ESPM 14 Dublin 8-12 September 2014 The EST and SOLARNET projects FRANCESCA ZUCCARELLO and the EST & SOLARNET TEAMS.

Slides:



Advertisements
Similar presentations
Oct.10, 2007EAMA7 Japanese Space Activity on Exoplanets (JAXAs prespective) & Pathways to Habitable Planets September 16, 2009 Takao Nakagawa (ISAS/JAXA)
Advertisements

Zürich, January 28, 2009 ERCIM WG eMobility Meeting Torsten Braun University of Bern, Switzerland
Research and Innovation Research and Innovation SME support under HORIZON
The Intelligent Energy – Europe Programme at a glance
1 DG Regio Evaluation Network Meeting Albert Borschette, Brussels, 14 October 2010 Ex post evaluation of Interreg III - Presentation of Final Results Pasi.
1 17/3/2009 European Commission Directorate General Information Society & Media Funding Instrument Briefing for Remote Reading.
24.1 The Study of Light Visible light from sun is only a small part of what’s emitted Electromagnetic waves Radio waves, IR, light, UV,
The Science of Solar B Transient phenomena – this aim covers the wide ranges of explosive phenomena observed on the Sun – from small scale flaring in the.
Indian Institute of Remote Sensing Indian Space Research Organisation Dehradun Challenges in Capacity Building in Remote Sensing & GIS P. S. Roy
Information about the Integrated Infrastructures Initiatives (I3) instrument Daniel Pasini EC, DG Research, Unit B3 – Research Infrastructures EC, Brussels,
Basics & Motivation Technique & Observations Fits & Measurements Summary & Outlook Atmospheric Wave Workshop ESTEC 11/10/2011 Tobias Stangier I st Physics.
Field Operational Tests in 7FP Fabrizio Minarini Head of Sector DG INFSO - ICT for transport.
METHODS The FETRIC project is targeted to some identified shortcomings and gaps; for example: lack of links and understanding between the research community.
Space Science and Technology Looking up – looking down Peter Allan STFC Head of Space Data Division.
Oficina AproTECH de AETIC: Información y asesoramiento en la preparación de propuestas de I+D+I The structure of the FP7: Funding schemes,
Oskar von der Lühe Kiepenheuer-Institut für Sonnenphysik, Freiburg.
SOME COMMENTS ABOUT THE GIANT CHINESE SOLAR TELESCOPE CONCEPT JACQUES M. BECKERS Beijing August 6 – 8, 2011.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
High Altitude Observatory (HAO) – National Center for Atmospheric Research (NCAR) The National Center for Atmospheric Research is operated by the University.
Intro to Stellar Astrophysics L21 The tools of astrophysics ä Virtually all information about the external Universe is received in the form of electromagnetic.
The Frequency Agile Solar Radiotelescope Current Status & Plans T. S. Bastian NRAO.
1.B – Solar Dynamo 1.C – Global Circulation 1.D – Irradiance Sources 1.H – Far-side Imaging 1.F – Solar Subsurface Weather 1.E – Coronal Magnetic Field.
DOPPLER DOPPLER A Space Weather Doppler Imager Mission Concept Exploration Science Objectives What are the most relevant observational signatures of flare,
990901EIS_RR_Science.1 Science Investigation Goals and Instrument Requirements Dr. George A. Doschek EIS US Principal Investigator Naval Research Laboratory.
Visible Satellite Imagery Spring 2015 ARSET - AQ Applied Remote Sensing Education and Training – Air Quality A project of NASA Applied Sciences Week –
Instrumental & Technical Requirements. Science objectives for helioseismology Understanding the interaction of the p-mode oscillations and the solar magnetic.
Science Specification of SOLAR-C payload SOLAR-C Working Group 2012 July 23.
ATST Science Requirements ScienceTeam. Outline/Scope State Requirements – focus on top level No attempt to give detailed explanation or justification.
Solar local and global magnetism new challenge for long-lasting synoptic observations. (Topic 1. New and continuing scientific questions) A.Kučera, P.
By: Kiana and Meagan. Purpose  To measure solar magnetic fields  To understand how energy generated by magnetic-field changes in the lower solar atmosphere.
Big Bear Solar Observatory NST Main Features  All reflecting, off-axis Gregory optical configuration  PM: 1.6 m clear aperture with f/2.4  Figuring.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Collaboration of BBSO/NST and SOT Haimin Wang Big Bear Solar Observatory 1. Six-station Global Full Disk Halpha Network –Large scale structure of flares.
YunNan One Meter Infrared Solar Tower Jun Lin. Why is YNST? After Solar-B launch, what can we do by using of ground-based telescope ? Detailed chromosphere.
18-April-2006XRT Team1 Initial Science Observations Solar-B XRT Ed DeLuca for the XRT Team.
FP7 – Capacities Research Infrastructures and Research for the Benefit of SMEs.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
TESIS on CORONAS-PHOTON S. V. Kuzin (XRAS) and TESIS Team.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Polarization Calibration of the Daniel K Inouye Solar Telescope (DKIST) formerly Advanced Technology Solar Telescope David Elmore Instrument Scientist.
Solar Physics within OPTICON O. von der Lühe Kiepenheuer-Institut für Sonnenphysik Freiburg, Germany.
Solar Orbiter Mission (ESA) - The near-Sun phase  approach the Sun as close as 48 solar radii (~0.22 AU). At these distances, the angular speed of a spacecraft.
Opportunities for Joint SOT – Ground Based Observations Using NSO/Tucson Facilities J. Harvey, NSO.
DEPARTMENT OF PHYSICS AND ASTRONOMY X-ray Astronomy and Space Instrumentation I3 Meeting, December 2004 Integrating Space Radiation Sensing Infrastructures.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
The Role of an Access Programme: Lessons for FP7 Birgitta Nordström Niels Bohr Institute, Copenhagen University Denmark.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
Supporting the “Solving Business Problems with Environmental Data” Competition 24 th October 2013 Vlad Stoiljkovic.
Fabry-Perot Approach to SPRING Sanjay Gosain NSO.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
Big Bear Solar Observatory Some ground-based technology developments that will propel solar physics Phil Goode for Jeff Kuhn Big Bear Solar Observatory.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
FP7 EU – Grant Nr
SOFIA — The Observatory
Environmental and Disaster Monitoring Small Satellite Constellation
WP 70:Turbulence characterisation and correction Lead Institution: IAC
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
02/04/17 1.
Phil Goode for Jeff Kuhn Big Bear Solar Observatory
Upcoming Facilities of IIA
Big Bear Solar Observatory – The NST
60.1 Large Diameter Etalon Development
Theme 2 AO for Extremely Large Telescopes
Overview Instrument Role Science Niches Consortium science
Earth Science Ch. 24 The Sun.
Understanding solar flares from optical observations Heinzel, P
Theme 2 AO for Extremely Large Telescopes
Slit and Slot Interchange
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

ESPM 14 Dublin 8-12 September 2014 The EST and SOLARNET projects FRANCESCA ZUCCARELLO and the EST & SOLARNET TEAMS

ESPM 14 Dublin 8-12 September 2014 Today: several national European solar facilities on Tenerife and La Palma

ESPM 14 Dublin 8-12 September 2014

ESPM 14 Dublin 8-12 September 2014 EST A large aperture 4-meter telescope to be built in the Canary Islands EST is promoted by EAST European Association for Solar Telescopes: a consortium formed by institutions from 15 European countries with the aim, among others, of undertaking the development of the European Solar Telescope, to keep Europe on the front line of Solar Physics. Countries represented in EAST

ESPM 14 Dublin 8-12 September 2014 Countries represented in EAST Countries directly involved in the EST Design Phase Budget: 6.7 M€ FP-7 EC funding: 3.2 M€ 1 Feb June 2011 Project Coordinator: M. Collados (IAC) 29 partners plus 9 collaborating institutions

ESPM 14 Dublin 8-12 September 2014 EST goal is to provide an answer to the following questions How does the magnetic field evolve and emerge to the surface ? How is energy transported from the photosphere to the chromosphere ? How is the energy released deposited in the upper atmosphere ? Why does the Sun have a hot chromosphere and a hot corona ? What causes the explosive events (flares, filament eruptions, CMEs) ?

ESPM 14 Dublin 8-12 September 2014 Telescope and instrumentation key requirements EST must specialise in simultaneous spectropolarimetry of the photosphere and the chromosphere Must have superb optical quality, with very high throughput Must have integrated high-order AO and MCAO Must have spectrograph capabilities from blue to near-IR (with several simultaneous spectral regions) Must have narrow-band tunable filtergraphs from blue to near-IR, simultaneously accessible Must have complementary imaging channels to observe photospheric and chromospheric layers (G-Band, Hα,…)

ESPM 14 Dublin 8-12 September 2014 Design baseline 4-meter diameter On-axis Gregorian configuration Alt-Az mount Simultaneous instrument stations (each with several wavelength channels) - Broad-band imager - Narrow-band tunable imager - Grating spectrograph MCAO integrated in the optical path

ESPM 14 Dublin 8-12 September 2014

Diameter of the primary mirror: 4070 mm Diameter of the secondary mirror: 800 mm Spatial resolution on the solar disk: 30 km (goal 20 km)

ESPM 14 Dublin 8-12 September 2014 D1 D /75 NBNIR 1 ( nm) NBNIR nm) D2 NB1 ( nm) BB1 CaII core BB3 H  CaII IR SPvis SPNIR D3 NB2 ( nm) NB3 ( nm) Lower floor Upper floor Beam from telescope BB2 CaII wing NIR VIS BLUE GREEN-RED RED

Coordinator institution : IAC INFRA Research Infrastructures for High-Resolution Solar Physics Grant Agreement no Integrated Infrastructure Initiative (I3) Purpose: I3 combine in this call 1) Networking activities, 2) TransNational and Services activities 3) Joint Research activities.

SOLARNET : AIMS Integrating the major European infrastructures in the field of high- resolution solar physics Realise Trans-national Access to external European users Enhance and spread data acquisition and processing expertise to the Europe-wide community Increase the impact of high-resolution data by offering science-ready data and facilitating their retrieval and usage Encourage combination of space and ground-based data by providing unified access to pertinent data repositories

ESPM 14 Dublin 8-12 September 2014  Pipelines GREGOR: GFPI, GRIS,BLISS SST: CRISP, TRIPPEL, CHROMIS THEMIS: MTR, TUNIS VTT: TESOS, LARS DST: IBIS, ROSA  Data Compression  Image Restoration  Solar Virtual Observatory (SVO) Data reduction and Archives

ESPM 14 Dublin 8-12 September 2014 SOLARNET : AIMS Foster synergies between different research communities by organising meetings where each presents state-of- the-art methodologies Train a new generation of solar researchers through setting up schools and a mobility programme

Develop prototypes for new-generation post-focus instruments Study local and non-local atmospheric turbulence, their impact on image quality, and ways to negate their effects Improve designs of future large European ground-and space- based solar telescopes SOLARNET : AIMS

ESPM 14 Dublin 8-12 September 2014 SOLARNET: Advanced Instrumentation Development Four instruments to be developed: 1.Large diameter Etalon Development (100 – 300 mm) Several layouts are explored 1.Image slicer for 2D spectroscopy Design developed for EST has been adapted for 1.Microlens-fed spectrograph must be adapted and optimized for polarimetric measurements 2.Fast Imaging Polarimeter based on fast, low-noise pnCCD sensor

ESPM 14 Dublin 8-12 September 2014 Adaptive Optics (AO) Multiconjugate Adaptive Optics (MCAO) Simulations and Tests Implementation of an AO prototype for THEMIS Development of an innovative heat rejecter prototype for GREGOR Atmospheric Seeing Characterization Application of CFD techniques for local seeing optimization Wavefront control

ESPM 14 Dublin 8-12 September 2014 Synoptic Observations Solar Physics Research Network Group (SPRING) 4 working groups:  Synoptic magnetic fields  Solar seismology  Transient events  Solar awareness

ESPM 14 Dublin 8-12 September 2014 Previous experience, limitations and advantages Ground-based telescopes: Wavelength range limited by Earth atmosphere absorption Radio observations (useful for instance to investigate flares/CMEs properties) not at the same resolution as optical observations (future: ALMA) Acquisition time interval severely limited by changes in seeing conditions Day/night constraints Higher angular resolution Possibility to repair, upgrade instruments Change of the target in real time Unique observations in the Hα line (patrol observations, but too low spatial resolution)

ESPM 14 Dublin 8-12 September 2014 Previous experience, limitations and advantages Satellite Instruments: Telemetry and data transfer limitation Effects of energetic particles emitted during solar explosive events Instruments: it is not possible to upgrade or repair Lost of satellite control (see, e.g. SOHO) Limited time interval of satellite observations ( y ?) Public release data Pipelines (for instance, Solar Software) almost immediately available Well organized data archives and repository

 EST and ATST-DKIST have the advantage of much higher data return, but are limited to their vantage points on the Sun-Earth line.  Depending on the orbital configuration, significant synergy can be achieved by combining Solar Orbiter’s remote-sensing data with either high-resolution and/or high-cadence co-spatial data from other observatories that provide additional spatial coverage  Authors who use high resolution GB data very often “like” to put them in a wider context and therefore use also Sat data  The opposite occurs less often (probably because an accessible archive does not yet exists or because the pipelines are not always available, but remember the SOLARNET goals and the work going on !!) Synergies, advantages of GB and Sat observations

Coordinated Observational Campaigns: A Challenge - Till now the target must be selected two days in advance: will it be possible to shorten this time interval ? - How about having the same time cadence in data acquisition ? - Flares issue

ESPM 14 Dublin 8-12 September 2014 The EST project is promoted by EAST (European Association for Solar Telescopes) The Design Phase has been financed by EC (29 partners: 14 scientific institutions and 15 industries) A new budget has been allocated to the EST-EAST community by EU: SOLARNET Synergies with ATST-DKIST, Solar Orbiter and other GB and Sat facilities are necessary in order to achieve a better knowledge of the Sun. EST website: SOLARNET website: Conclusions