1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN
2 The goal of design: To provide maintenance and services works of EB / EE / ES / HB / PP1 / PIXEL / TK (from Tracker Bulkhead to 11m); To provide maintenance and services works of EB / EE / ES / HB / PP1 / PIXEL / TK (from Tracker Bulkhead to 11m); To provide safe access to all central subdetectors; To provide safe access to all central subdetectors; The set tooling & radiation shielding should provide full compatibilities with all activities; The set tooling & radiation shielding should provide full compatibilities with all activities; We try to use present equipment from P5 (main platform, “gasprom” platform, yellow structures, EB platform with “enfourneur” We try to use present equipment from P5 (main platform, “gasprom” platform, yellow structures, EB platform with “enfourneur”
3
4 EB MAINTENANCE (super module reinstallation)
5 EB PLATFORM MODIFICATION
6 EB TOOLING INSTALLATION
7 EB platform/VT cable treys conflict
8 EB platform/VT cable trays conflict
9 EB SUPER MODULE REINSTALLATION
10
11 TK/BP shielding interface
12 Bulkhead & BP shielding
13 Shielding support fix onto PP1
14 Shielding support fix onto PP1
15 BP & forward shielding
16 BP shielding in open position
17 Radiation shielding & supports system (EB/HB/ES/EE maintenance)
18 Bulkhead shielding & support installation onto PP1
19 Shielding/BP interface
20 Front shielding disk with support installation
21 Tooling for support & shielding installation
22
23
24 Temporary bar installation
25 Temporary bar removed
26 Shielding support installation onto PP1
27 Shielding support installation onto PP1
28 Stair-platform & special scaffolding compatibility
29 Star-platform & special scaffolding compatibility
30 Winch system for counter weight stroke
31 Tooling for Support & shielding installation
32 Counterweight remove
33 BP shielding installation
34 BP shielding installation (step by step)
35 Back shielding installation
36 BP temporary support installation
37 Shield seismic load stabilization
38 Shield seismic load stabilization
39 HB/EB/ES/EE maintenance
40 HB/TK/PP1 zone maintenance
41 Radiation shielding & supports system (EB/HB/PP1 maintenance)
42 BP shielding installation
43
44 PIXEL/ES/EE maintenance
45 PIXEL REINSTALLATION (LAYOUT)