 3, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Total Loss Monitor Radiation Safety System Accelerator Physics Technical Seminar A. Leveling 10/7/14.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Booster Radiation Damage Facility (RDF) Some History The Radiation Damage Facility originated in the AP4 beam line, used primarily for testing the D0 Vertex.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
F Project X Overview Dave McGinnis October 12, 2007.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
1 Tunnel implementations (laser straight) Central Injector complex.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Predicting Residual Radiation using Beam Loss Data – Early Results Bruce C. Brown 10 March 2010 Main Injector/Recycler Group Meeting.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
TLM example application T. Leveling March 15, 2013 Attendees: Don Cossairt Kamran Vaziri Adam Olson Dave Peterson John Anderson Paul Czarapata Tony Leveling.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
Friday July 27, 2007 Page 1 Shutdown 2007 ES&H Enclosure Access  Linac Remains Operational until August 13 th  Booster RWP’s and enclosure access keys.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Mu2e Meeting, FNAL, September 15-16, 2006 E Prebys 1 Radiation and Slow Extraction Issues* (work in progress) Eric Prebys, FNAL/AD.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
09:00 Meeting Shutdown Update June 29 th 2015 Cons Gattuso AD Shutdown Manager.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Fermilab Limited Scope Accelerator Readiness Review (ARR) October 1 -3, 2013 Technical Breakout Session 2A Radiological Safety for 700 kW Operations.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Shielding Design for LCLS Injector Operation – Phase one
News and brief overview of Beamline plans for the next few months
CLIC damping rings working plan towards the CDR
Maximum Credible Beam Event Paul Emma et al
(Beam) Commissioning Plan
Presentation transcript:

Total Loss Monitor Report All experimenters meeting 5/12/14 A. Leveling

5/12/2014 A. Leveling 2 TLM detector cable Chipmunk Chipmunk electrometer (blue box) Chipmunk ion chamber Prelude

5/12/2014 A. Leveling 3 3 parallel TLM detectors 125’ 250’ 350’ Pbar A2B7 magnet TLM provides continuous, in-tunnel coverage Chipmunks provide discrete, above-ground coverage Prelude

The problem:  Radiation Safety System (RSS) at pbar service buildings includes 42 Chipmunks  Adequate for the 8 GeV, 13 watt pbar ops  RSS needs to be extended for 8 GeV, 8 kW mu2e operation – about 200 units  Unit cost is about $10k or total of $2M  Includes detector construction, doghouses, electrical installation M&S, RSS infrastructure  Would add tremendous complexity, e.g.,  Chipmunks require annual calibration  RSS testing 5/12/2014 A. Leveling 4

Why TLMs?  Following a Director’s review in May 2011 for mu2e CD1, ESH&Q Section Head suggested that we consider Long Detectors in lieu of Chipmunks  Long detectors have a long history at FNAL; they have been highly regarded by their proponents  Switchyard  Booster  NuMI  External beam lines  The obstacle: long detectors could not serve in the capacity of a CREDITED CONTROL for the Accelerator Safety Envelope 5/12/2014 A. Leveling 5

Development history  Work to characterize long detector response began immediately in May 2011  A long series of studies was conducted at pbar to characterize detector response as a function of 8 GeV beam loss  Detector response curves for the ion chamber region were developed 5/12/2014 A. Leveling 6

Development history  BLM electrometers were used in early studies with disappointing results  A Chipmunk, sans ion chamber, was then used (aka blue box, electrometer)  Provided linear, predictable response  The blue box was already a critical component of the existing RSS!  Electrometer: collects and measures charge produced in the detector 5/12/2014 A. Leveling 7

TLM electrometer development  The job was simply to mimic the features of the existing Chipmunk  Provide a heartbeat function  Failsafe design  Key problem was to develop the required dynamic range, not just for mu2e but for all conceivable applications – Booster, MI, NuMI, etc.  A couple of new design features were created to eliminate lost data collected by the site wide Radiation Monitoring System (MUX) 5/12/2014 A. Leveling 8

TLM detector/electrometer testing  3 electrometers were designed  The chosen design has been in service in wide variety of applications starting in December 2012  Linac – 10 foot detector  Booster – 180 foot detector (P10-12)  Pbar – 125’, 250’, and 350’ detectors  NuMI – four 200’ connected in series  NML – 10 foot detector 5/12/2014 A. Leveling 9

How does it work?  The shielding thickness available at a given location, along with desired occupancy, determine upper limit of allowable beam loss  The TLM trip level is determined from our knowledge of detector response as a function of beam energy and intensity  Developed over the past 3 years with measurements 5/12/2014 A. Leveling 10

Progress over the past year  Electrometer module development and construction – completed end of April 2013  Prototype and detector testing - May 2013 to present  Documentation submitted to AD ES&H - October 2013  ES&H Section Approval - May 2014  Allows $2M risk for mu2e to be retired  Cost of TLM systems about $200k 5/12/2014 A. Leveling 11

What does preliminary approval mean?  We can build, install, AND connect systems to the RSS  First application is Booster  A system covering the entire ring will be installed later this year  A parallel section of detector already installed in Booster (P10-12) will be compared with its new companion for a period of 1 year  Assuming required documentation is submitted and testing period goes well, we could be expect FINAL APPROVAL in September /12/2014 A. Leveling 12

Other applications to be studied before final approval  NuMI beam line  Already under study since 9/2013  MI52, slow resonant extraction at MI  MI30 collimation section  ASTA  By the time TLMs are required for mu2e, their use will have been well established 5/12/2014 A. Leveling 13

Extra slides 5/12/2014 A. Leveling 14

5/12/2014 A. Leveling 15