RES Americas Kansas Wind and Renewable Energy Conference 2008.

Slides:



Advertisements
Similar presentations
A New Model For Solar Manufacturing Roger G. Little Spire Corporation.
Advertisements

Dokumentname > Folie 1 > Vortrag > Autor Potentials for Renewables in Europe Wolfram Krewitt DLR Institute of Technical Thermodynamics Systems.
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Scottsdale, Arizona May.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Technical & Economic Assessment Grid, Mini-grid & Off-grid Electrification Technologies Chubu Electric Power Co.,Inc. (CEPCO) Toyo Engineering Co. (TOYO)
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
Community Wind Development
1 Energy Efficiency and Iowa Utilities Presentation to the Energy Policy Advisory Forum, convened by Governor-Elect Chet Culver January 4, 2007 Presented.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Solar Water Heating as a Green House Gas Reduction and Energy Conservation Strategy Florida Solar Energy Industries Association and Florida Solar Energy.
1 Overview of Wind and State Policy in Colorado Colorado Wind Forum October 8, 2013.
Water Utility Business Applications. 2 Agenda Industry overview and trends Our application visionary solution Business values Wireless network components.
RENEWABLE ENERGY 29/03/2012 Green Industries, Department of Trade and Industry.
An Introduction ppt - Saurabh Mehta
Forth Estuary Forum 28th Nov 2013
POTOMAC WIND ENERGY Presents: Small Wind Turbines for residential and business use. May 2008.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
Lessons from community energy projects in Wales A brief overview Matthew Leese 1.
html.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
VALMONT WIND ENERGY, INC. MODULAR TOWER SYSTEMS. Presentation Overview Bigger Machines Modular Tower Systems (MTS) Transportation Restrictions Flexible.
Power Generation In Singapore Presented By CHAN Y K Commercial Specialist Commercial Service, Singapore.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Wind Power. Approximately 2% of the solar power that reaches the earth’s surface is converted into wind. Approximately 2% of the solar power that reaches.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Potential Impacts of an Advanced Energy Portfolio Standard in Pennsylvania Ryan Pletka, P.E. Black & Veatch April 12, 2004 Supported by: Heinz Endowments.
1 Renewable Energy in the Northwest: Wind Energy Presented By Stephen C. Hall STOEL RIVES LLP Journal of Environmental Law and Litigation Symposium University.
Agenda  Surging wind industry  Land-based wind in Maryland  Offshore wind  Policies – federal and state  MD’s Climate Action Plan  40% clean electricity.
WIND ENERGY CAMI GHANBARABBASI, KRISTEN RUNDSTEIN AND RACHEL STEINER.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
Small Farm Profitability: Is Wind Energy the Answer? 1
US Renewable Energy Markets: Financial Perspective By Michael D. Ware Advance Capital Markets, Inc. Washington Council of Governments Washington, DC June.
Real Implications of Alternative Energy Sources for Communities WCCMA 2008 Summer Conference Roger Garratt Director, Resource Acquisition & Emerging Technologies.
Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart.
Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas.
Powering Wolverine’s Renewable Future Presented to Great Lakes Regional Wind Institute Detroit, Michigan by John P. Miceli, Energy Market Analyst March.
Small Scale Wind Energy. Capacity factor The net capacity factor of a power plant is the ratio of the actual output of a power plant over a period of.
Lorelei H. Oviatt, AICP Director Kern County Planning And Community Development Department August.
Wind Power Jon Konen April 7, 2008 CBE 555 Presentation.
CONFIDENTIAL AND PROPRIETARY Invenergy’s Views on Cogeneration Opportunities Presented to: April 30, 2015.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois A Strong Beginning for Illinois Wind Robert Nagel
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
A Status Report on Wind Energy Opportunities in Canada Robert Hornung, CanWEA EWEA Conference March 2, Athens.
Wind Energy. Why Renewable Energy? o Clean, zero emissions o NOx, SO2, CO, CO2 o Air quality, water quality o Climate Change o Reduce fossil fuel dependence.
Supply Opportunities in Canada’s Wind Energy Market Stephen Rach CanWEA Toronto, Ontario October 6, 2010.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
Solar and Wind Energy September 19, 2012 NC DOR Michael Brown Dave Duty.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
An Overview of the Technology and Economics of Offshore Wind Farms
Biomass Cogeneration Facility Savannah River Site Aiken, SC
In 2014, the average levelized price of signed wind power purchase agreements was about 2.35 cents per kilowatt-hour. This price is cost competitive with.
Energy and Environmental Policy Renewable Energy: Wind Presented by: Adam Smith Damien Hammond Veera Kondapi Jeff Gruppo.
Bartosz Turek.  History of Wind Power  The Trend for the Future  Types of Turbines  Pros and Cons of Wind Power  Intermittency  Storage Options.
Welcome to Cedar Ridge Wind Farm Alliant Energy’s first fully owned-and-operated wind facility.
Berkshire Wind: Joint Action By Communities with Common Goals Presented by: David Tuohey, Director of Communications & External Affairs Massachusetts Municipal.
Presented to: Wisconsin Industrial Energy Group Board of Directors May 8, 2008 Alliant Energy Generation Update.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
Dr. Robert K. Dixon June 2017.
YEL WIND POWER PROJECT. YEL WIND POWER PROJECT.
Community Wind Development
Renewable Energy Markets
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Wind Development & Policy Options
Presentation transcript:

RES Americas Kansas Wind and Renewable Energy Conference 2008

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 1 RES Americas Inc Organization RES Americas is primarily a leading Wind Energy Company but is moving into other renewable fields Established Broomfield, CO office as Corporate Headquarters Development Technical, Resource Assessment Construction

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 2 History of RES Americas RES Americas’ U.S. construction surpasses 1,000 MW RES Americas began developing projects for ownership RES Americas’ U.S. construction surpasses 3,000 MW Commercial operations of RES Americas’ first owned project, Whirlwind, in the U.S. RES constructs its first project Renewable Energy Systems Limited founded by Sir Robert McAlpine RES Americas constructs its first U.S. project The RES Group has a long history in wind technology development RES Americas takes projects from conception - leasing land, acquiring transmission rights and setting up Power Contracts with Utilities RES Americas is currently constructing approximately 1,400 MW, representing more than 30% of the wind capacity currently under construction in the U.S. and will have constructed approximately 3,500MW by the end of RES Americas co- developed and constructed the 278 MW King Mountain Wind Ranch, the largest wind project in the world at the time it was constructed

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 3 Wind Power Industry Overview Between 2007 and 2030, electricity demand in the U.S. and Canada is expected to increase approximately 30% Significant portion will be met with renewables PTCs Accelerated tax depreciation State / provincial policies and wind energy incentives −Renewable Portfolio Standards (“RPS”) Renewable energy is expected to capture a significant portion of the electricity sector Wind energy incentives Wind expected to represent 7% of U.S. capacity by 2015 Cumulative capacity of 57,000 MW by 2015 RES currently has over 600 MW in various stages of development in Kansas Wind energy is the future of renewable power generation Through 2012, natural gas prices are forecast to remain in the $8-$12/mmbtu range, keeping wind cost-competitive with gas-fired electricity generation in many state electricity markets Increasing cost of traditional fuels Focus on greenhouse gas emissions in both the U.S. and Canada has further prompted the growth in renewable generation Greenhouse gas considerations

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 4 North American Wind Opportunity North American Installed Wind Capacity Growth Source:EER, Nov (in MW)

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 5 Emerging Renewables RES is using wind power expertise to develop and construct projects that generate power using solar thermal, solar PV, and biomass Also interested in energy storage, though this is still a developing field. Focused on utility-scale, grid- connected projects. RES is leveraging existing land positions, interconnection agreements, and relationships with utilities Solar PV can generate power almost anywhere – but it’s still expensive Solar thermal is less expensive – but requires the direct sunlight found in the Southwest US Ausra CLFR

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 6 RES Americas Inc Construction U.S. Business Constructed - 20 Projects in US = 2,060 MW; 1999 – 2007 Under Construction - 12 Projects = 1,480 MW Construction Activities Wind Farm Design Civil and Electrical Design Procurement Civil, Electrical, Mechanical Construction Construction Management Turbine Procurement

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 7 Central Plains Wind Farm Size:99 MW Location:Wichita County, Kansas Developer:RES Americas Ownership:Westar Contract Type:EPC Construction Start:April 2008 Substantial Completion:December 2008 Turbine Technology:33 Vestas V MW Interconnection Voltage:115 kV Total Length of New Road:7 miles Total Length of Collector System: 19 miles

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 8 Central Plains Wind Farm – The Beginning The project was originally scheduled to be constructed in 2003 and then 2004 Resurrected as Central Plains Wind Farm. Construction began in April, 2008 Wichita Economic Development, Inc. Wheatland Electric Coop Sunflower Electric Power Corp. Local source for road base material Kansas civil contractor for roads construction Kansas contractor to construct O&M Building

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 9 Central Plains Wind Farm - Roads Oakley, KS roads contractor 6.7 miles of roads, 20 foot wide with 8 foot shoulders Roads built from crushed base material over a Geotextile fabric Roads completed in July Extensive testing on sub-grade and road base. Shoulders are tested for bearing capacity Crane pads designed and tested for the specific loads encountered during lifts.

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 10 Central Plains Wind Farm - Foundations 55 foot octagonal spread foot 11 foot total height Approximately 410 cubic yards of concrete per foundation Approximately 80,000 pounds of rebar per foundation Total foundation weight is over 1,600,000 pounds Foundations are designed internally Design is specific to turbine and site conditions

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 11 Central Plains Wind Farm - Electrical Power is transmitted from the turbines to the substation at 34,500 volts Over 19 miles of underground cable All turbines, substation and O&M building connected by fiber optics Collection system nearing completion Substation transformer steps up the 34,500 volts to 115,000 volts for connection to the transmission line Metering and system protection take place in the project substation Substation scheduled for to be energized on October 20th

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 12 Central Plains Wind Farm - Turbines Vestas V90, 3 Megawatt turbines Tower is 80 meters, 262 feet, tall and weighs over 370, 000 pounds Each blade is 44 meters, 144 feet, long and weighs over 14,000 pounds The nacelle and hub weigh over 175,000 pounds Total weight of turbine is approximately 600,000 pounds Wind farm will produce enough power for approximately 35,000 homes

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 13 Central Plains Wind Farm - Turbines The crane used will have a track length of 38 feet, width of 34 feet and a boom height of 320 feet The assembled crane will weigh about 1.2 million pounds The crane will be transported to the site on over 20 tractor trailers. The major components will be shipped from the port to Kansas by rail First tower section will be erected by the second week in October. The blades will be installed one at a time, single blade erection First turbine will be completely erected by the end of October Project will reach Substantial Completion before the end of December

DO NOT DELETE!! – FOR PRESTECH USE ONLY – \RD PRES TECH\Jobs\IBD Client\ECCC\XCHRME\Chang, Fei\RES Custom PPT\ 14 RES Americas