Figure 1. Effect of Temperature and Humidity

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Welcome to Who Wants to be a Millionaire
第十一章 心 悸 《急诊医学》.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Math Expressions How does it all work together…?.
Ch. 6 – Thermal Energy I. Temperature and Energy Transfer Temperature
1 When you see… Find the zeros You think…. 2 To find the zeros...
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
Western Public Lands Grazing: The Real Costs Explore, enjoy and protect the planet Forest Guardians Jonathan Proctor.
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
CALENDAR.
Prime and Composite Numbers. These are numbers that have only two factors – themselves and one. These are numbers that have only two factors – themselves.
7 7 = = = = = = 3.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Summative Math Test Algebra (28%) Geometry (29%)
ASCII stands for American Standard Code for Information Interchange
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire? Year 3 What does it weigh?
I can interpret intervals on partially numbered scales and record readings accurately ? 15 ? 45 ? 25 ? 37 ? 53 ? 64 Each little mark.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
S T A N D A R D S AS/NZS :1994 Specifications for rainwater goods, accessories and fasteners Part 1: Metal shape or sheet rainwater.
Good Loading Practices Carrier Transicold and PLM Trailer Leasing.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Sl No Top-up Amount No Of Affiliate Ads Payment Per Day By Affiliate Ad Total Affiliate Ad Income 1.5,000/- Daily 2 ad for 100 days 100/- Affiliate.
The basics for simulations
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
Chapter 3 Supply and Demand. Chapter Objectives Define and explain demand in a product or service market Define and explain supply Determine the equilibrium.
CENSUS DATA 1.POPULATION Total population5.437 million9.856 million Female percentage Intercensal growth percentage Growth.
Look at This PowerPoint for help on you times tables
Thermal Elements Jake Blanchard Spring Thermal Elements These elements calculate temperatures in solids There are 1-D, 2-D, and 3-D elements All.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
2.5 Using Linear Models   Month Temp º F 70 º F 75 º F 78 º F.
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
A/C Final Project: Design Builder
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
When you see… Find the zeros You think….
Before Between After.
Equal or Not. Equal or Not
Slippery Slope
Numeracy Resources for KS2
Static Equilibrium; Elasticity and Fracture
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
Partial Products. Category 1 1 x 3-digit problems.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Conduction. Insulators Convection Thermometer Heat.
Presentation transcript:

Figure 1. Effect of Temperature and Humidity 20 25 30 35 40 45 50 75 100 Relative Humidity, % Danger high mortality High stress Moderate Comfort Cool Temperature, ° C Figure 1. Effect of Temperature and Humidity on Poultry Heat Stress 1

Convection and radiant heat Figure 2. Energy and Heat Flow in Poultry Convection and radiant heat Evaporation heat loss from respiration Radiant heat Energy in feed Water intake (temperature important) Growth Activity Metabolic heat Conduction heat loss to litter and concrete Excreta heat and energy (loss of bicarbonate and potassium 2

Respiration Rate (breaths/min) Figure 3. Effect of Respiration Rate and Time on Stress 6 5 NORMAL 4 High Stress Hours 3 Stress High Mortality 2 1 20 100 120 140 160 180 200 220 Respiration Rate (breaths/min) 3

Figure 4. Effect of Heat Stress on FCR in Broilers Time Temp RH days °C % FCR Exp 1 21-42 24 30 1.97 21-42 23-38 30-20 2.16 Exp 2 32-46 22 40 1.96 32-46 27-32 70-50 2.57 4

Figure 5. Economics of Heat Stress in Broilers Savings, heat stress vs normal temperature at various feed costs Average $53 $70.70 $88.38 $106 $124 50 100 150 200 250 300 350 Exp 1 $66 Exp 2 $182 $56 $47 $38 $28 $78 $104 $130 $156 Savings per 1,000 birds, $ Average Feed cost $/MT 5

Figure 6. Open Broiler House with Concrete Floor bird mesh White or reflective roof E N S 3 m min 35 °min W insulation 2.75 m grass bird mesh and roll down plastic curtains 1.75 m concrete floor 12 m max drain 6

Figure 7. Open Broiler House with Slat Floors bird mesh white or reflective roof E 3 m min N S 35 °min W insulation bamboo or wood slat floor with 2.5 cm solid and 1 cm open 2.75 m gap to prevent rat entry bird mesh and roll down plastic curtains 1.75 m 1.75 m 12 m max metal rat guards sloping earth drain cement footings treated timber supports stairs or ramp 7