MONDAY 17 MARCH 2003 Haivan Pass Tunnel Construction Project CONSTRUCTION PROGRESS February 2003.
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
BOX PUSHING TECHNOLOGY
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
CDIO Approach for Real-Time Experiential Learning of Large Structures By Dr Tao Nengfu, Yoong Yuen Soo, Tan Poh Seng School of Architecture and the Built.
Theoretical solutions for NATM excavation in soft rock with non-hydrostatic in-situ stresses Nagasaki University Z. Guan Y. Jiang Y.Tanabasi 1. Philosophy.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Michael Swinford Bechtel International Project Director, Autostrada Transilvania Friday 22 nd October 2010 Albanian Motorway Project A New Direction.
 Location – Maneri to Uttarkashi, India  Length – 8.56km long, diameter 4.75m  Use – a power tunnel, part of the hydro-electric project on the River.
Tunnelling Methods.
GROUNDWATER CONTROL.
 Abandon the site and locate the structure elsewhere  Design deep foundations to carry the weight of the structure to competent stratum  Redesign the.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
Forecast 10 years - Underground Space Technology - USHIJIMA Kunio (Civil) NOMURA Mitsugu (Civil)
CONSTRUCTION.
Installation. Indoor Unit Installation Typical Installation.
GUD AFTNOON. SUBJECT CODE : GE1151 BASIC CIVIL AND MECHANICAL ENGINEERING.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
NATM NEW AUSTRIAN TUNNELING METHOD.
John Osborne GS/SE March 2013
Homebush Bay Rail Link l 700 lineal metres of precast concrete arch l 9 different profiles.8 x 2.5 to 19 x 8 l 900 units. l Reinforced soil with precast.
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Slop Stabilization Pertemuan
General meeting LAGUNA LAGUNA – Fréjus site
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Engineering Technology Division.
Department of Civil Engineering,
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
DESIGN FLEXIBLE AND RIGID PAVEMENTS Ms Ikmalzatul Abdullah.
City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
Scope of Engineering Geology. Def. This deals with the application of geological knowledge in the field of civil engineering, for excavation of safe,
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
200 kT Water Cherenkov Detector Vessel Liner 50% Conceptual Design Review.
Candidate: Chhatra B. Basnet Main Supervisor: Dr. Krishna K. Panthi (Department of Geology and Mineral Resources Engineering) Applicability of Unlined/Shotcrete.
Construction Beam Tunnel
Return Air Installation Return Air Installation. Installation Fundamentals Check the electrical service Room by room load calculation Select a matched.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
CAD-Architecture Inst: Mr. Johnston Logan High School
(Part 30, PP 2007, animation+p/r : short version compr.)
Concrete Repair.
Civil Design for Tunnel Case Studies
Innovative tunnel waterproofing technology
$150K Chicago/ANL seed funding for Braidwood site investigation
Tunnel Cross Section Studies
5th FCC Infrastructure & Operation meeting
Visit for more Learning Resources
Navigating FDOT Specifications and Standards
Minuteman Vocational Technical Regional High School Progress
Drill cuts used in underground mines
Diaphragm Wall Construction Long sections of the cut and cover use diaphragm walls to support the sides of the open excavation, while work on the.
Pier Foundations Piers Suspended floor Ground beam Next slide.
Earth and Rock fill Dams
Presentation transcript:

Haivan Pass Tunnel Construction Project

Table of Contents Concept of Tunneling with New Austrian Tunneling Method (NATM) Typical X-section Drawings Tunnel Construction at Haivan Pass Tunnel Construction Project

Concept of Tunneling with NATM The NATM was developed by Austrian engineers from 1957 – 1965 The principles of the method: The support is adequately stabilizing the surrounding ground, so that the rate of convergence towards the tunnel is perceived to be approaching an asymptotic value Where, after initial support, further support may be applied incrementally The essence of design of a system of incremental support is to understand the stress-strain properties of the ground and of the tunnel support Since controlled strain of the ground has to occur in order to develop a changed stress field in the ground aroun dthe tunnel compatible with the degree of support

Concept of Tunneling with NATM Difference of stress distribution around Tunnel

Concept of Tunneling with NATM Conventional tunneling method - Example of steel rib and lagging

Concept of Tunneling with NATM Image of ground arch effect of the NATM support

Concept of Tunneling with NATM Image of ground arch effect of the NATM support

Typical X-section Drawings Haivan Pass Tunnel Project MAIN TUNNEL EVA. TUNNEL Rockbolts Forepoling Shotcrete TUNNEL CONNECTION – SUPPORT SYSTEM Main Tunnel with Lay by and Pedestrian Cross Passage

Typical X-section Drawings Haivan Pass Tunnel Project Concrete lining MAIN TUNNEL– SUPPORT SYSTEM Tunnel center Road center Waterproof membrane Shotcrete Theoretical rock line Concrete curbing Electrical cable duct Tunnel side drain Filter cement aggregate Foundation beam for concrete lining Tunnel main sub drainage perforated

Tunnel Construction at Haivan Pass Tunnel Construction Project 1. Drilling tunnel face 2. Charging explosive 3. Excavating and mucking after blasting 4. Shotcreting, if necessary 5. Survey of section (installing steel rib, if necessary) 6. Installing wiremesh, if necessary 7-1. Installing rockbolts 7-2. Cutting head of rockbolts 7-3. Covering head of rockbolts 8. Concreting foundation beam 9. Constructing drain pipe 10. Fixing geotextile 11. Installing waterproofing membrane 12. Lining concrete

Technical Term of NATM in the Project Rockbolt Steel rib Wiremesh + Shotcrete Geotextile Waterproofing membrane Mole drain pipe Lining concrete Foundation beam

Work Sequence of NATM (1/12) 1. Drilling tunnel face

Work Sequence of NATM (2/12) 2. Charging explosive

Work Sequence of NATM (3/12) 3. Excavating and Mucking after blasting

Work Sequence of NATM (4/12) 4. Shotcreting

Work Sequence of NATM (5/12) 5. Survey of section

Work Sequence of NATM (6/12) 6. Installing wiremesh

Work Sequence of NATM (7/12) 7-1. Installing rockbolts

Work Sequence of NATM (7/12) 7-2. Cutting head of rockbolts

Work Sequence of NATM (7/12) 7-3. Covering head of rockbolts by geotextile

Work Sequence of NATM (8/12) 8. Concreting foundation beam

Work Sequence of NATM (9/12) 9. Constructing drain pipe

Work Sequence of NATM (10/12) 10. Fixing geotextile

Work Sequence of NATM (11/12) 11. Installing waterproofing membrane

Work Sequence of NATM (12/12) 12. Lining concrete

Conclusion Hoping that this Presentation will be of some help toward better implementation of the Project Project’s homepage: http://haivan.cup.com For further information, contact Consultant Team at email: hvt-com@dng.vnn.vn