Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
0 - 0.
Addition Facts
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Project Appraisal Module 5 Session 6.
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
Trail Bridges – A Common Sense Approach to Selecting Bridge Sites Presenter: James Scott Groenier, P.E. Project Leader, MTDC, WIT Prepared for: NOHVCC.
State Waters and Stream Buffers
THORNE GROUP Earthworks : Recycling : Reclamation : Demolition : Dismantling THORESBY LAKE PHASE 1 PRE-SUBSIDENCE WORKS Client: UK COALConsultant: Black.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Integrated Approach to Area Master Planning in Jubail Industrial City
Drystone Retaining Walls Presentation to Bridge Owners Forum at Kings College, Cambridge 13 May 2008.
1 © 2011 Regents of the University of Minnesota. All rights reserved. 11 A UNIVERSITY OF MINNESOTA EXTENSION LEECH LAKE BAND OF OJIBWE PARTNERSHIP SHIRLEY.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Week 1.
Project Management Requirements Prof. Ralph V. Locurcio, PE.
Columbus State Community College
© 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer.
Investigation of canal structures Session objectives –Spell out the purpose of CM & CD works –Describe the procedure for preparation of site survey plan.
Optimum Design in Rural Roads Introduction. Optimum Design in Rural Roads ….1 Introduction to topic: What is intended to be discussed? Optimum and/or.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Design of Open Channels and Culverts
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.
E4014 Construction Surveying Route Location Surveys Reconnaissance Survey Investigation Survey Working Survey Construction Survey.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Civil engineering branches & scopes
Highway Design Class CTC 440. Introductions Students Me.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Highway Route Surveys And Location
E4014 Construction Surveying Road Construction Plans.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
INFORMATION SYSTEM FOR RURAL ROAD NETWORK PLANNING – A CASE STUDY
بسم الله الرحمن الرحيم AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Evaluation, Design and Redesign Beit Wazan and.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
INTEGRATED DESIGN PROJECT BFC 43303
Geometric Design: General Concept CE331 Transportation Engineering.
Common Deficiencies observed in the Project Proposals received at NRRDA.
Impacts of Road Projects on Environment & Recommended Mitigation Measures. (Presented for Discussion) December, 2008 E.C; Fogera Woreda, Woreta Abraham.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
TRAFFIC STUDY AND FORECASTING SHRI DEVI POLYTECHINIC
Road Management System and Data Collection in Karnataka PWD Public Works Department Government of Karnataka By Dr. H.R.Shantharajanna Chief Information.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
AIRPORT SURVEYS.
Rural Access Programme Development through access (4C) Quality Management Plan Presentation for CPD Training Ramesh Khatakho Engineering Officer, Kalikot.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Rehabilitation Project
Investigation of Road Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Week 2: Water Conveyance
Highway Design Class CTC 440.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Walker Street Reconstruction Project 25% Design Public Hearing
Stream Crossing Replacement Policy
Presentation transcript:

PREPARATION AND SCRUTINY OF DETAILED PROJECT REPORTS AS PER NEW TEMPLATE Prof. B.P. Chandrasekhar Technical Advisor to APSRRDA GoAP

To present the details of Investigations, Design with choice of Technology, Assessment of accurate quantities and Cost Estimation along with necessary drawings to enable the execution of the Project. Objectives of DPR

Contents of the DPR 1.Introduction 2.Planning and basic design consideration 3.Topographic Survey. 4.Soil and Materials Survey 5.Traffic Survey 6.Hydrological Survey Contd.,

Contd. 7. Geometric Design Standards 8. Alignment Design 9.Pavement Design 10.Design of Cross Drainage 11.Protective Works & Drainage 12.Land Acquisition 13.Utility shifting/relocation

. Contd. 14.Road Safety and Traffic Management Management15.Specification 16.Environmental Issues 17.Analysis of Rates 18.Cost Estimate 19.Construction Program

B.Proformae Proforma BPackage Summary Proforma CCheck List for PIU & STA Format FlPackage-wise Summary Sheet Format F2ARoads proposed in PMGSY for Rural Connectivity Format F2BPavement Layers Format F3Typical Cross Section of Existing Pavement Format F4Typical proposed cross section in Straight Section - Flexible Pavement Format F5Summary: Cost Estimate Format F6Cost estimate for Road Construction Works - Pavement Works Format F7Cost estimate for Cross Drainage Works-Slab Culvert Format F8Rate of Materials supplied at site - Rate Analysis Format F9ACertificate of Ground Verification from Executive Engineer / Head of PIU Format F9BList of DPRs verified on Ground 14.Environmental Checklist 15.Checklist for community consultation on engineering

List of figures {Insert list of figures used in this report} Figure-1Road Map of India and state Figure-2District Map Figure-3Block Maps, showing all existing connectivity like District/block HQ, new townships, National and State highway network, mandis, hospitals, colleges, schools etc. Figure-4Strip plan showing land and alignment details Figure -5Quarry Map

D.Annexures {Insert list of Annexure provided in this report} Annexure-1Details of soil tests (Section 4.2) Annexure-2Detailed hydraulic calculation of all replaced and proposed new culverts (Section 6.7) Annexure-3Chainage-wise Cut/fill volume

STRIP PLAN

Site Photos Chainage 0.00km One arm of the tee-intersection facing New Raipur Chainage 0.00km Starting point of the alignment. The road is made of moorum. The initial section is a small village with mud and permanent housing Chainage 0.100km The existing moorum road is wide and has sufficient ROW. On the right hand side is the raised platform for cattle shelter during monsoon

Site Photos Chainage 0.225km Pipe culvert provided along canal forming a cross drainage structure. This is a very temporary measure with no side walls and broken edges Culvert at chainage 0.750km C/d structure with head wall but broken canal edge Chainage 1.000km Canal on both edges stops. The ROW narrows substantially. The surface condition deteriorates because of paddy field water

Road Design Brief SI. LocationIssueDesign Solutions 1Ch. 0.00km The proposed road is connecting New Raipur and Aarang the block HQ. The road starts with a Tee intersection. While New Raipur gets developed there will be substantial traffic using this road. Electricity poles are located along the alignment. The intersection needs to be developed properly for safety. The electricity poles need to relocated. 2 Ch to km The section has a pipe laid across the road without any head wall or foundation. This is for the water from the irrigation channels for cross flow. This causes soil erosion in the channel. Because of the pipe the alignment has been adjusted in skew. ^Proper cross drainage structure to be provided. The road has to be realigned. 3 Ch to km Because of the skew in channel alignment the road has been skewed. The channel walls have eroded due to flow of water. The alignment has to be readjusted. The channel walls need to be protected from erosion. 4 Ch to km Due to agricultural cultivation the road has only the c/w and no shoulders. Land acquisition/donation will be required to provide for c/w and shoulder. It also needs to be raised to avoid water logging.

Road Design Brief 5 Ch to km The foot track is different from the actual vehicle path provided. Curve needs to be properly designed. 7Ch km The culvert provided skews the alignment. The culvert has to be redesigned so that proper geometry can be provided to the alignment. ~ Draft Format for DPR 8 Ch to The cc pavement does not have any Proper shoulder to be provided km shoulder. This is very risky for vehicles on either side. crossing each other.It is necessary for the designers The road ends at the village and to assess the feasibility of the crosses the major irrigation canal on provision of bypass from ch. the other side of the village. The road 1.500km as desired by the width inside the village is not villagers

Objectives of Scrutiny To make sure of adequacy of investigations. To make sure of adequacy of investigations. To Check the authenticity of the data. To Check the authenticity of the data. To verify the optimality of design and estimation. To verify the optimality of design and estimation. To check the provisions made as per the PMGSY guidelines. To check the provisions made as per the PMGSY guidelines.

Important Factors for Scrutiny Selection of Alignment. Selection of Alignment. Land Availability. Land Availability. Traffic Volume. Traffic Volume. Soil Characteristics. Soil Characteristics. Design and Specification. Design and Specification. CD works. CD works. Drawings. Drawings.

DPR Scrutiny Process Stage 1- Executive Engineer. Stage 2- Superintending Engineer Stage 3- State Technical Agency (STA) Stage 4- Principal Technical Agency (PTA) (Random Check) Stage 5- Random Check at NRRDA

Scrutiny at DPIU Co-relation of the data during Transect Walk, Site investigations and that used in the DPR. Co-relation of the data during Transect Walk, Site investigations and that used in the DPR. Verification of leads and availability of material. Verification of leads and availability of material. Verification of specifications and Schedule of Rates. Verification of specifications and Schedule of Rates. Verification of Maps and Drawings prepared by Junior Staff. Verification of Maps and Drawings prepared by Junior Staff.

Mandatory Certificates 1.Resolution of Grama Sabha 2.Recommendation of Honble MPs 3.Certificate of Land availability 4.Certificate that the proposed road is not one of the dropped roads in the earlier proposals 5.Certificate that the road now proposed is not funded / proposed to be funded in any other programme