PAST, PRESENT AND FUTURE Jason Smith, TERA Environmental Consultants February 20, 2014 Simon Fraser University.

Slides:



Advertisements
Similar presentations
Public Scoping Meeting December 3, 2012
Advertisements

SECTOR: Energy Sector COMPANY: Western Refining Inc.
Status report on Oil Infrastructure post Hurricanes A presentation by Leigh Phillips Biehl & Co., L.P.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
1 Transport and Station Observations and Recommendations January 26, 2005 TOMA – Diesel Fuel Marketers Seminar Nashville, TN TRANSPORTATION OF ULSD MAP.
Flow Line Regulations 18 AAC
Trans Mountain Expansion Project Pacific States/British Columbia Oil Spill Task Force Annual Meeting September 25, 2013 Michael Davies, Senior Director.
Watco Companies Overview January 25, 2013 Southwestern Rail Conference
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Mojave Water Agency: How we are trying to avoid our own liquidity crisis Kirby Brill General Manager, Mojave Water Agency Business Development Association.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
2014 Industry Outlook Forum Cook Inlet Energy, LLC Operational Update.
VALUE ENGINEERING Mohammed A. Us Shan Saleh H. Al-Mutairi Sagar M. Al-Anazi Samir A. Sulaiman Saleh S. Al-Abbas REFINERY FACILITY.
- CatchNET System was constructed in Used 6 times since Runaway CatchNET System will bring you safely to a stop similar to an aircraft.
Operating for over 30 years
Annual Conference, Toronto Ontario NOVEMBER 17, 2008 Canadian Association of Movers TONY BIANCO National Account Manager.
Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
Methow Valley Irrigation District Alternatives Evaluation Presented by Bob Montgomery, P.E. and David Rice, P.E. January 31, 2013.
Steve Baker President Natural Gas in Ontarios Energy Mix Seeing The Bigger Picture.
“Exemplary Environmental Emergency Management through Leadership, Organization, Team Work, and Shared Responsibility.” Good morning - acknowledge Sara.
WORLD-CLASS TANKER SAFETY SYSTEM
Responsible Resource Development April 17, Context Government focussed on responsible development of Canada’s natural resources to create jobs and.
NGEAO – Tulsa Meeting July HFC - A Pure Play Competitive Refinery 4 Woods Cross, UT Artesia, NM Cheyenne, WY El Dorado, KS Tulsa, OK.
Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
Part of Wilhelmsen Maritime Services a Wilh. Wilhelmsen group company OFFSHORE AND ENERGY Your preferred Offshore and Energy Partner CAPABILITY PRESENTATION.
START UP OF A SMALL REFINERY TO PROCESS EAGLE FORD PRODUCTION
The Great Eastern Shipping Company Limited Corporate Presentation & Financial Announcement FY May 2001.
Idaho/Canada Border Issues Transportation Border Working Group Meeting Coeur d’Alene, ID April 22-23, 2008.
Pipeline options for Canadian crude oil to the US Gulf Coast Presentation to the Wyoming Pipeline Authority October 24, 2006 Casper, WY.
RRT/NWAC Idaho Meeting – May 30, 2012 Presented by Dale Jensen Program Manager WA State Dept of Ecology Spill Prevention, Preparedness & Response Program.
Rail is making a difference in domestic crude growth Grand Forks, ND BNSF Railway Matthew K. Rose Chairman and Chief Executive Officer September 18, 2013.
Book 2: Chapter 2 Economic Planning for New Pipelines.
Managing the Environmental Challenge 1 Gateway to Asia Conference November 2014.
Intermodal Transportation and Terminal Operations Transportation Logistics Spring 2008.
Passenger Rail Discussion Group April 17, 2012 Seattle, Washington Cross Border Passenger Rail: A Canadian Perspective.
Physical Flow: From Oil Field to Gas Pump. To obtain the oil we use, hundreds of billions of dollars worth of infrastructure are necessary.
Alberta’s Industrial Heartland Overview Industrial Railway Safety Conference – April 28 th, 2015.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
1 Oil & Gas Market and Core Operations Overview Oil & Gas Market and Core Operations Overview Ram Mistry M (214)
California Transportation Fuel Trends in Historical Demand Joint Lead Commissioner Workshop on Transportation Energy Demand Forecasts June 24, 2015 Gordon.
Trans-Alaskan Pipeline Private Industry’s Most Expensive Undertaking.
Dr. Fatma Ashour. After the preliminary oil-field refining, the crude oil is transported to the refinery. The most common methods of transportation are.
Imported Liquified Natural Gas and its Role in Energy Independence Samuel Brown.
Risk Management Strategy For Large Scale Petroleum Operations In Orkney and Scotland Captain Graeme R Smith.
TOWARD EFFECTIVE OIL SPILL RESPONSE IN THE BULGARIAN SEA SPACES AND IN BLACK SEA REGION AS A WHOLE SPEAKER capt. Zhivko Petrov - Director of Directorate.
1 Ethanol Transportation & Distribution Governors Ethanol Coalition Mike Mears Senior Vice President
CALIFORNIA ENERGY COMMISSION Alaska Crude Oil Disruption Staff Update California Energy Commission Fuels and Transportation Division Gordon Schremp August.
GROUP MEMBERS: HESHAM AL-IKHWAN DANIEL LEON ZEYNEP OZCAN ALBERTO PEREZ AYE AYE PWINT.
The TERMPOL Review Process RDIMS# Presentation Outline  What is TERMPOL?  The Purpose of TERMPOL  How TERMPOL Works  Benefits of TERMPOL 
Allied African Co. Ltd.  We are bulk bitumen traders mainly the bulk bitumen.  Head office is located in Khartoum – Sudan.  Our bulk bitumen terminal.
Petroleum Products in Western Canada. Western Canada Refining Esso, Shell, PetroCanada in Edmonton – 400 Mbd ChevronTexaco in Vancouver – 50 Mbd Husky.
Agenda... Overview: Tom Barrett, Alyeska President – What happened: Winter shutdown – extraordinary response – What we are doing… Reviewing pipeline reliability.
Tug Escort Work Group Commented on and worked with a state senator’s staff on proposed state legislation that would require tug escorts for chemical tankers,
Philadelphia’s LNG Controversy Samantha Linton ES 333 December 6, 2005.
Main Channel Columbia River Channel is filled in to an unknown level with debris & sediment to mile 18 and maybe more. The Columbia River Jetty’s have.
MONTANA COHN, BRENT DEBAUCH, JASON BENAM Keystone XL Pipeline and Indigenous People.
BP Holdings. Kinder Morgan and BP North America Enter into Long-Term Agreements Kinder Morgan Energy Partners, L.P. (NYSE: KMP) and BP North America (NYSE:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
IRAQ’s OIL POLICY (2008 – 2017) Presented by: ENG. AHMED ALSHAMMA Deputy Oil Minister IRAQ.
March 31, 2016 Area Transportation Partnership Fergus Falls, MN.
California Refinery Overview and Fuel Use Transportation Fuel Supply Reliability Due to Reduced Natural Gas Availability San Pedro, CA June 17, 2016 Gordon.
European Energy Southern Gas Corridor to Europe
Physical Flow: From Oil Field to Gas Pump
TOWARD EFFECTIVE OIL SPILL RESPONSE IN THE BULGARIAN SEA
The Proposed Trans Mountain Pipeline
Transportation of oil BY DR. GHULAM ABBAS.
Transportation of oil BY DR. GHULAM ABBAS.
March 31, 2016 Area Transportation Partnership Fergus Falls, MN
Presentation transcript:

PAST, PRESENT AND FUTURE Jason Smith, TERA Environmental Consultants February 20, 2014 Simon Fraser University

Trans Mountain Pipeline – 60 Years of History 2/20/2014

Jasper National Park /20/2014

Trans Mountain – West Coast Connected 2/20/2014

TRANS MOUNTAIN PIPELINE - PRESENT - 2/20/2014

Supply Current capacity 47.7 million litres or 300,000 barrels capacity per day Equivalent to a tanker truck leaving Edmonton for Vancouver every minute Ability to transport multiple products in batches up to 350 km long travelling at 5 km/hr: X 1,400 34,000 litres 2/20/2014

Tanker Volumes 2/20/2014

TMPL Throughput /20/2014

TMPL Throughput /20/2014

Pipeline Terminus Main pipeline from Edmonton ends at Burnaby Terminal –Short-term storage of crude oil and refined products –Distribution point for refined products to Suncor and Imperial Oil and crude oil to Chevron Refinery and Westridge Marine Terminal 2/20/2014

Safe Marine Operations Since 1956, vessels from our Westridge Marine Terminal have been transporting petroleum products safely through Port Metro Vancouver without a single spill from a tanker Facilities designed and operated to meet Canada Shipping Act, National Energy Board and Transport Canada requirements Westridge-specific Western Canadian Marine Response Corporation (WCMRC) spill response plan 2/20/2014

TMX ANCHOR LOOP Anchor Loop 158 km of new 30”/36” pipe through Jasper and Mount Robson parks In service Nov 2008 Added 40,000 bpd capacity (300 kbpd) 2/20/2014

Yellowhead Pass National Historic Site of Canada National Historic Site 2/20/2014

Wildlife Relocation 2/20/2014

Environmental Protection Plans 2/20/2014

Sucker Creek 2/20/2014

Sucker Creek 2/20/2014

Restoration 2/20/2014

Benefits to Parks No future pipelines Automate main line block valves Restored old Borrow / Gravel Pits Removed culverts and barriers to movement and install singled span bridges Legacy Fund 2/20/2014

TRANS MOUNTAIN EXPANSION PROJECT – FUTURE - 2/20/2014

Proposed Scope of Expansion Project Announced in 2012, Facilities Application filed to NEB in December 2013 Based on revised 15- and 20-year commitments from shippers to use the line The proposed expansion to increase capacity to 890,000 barrels per day Projected capital cost is approximately $5.4 billion 2/20/2014

Proposed Scope of Expansion Project Result: a dual-line operation – twinned pipeline (approximately 980 km of new pipeline) with: –Existing line for lighter products –The proposed new line for heavier oils 36-inch pipeline diameter 12 new pump stations at 11 locations 2/20/2014

Proposed Scope of Expansion project Estimated 20 new storage tanks at existing facilities in Edmonton, Sumas and Burnaby One new dock complex with three berths each capable of loading Aframax-size tankers at the Westridge Marine Terminal 2/20/2014

Marine Traffic 2/20/2014

Marine Safety Enhancements In its Facilities Application, Trans Mountain has recommended a number of enhancements to marine safety and spill response including: Extending tug escorts Implementing a Moving Safety Zone around laden tankers Improvements to the oil spill response regime 2/20/2014

Trans Mountain Expansion Schedule 2/20/2014

Thank You 2/20/2014