05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started.

Slides:



Advertisements
Similar presentations
Cedar Property Management (509) Bedroom / 2 Bath 1240 Sq. Ft. Floor Plan Areas of Interest (#1) Hall BathHall.
Advertisements

Brigham Young University. Deseret Towers 1800 bed-spaces Seven seven-story board and room style halls Built in 1960s and early 1970s Demolition in two.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
Hospital of the Future Construction Update as of Dec. 3, 2010.
USING MS PROJECT Project management software programs such as Microsoft Project can be used to compute the earliest and latest start and finish times and.
1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
West Wall Compressor Requirements West Wall Mezzanine Move compressors to the West Wall to distance from magnetic field Find compressor position on West.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Think of the parallel lines being the walls of a building, and the transversal is a firewall through the building, and a door in the firewall.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.
BCT 102 Residential Printreading
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
House Design Project Overview What each student must accomplish – 10 journals: date, time, weather, and what was accomplished or learned – Bubble drawings.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
-Herbert Olsen- Improving Facility Efficiency. Solar Panels.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Building Plans.
Julius West Middle School Construction Updates
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Agenda 10/6/11 Objective: Identify Electrical symbols Learn how to draw basic floor plans and elevations Agenda Quiz on Symbols Lecture on basic floor.
DIL-009 Phasing Plan TASKS START END CONSTRUCTION (7 weeks) 02/07/11 04/01/11 PHASE 1: BACKROOM AND GROCERY (2 WKS) 2/7/11PM2/18/11AM.
Elevations McMillan Villas May 30th 2015.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
Solar Energy Home Tour A preview to our local field trip.
ASSIGNMENT. Luanda, Angola Latitude: 8° 50' 18 S Longitude: 13° 14' 4 E.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
 Where the family sleeps, rests, and bathes  Takes up about 1/3 of the house  Should be in the quietest part of the house  Should be on the south.
Photo Tour of Building an Earthship 11 Sep 1999 – 2 Nov 2011 Section 1.2 by Ron and Joy Oliver.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Cupid Shuffle.  Everyone find a line on the floor and face the stage.  Now put your arms stretched out to your sides, you should not be able to touch.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Construction and Transportation Update Bayside Demo: ▸ Cut and capped utilities ▸ Demolished appendage building on the waterfront ▸ Demolition continues,
White Pigeon Community Schools
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Tucson Amateur Astronomy Association
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
3.2- Angles formed by parallel lines and transversals
Assembly And Installation Of Ikea Kitchen Cabinets
Capital Improvements Presentation
WORKSITE PREP AND THE DECON
August 28, 2018.
Minuteman Vocational Technical Regional High School Progress
2007 Bond Issue Capital Improvement Program
3.2- Angles formed by parallel lines and transversals
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
North Augusta High School – Phase 2A and 2B
Minuteman Vocational Technical Regional High School Progress
Properties of parallel lines cut by a transversal
Presentation transcript:

05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started

05/07/12 – 5/13/12 Demolition at 1927 wing nearing completion

05/07/12 – 5/13/12 Phase 1 Air Handler Units removed

Field Measured Phase 3 Rotunda Completed Electrical Shutdown to relocate Main Electrical Panel Exterior Complete drilled piers Form and Pour Footings at South Side Interior Continue with MEP in 1927 Wing Prep for floor cut at main electrical room Wall off existing area at Spartan Grille to facilitate Taco Bell/C-Store Relocation During the break… NEXT WEEK LOOK AHEAD Phase 3 Rotunda Field Measurement and Verification 05/07/12 – 5/13/12