Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install
THE INTEGRATED FULL SYSTEM Solar loop Collectors Flashings/connector tube Flextubes Air separator Pump station/controller Expansion tank Solar storage tank Mixing valve Temperature sensor HW CW Existing gas or electric Water Heater 8
Tiles Removed for Collector Placement
Opening the Collector BoxesPreparing to Lift to the Roof
Lifting the U-12 Collector on to the Roof 130 lbs 4 ft x 6 ft
2 U-12 Collector Placement on the Roof Access Holes Cut for Flex Tubes
2 U-12 Collectors Ready for Flex Tube Conical Secure Connections
Roof Ready for Collector Placement and Install With Membrane Wrapping
Hi Performance Collector Placement on Roof
On the Roof Deck Install With Integrated Tile Flashings Even the Sill Skirting
Feeding the Flex Tube Thru the rafters and trusses From the Collectors Heading to the Pump Station
Quick and Simple Assembly Of the Pump Station and Controller that Monitors & Optimizes Tank & Collector Temperatures 24/7
Installation Complete and Ready for Commissioning In under 6 hours Hot Water later that Evening for the Homeowner !!!!
Final Stages of Install Commissioning the System Glycol Solution and Doing Pressure Testing Alls well and Leak Free !!
Skilled and Trained Craftsmen at Work With another Successful VELUX Solar Hot Water Install
All VELUX Flashings Secured And Integrated into the Collectors With a proven Low Profile Aesthetically Pleasing Look Head & Sill Flashings For Leakproof Security
Early Morning 8 am Dew is Gone By 9 am Collector Temp Is F & Rising Rapidly
Final Inspection on the Roof and Alls Well !!!