1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN 09.08.2011.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Repaso: Unidad 1 Lección 2
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
1. PHOTO INDEX Bayside: Page 5-7 Other Colour Leon: Page 8-10 Cabrera Page Canaria Page Driftwood Page 16 Florence Florence and Corfu Page.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN

2 The goal of design: To provide maintenance and services works of EB / EE / ES / HB / PP1 / PIXEL / TK (from Tracker Bulkhead to 11m); To provide maintenance and services works of EB / EE / ES / HB / PP1 / PIXEL / TK (from Tracker Bulkhead to 11m); To provide safe access to all central subdetectors; To provide safe access to all central subdetectors; The set tooling & radiation shielding should provide full compatibilities with all activities; The set tooling & radiation shielding should provide full compatibilities with all activities; We try to use present equipment from P5 (main platform, “gasprom” platform, yellow structures, EB platform with “enfourneur” We try to use present equipment from P5 (main platform, “gasprom” platform, yellow structures, EB platform with “enfourneur”

3

4 EB MAINTENANCE (super module reinstallation)

5 EB PLATFORM MODIFICATION

6 EB TOOLING INSTALLATION

7 EB platform/VT cable treys conflict

8 EB platform/VT cable trays conflict

9 EB SUPER MODULE REINSTALLATION

10

11 TK/BP shielding interface

12 Bulkhead & BP shielding

13 Shielding support fix onto PP1

14 Shielding support fix onto PP1

15 BP & forward shielding

16 BP shielding in open position

17 Radiation shielding & supports system (EB/HB/ES/EE maintenance)

18 Bulkhead shielding & support installation onto PP1

19 Shielding/BP interface

20 Front shielding disk with support installation

21 Tooling for support & shielding installation

22

23

24 Temporary bar installation

25 Temporary bar removed

26 Shielding support installation onto PP1

27 Shielding support installation onto PP1

28 Stair-platform & special scaffolding compatibility

29 Star-platform & special scaffolding compatibility

30 Winch system for counter weight stroke

31 Tooling for Support & shielding installation

32 Counterweight remove

33 BP shielding installation

34 BP shielding installation (step by step)

35 Back shielding installation

36 BP temporary support installation

37 Shield seismic load stabilization

38 Shield seismic load stabilization

39 HB/EB/ES/EE maintenance

40 HB/TK/PP1 zone maintenance

41 Radiation shielding & supports system (EB/HB/PP1 maintenance)

42 BP shielding installation

43

44 PIXEL/ES/EE maintenance

45 PIXEL REINSTALLATION (LAYOUT)