Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.

Slides:



Advertisements
Similar presentations
Tutorial 3 Refractor assignment, Analysis, Modeling and Statics
Advertisements

Pivot Tables. What are Pivot Tables? A pivot table gives you a way to group, summarize and compare data from a spreadsheet You can do some of the same.
Boulder, Colorado USA May, 2004
Sequencing Mining Operations with MineSight® ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Mrs. Navickas Algebraically: 1 Solve for y, if necessary. If equation is given equal to zero or a y is not present, rewrite in descending powers of x.
1 Transportation Model. 2 Basic Problem The basic idea in a transportation problem is that there are sites or sources of product that need to be shipped.
How to Set Up a Processing Plan in MSOPIT’s Economics Panel.
Corporate Property Automated Information System (CPAIS) Macro Walkthrough Guide for Excel Version 2003.
MineSight VALP Optimizing Cut-Off Grades © 2012 Dr. B. C. Paul Note – MineSight and VALP are both trademarked names belonging to Mintec Inc. These slides.
An Example of Drawing Hard Rock Room and Pillar in MineSight ©2012 Dr. B. C. Paul Note – The screen shots in these slides come from the program MineSight.
Roads in MineSight.
Surface Mining Ore Deposit Grades ©2011 Dr. B. C. Paul Note- The information contained in these slides is considered common knowledge to those schooled.
An Introduction to MS Reserve
E.1 Eclipse. e.2 Installing Eclipse Download the eclipse.installation.exe from the course web site to your computer and execute it. Keep the destination.
1 Session-I & II CSIT-121 Spring 2006 Session Targets Introducing the VC++.NET Solving problems on computer Programming in C++ Writing and Running Programs.
Simulation of Created Design Documentation on the simulation process of a basic injector-separation channel model design.
Inventory Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic or Figure.
1Allocating Expenses. Create Report Header Page To access this screen, click on ‘New Expense Report’ from your Expense Module Tab This page will come.
2008 Sr. Design Project ©Jan 2008 Dr. B. C. Paul Plans were made by the Author. MineSight® is proprietary software of Mintec Inc., Maps are taken from.
Lecture 11 Optimizing Cut-Off Grade Strategy
GPS Surveying ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides may.
Working with Numbers in Alice - Converting to integers and to strings - Rounding numbers. - Truncating Numbers Samantha Huerta under the direction of Professor.
05/09/ Introducing Visual Basic Sequence Programming.
Adding Roads and Benches To A Pit Design ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
by Chris Brown under Prof. Susan Rodger Duke University June 2012
REVISED 2/07 TH MLXchange SEARCH SETTINGS AND FLASHES Log on to MLXchange and select Search from the tabs along the top. The default search page will.
Using Statistical Interpolation to Build Block Models – Part I (Introduction to MineSight® and importing and creating surfaces) Using MineSight® ©2007.
Computer Aided Design of an Open Pit ©2007 Dr. B. C. Paul.
Sequencing Mining Operations with MineSight®
Intro to C++. Getting Started with Microsoft Visual Studios Open Microsoft Visual Studios 2010 Click on file Click on New Project Choose Visual C++ on.
Month End/Year End Procedures VENTUS Presenter: Linda Kennedy.
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
CAD3D Project. SketchUp - Project Create a new SketchUp project called InitialsXX where the XX are your first and last initial. Use the Rectangle tool.
Obtaining Information From the Geologic Block Model
Nonvisual Arrays and Recursion by Chris Brown under Prof. Susan Rodger Duke University June 2012.
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
GUI development with Matlab: GUI Front Panel Components 1 GUI front panel components In this section, we will look at -GUI front panel components -Programming.
Building Economics. In this Example we Start With Western Mine Cost Service Models.
Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Forms and Server Side Includes. What are Forms? Forms are used to get user input We’ve all used them before. For example, ever had to sign up for courses.
Click your mouse for next slide Dreamweaver – Inserting and Formatting Text Inserting text is just as easy as inserting pictures If you wish to type text.
Office Management Tools II Ms Saima Gul. Office Management Tools II Ms Saima Gul.
Lecture 10 Design of Rough Draft Stage Pits ©2010 Dr. B. C. Paul Note – These Slides contain numerous screen shots from the program MineSight® developed.
Change in your CAD Project File - it happens all the time in robotics.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
An Introduction to Alice (Short Version) – Extras! Yossra Hamid Under the Supervision of Professor Susan Rodger Duke University, June 2014 This is a continuation.
Make a Great Map of Your Engineering Building Traverse ©Mar Dr. B. C. Paul Note – This presentation contains screen shots from the Mine Sight and.
Computer Aided Mine Design Part II – Pit Sequences ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul summer 2003.
Using Statistical Interpolation to Build Block Models – Part II (Setting up Files and Coding Air Blocks) Using MineSight® ©2007 Dr. B. C. Paul revisions.
Entering Your Traverse Data In MineSight ©Feb 2009 Dr. B. C. Paul Note – the following presentation includes screen shots an operating suggestions for.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Nonvisual Arrays by Chris Brown under Prof. Susan Rodger Duke University June 2012.
Pit Reserves and Resources in a GSM ©2012 Dr. B. C. Paul This presentation involves the program MineSight created by Mintec and contains screen shots taken.
Lesson 1. Security At the menu bar at the top you will see the word Tools. Click your mouse on Tools scroll down to Macro. Move the Mouse over and down.
Starting Up MineSight for Your Coal Mine Project.
Introduction to Computer Programming - Project 2 Intro to Digital Technology.
Introduction to Programming in Corvid EXSYS-Corvid is an intelligent systems programming environment General order of tasks: Enter and define Variables.
Slopes in MSOPT Calculations ©2012 Dr B. C. Paul Note – These Slides are based on and include screen shots from the program MineSight by Mintec. Credit.
VB.NET and Databases. ADO.NET VB.Net allows you many ways to connect to a database. The technology used to interact with a database or data source is.
Step 1: access the database Go to a.If you using an on-campus computer,
The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.
You’ll Make a spreadsheet which will be like a Mad Libs Game. These Are The Directions.
SOC 305, Prof. Robert Martin Southeastern Louisiana University.
D.Y.O. Web The new and easy way to create and maintain your own professional dynamic website.
Comparing objects and changing color
Microsoft Word Reviewing Documents.
More Selections BIS1523 – Lecture 9.
1. Open Visual Studio 2008.
How to Submit Google Docs to the Homework Drop Box
Running a Java Program using Blue Jay.
Presentation transcript:

Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also found in Mintec training courses. The slides contain screen shots taken from the program MineSight produced by Mintec Inc.

Inputing MSOPIT Screens This must identify the name of your Block model that has been prepared For MSOPIT These screens can be left as is

Picking Your Surface File This one must identify the Name of the file 13 you Prepared for MSOPIT These fields can all be left as 0 For now. 0 refers to the undisturbed Surface which is where an Ultimate pit starts from.

Have the Computer Calculate the Value of Each Block Left click on the calculate value radio Button For the output report on block value Intervals a number of 5000 works well For the copper moly mine being Considered.

Tell Which Variable In the Block Model Says How Much of the Block is Made of Rock Pick the variable That contains The information These are optional Inputs – Leave them alone

Set Minimum Value for Rock to be Processed The values shown here work Ok for output parameters except You need to put in the minimum Value that a block must have Per ton to break even on Processing costs. This may Require some calculation, Estimation, or picking on your Part.

Input the Economic Parameters for the Mill This is your Mill process Cost (comes from Your Assignment And may Differ from That shown Here)

Continuing the Mill Input This is where Your ore Mining cost/tonne Goes and your Ore specific Gravity. (these Values come From your Assignment and May differ from The illustration Values here)

Input the Cu and Mo Values Copper and Moly values Should be the Value in Concentrate form. These values Are calculated From the copper And moly price Less the cost To produce a Finished product. For Copper this is Copper cost minus The cost of Smelting and Refining. Your values may differ From those shown here

Input Your Recoveries This is the Percent Of copper and Moly recovery At the mill. The numbers To use are Provided in Your assignment And may differ From the values Shown here.

Input Other Data as Shown Here Left click apply

Input for Your Pad Leach Your mining And Processing And specific Gravity values Come from Your assignment And may differ From the Example. Your recovery Also comes From your assignment

Input the Copper Price Copper price is The value of Copper in Solution. It is The selling Price of copper Minus the cost Of solvent Extraction and Electrowinning Given in the Assignment. (Your value may Differ from that Shown here)

Input the Dump Leach Screen Click apply When done

Input the Worthless Dump Screen

Leave the Costs and Discounting Screen Alone This screen is used for mining whole benches From the top down as in a quarry. By leaving The factor equal to 0 the program knows You are not executing this option.

Enter Your Ultimate Pit Slope Pick a constant slope for this Assignment Enter the over-all slope as indicated In your assignment (your value my Differ from the one shown in the Example).

Pick Learch-Grossman for the Method of Finding the Ultimate Pit Pick base which means Show me one pit based on The constraints and Economics given. Pick Learch-Grossman from The drop down menu Accept the other defaults On the page.

Tell the Computer Which Surface to Put the Pit Surface Out to. The 0 surface is the undisturbed Pit surface. The input here Selected pit 1 for the ultimate pit Surface, but you know in the Next assignment you will create 6 stage pits so you can put the Output on surface 7 if you want. You can accept The defaults on Everything else.

Leave the Audit Screen As Is

Set My Output Options Each block of ore will go to a Destination – identify the variable In your block model where the Destination is to go. (This will Depend on the names you gave To variables in your block model) Do the same thing with where you Want info to go on value of each Block and the value per ton of the Rock it contains.

Give Directions for the Report Pick a headline for the report Output Pick a file extension for the output (this enables you to keep a bunch Of reports without over-writing)

Tell The Computer to Run the Routine Left click file Pick run procedure

After the Procedure Runs Set Up the Display Create a New model View with The data manager

It Asks for a Name for the Model View

It Also Wants Me to Pick My Project Control File (my file 10)

It Wants to Know What File I Want I Model View for I’m want my File 13 so I Can see my Finished pit Surface. Left click the File Then left click Ok

I’m Going to Select Making Model Views for All My Surfaces

Now I’ll Open My Model View to See that Final Pit Surface I pick my surface (for me I output The surface to Pit 1 but you Might have Picked pit 7 or Some other Surface) I right click to Pop up a menu And then I Left click on Open.

Here is My Surface I have colors Set for different Elevation but My elevation Colors look real Screwy.

I’m Going to Debug that Color Mess For the surface I’m working Right click to Pop up the menu Then left click on properties

Here Is My Problem I’m displaying My final pit Surface but my Color cut-offs Are based on Topog which is My original Undisturbed Surface. Left click the Blue list box (I’m going to Pick the right Surface to base My color coding Off).

Up Comes My List of Surfaces Since I’m trying To display the Pit 1 surface, I point and left Click pit 1 Then I will left Click Ok

Now That Looks More Like It Now I’m Maneuver And take my Screen shots For the Assignment.

To Run My Floating Cone I Need to Go to the Design Strategy Screen I pick floating cone from the Drop down menu I put in a reasonable Minimum size for the pit Bottom (if it makes a Pointy bottom pit I’ll have A tough time getting my Truck in there) I’ll also want to change some of my output Headings and also the report extension so my New run does not over-write my Learch- Grossman report (because I have to turn in Both reports)

Eventually I’ll Also Have to Try the Run the Costs Increasing as the Pit gets Deeper Go to costs and discounting and Check costs vary by bench Note one more screen comes to life (is not grayed out)

Go to That New Screen Note I have separate cost increases for Ore and Waste (not surprising since we may very well be using different sized Trucks going to different destinations)

Set the Range of Benches to Be Affected Select the range of benches to be affected. (In this case we will Select the full range of benches)

Set How Much Extra Cost We Have at the Start of the Range In our case we have no initial extra cost so we choose zero. (If I were doing something liking adding 3 cents per bench down To bench 20 and then I wanted to starting adding 5 cents per Bench after that I would have to have an extra 60 cents to start With when I started with bench 21)

Set the Cost Increase Per Bench I Go Down Now I put in the cost increase I get for each bench I get Deeper.

If I Wanted to Have Different Rate of Cost Increase for Different Bench Intervals I could Left Click Add to put in a new interval Of course I won’t be doing that for this assignment