Progress report: Lithuania Vaidotas Lygis Lithuanian Forest Seed Farming and Tree Breeding Service.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
Symantec 2010 Windows 7 Migration Global Results.
1 A B C
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
EuroCondens SGB E.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
Addition and Subtraction Equations
David Burdett May 11, 2004 Package Binding for WS CDL.
NTDB ® Annual Report 2009 © American College of Surgeons All Rights Reserved Worldwide Percent of Hospitals Submitting Data to NTDB by State and.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
STEM AND LEAF PLOTS. Vocabulary Leaf – the last number Stem – anything to the left of the very last number (sometimes that is 0 ; sometimes it is two.
CHAPTER 18 The Ankle and Lower Leg
2.11.
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Media-Monitoring Final Report April - May 2010 News.
Welcome. © 2008 ADP, Inc. 2 Overview A Look at the Web Site Question and Answer Session Agenda.
Break Time Remaining 10:00.
First SlideNext 68 x 8secs Slides. Slide 2Next W-S-M open top bus 1961.
EE, NCKU Tien-Hao Chang (Darby Chang)
PP Test Review Sections 6-1 to 6-6
1 2 Teeth and Function 3 Tooth structure 4 Dental Problems.
Regression with Panel Data
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
Area under curves Consider the curve y = f(x) for x  [a, b] The actual area under the curve is units 2 The approximate area is the sum of areas.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Termination and shape-shifting heaps Byron Cook Microsoft Research, Cambridge Joint work with Josh Berdine, Dino Distefano, and.
Artificial Intelligence
Midterm Review Part II Midterm Review Part II 40.
Before Between After.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
12 October, 2014 St Joseph's College ADVANCED HIGHER REVISION 1 ADVANCED HIGHER MATHS REVISION AND FORMULAE UNIT 2.
Click Here to Begin 1. These are cheeks teeth ears eyebrows.
Click Here to Begin. 1. I can ______ well. play soccer sing drive a truck clean a building.
: 3 00.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Let’s take a 15 minute break Please be back on time.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Static Equilibrium; Elasticity and Fracture
FIGURE 12-1 Op-amp symbols and packages.
Converting a Fraction to %
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
9. Two Functions of Two Random Variables
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Meat Identification Quiz
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Presented to: By: Date: Federal Aviation Administration FAA Safety Team FAASafety.gov AMT Awards Program Sun ‘n Fun Bryan Neville, FAASTeam April 21, 2009.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Progress report: Lithuania Vaidotas Lygis Lithuanian Forest Seed Farming and Tree Breeding Service

PLANNED...

Kėdainiai Forest Enterprise: The propagation of hardwoods

PLANNED ACTIVITIES (as in PHARE project) Activity 1. Review on the present deciduous forest management practises. Activity 2. Survey and registration of the valuable natural and planted hardwood sites. Activity 3. Establishment of the demonstration paths for showing of various hardwood biotopes and examples of the silvicultural management. Activity 4. Establishment and maintenance of the pilot hardwood plantations for demonstration of conservation and use of hardwood variability. Activity 5. Courses for forest owners, farmers and other interested public groups. Activity 6. Meetings and international seminar.

PLANNED ACTIVITIES (as in PHARE project) Activity 1. Review on the present deciduous forest management practises. Activity 2. Survey and registration of the valuable natural and planted hardwood sites. Activity 3. Establishment of the demonstration paths for showing of various hardwood biotopes and examples of the silvicultural management.

PRESENT ACTIVITIES Activity 1. Review on the present deciduous forest management practises.

Activity 1. Summarizing of data on existing experimental plantations Investigation of the present hardwood industry activities, products, and recent technologies Propagation of current requirements for the forest reproductive material, based on recent EU regulations

PRESENT ACTIVITIES Activity 2. Survey and registration of the valuable natural and planted hardwood sites.

Activity 2. training of local foresters in identification and general understanding of species and habitats location and mappig of valuable hardwood objects: key habitats, gene reserves, demonstration sites...

PRESENT ACTIVITIES Activity 3. Establishment of the demonstration paths

Šėta forest district, Kėdainiai Forest Enterprise Demonstration path in seed reserve of Quercus robur FOREST MANAGEMENT PRACTISES Activity 3.

Šėta forest district, Kėdainiai Forest Enterprise 1. Plot of good natural regeneration of oak Demonstration path in seed reserve of Quercus robur Activity 3.

Šėta forest district, Kėdainiai Forest Enterprise 1. Plot of good natural regeneration of oak 2. Planned oak plantation. To be stocked 1x2 m (without soil preparation, with protective shields) Demonstration path in seed reserve of Quercus robur Activity 3.

Šėta forest district, Kėdainiai Forest Enterprise 1. Plot of good natural regeneration of oak 2. Planned oak plantation. To be stocked 1x2 m (without soil preparation, with protective shields) 3. Plot, left for natural regeneration (without soil preparation) Demonstration path in seed reserve of Quercus robur Activity 3.

Šėta forest district, Kėdainiai Forest Enterprise 1. Plot of good natural regeneration of oak 2. Planned oak plantation. To be stocked 1x2 m (without soil preparation, with protective shields) 3. Plot, left for natural regeneration (without soil preparation) 4. Planned oak plantation. To be stocked 2x3 m (into soil prepared with disc harrow, with protective shields) Demonstration path in seed reserve of Quercus robur Activity 3.

Šėta forest district, Kėdainiai Forest Enterprise 1. Plot of good natural regeneration of oak 2. Planned oak plantation. To be stocked 1x2 m (without soil preparation, with protective shields) 3. Plot, left for natural regeneration (without soil preparation) 4. Planned oak plantation. To be stocked 2x3 m (into soil prepared with disc harrow, with protective shields) 5. Planned oak plantation. To be stocked 1x2 m (without soil preparation and protective shields) Demonstration path in seed reserve of Quercus robur Activity 3.

Šėta forest district, Kėdainiai Forest Enterprise 1. Plot of good natural regeneration of oak 2. Planned oak plantation. To be stocked 1x2 m (without soil preparation, with protective shields) 3. Plot, left for natural regeneration (without soil preparation) 4. Planned oak plantation. To be stocked 2x3 m (into soil prepared with disc harrow, with protective shields) 5. Planned oak plantation. To be stocked 1x2 m (without soil preparation and protective shields) 6. Continuous ploughing – to promote natural regeneration of oak. Sowing by acorns in part of the plot Demonstration path in seed reserve of Quercus robur Activity 3.

Šėta forest district, Kėdainiai Forest Enterprise 1. Plot of good natural regeneration of oak 2. Planned oak plantation. To be stocked 1x2 m (without soil preparation, with protective shields) 3. Plot, left for natural regeneration (without soil preparation) 4. Planned oak plantation. To be stocked 2x3 m (into soil prepared with disc harrow, with protective shields) 5. Planned oak plantation. To be stocked 1x2 m (without soil preparation and protective shields) 6. Continuous ploughing – to promote natural regeneration of oak. Sowing by acorns in part of the plot 7. Plot of good natural regeneration of oak Demonstration path in seed reserve of Quercus robur Activity 3.

Planting material will originate from the local seed trees: Šėta forest district, Kėdainiai Forest Enterprise all mapped numbered phenotypic characteristics evaluated.

M 1:3000 Start of exposition Demonstration path in seed reserve of Quercus robur Seed trees Šėta forest district, Kėdainiai Forest Enterprise

Seed trees selected in gene reserve of Q. robur More demonstration objects... Examples of forest management in the gene reserve Šėta forest district, Kėdainiai Forest Enterprise

No financial support as last years PHARE project has not been granted Incomprehension of the AH projects benefits by state and subordinate forest officials, private forest owners, and hardwood processing companies Inactivity of Supreme forest authorities Lack of experienced and competent English-speaking staff in the region Access to specific forest inventory data is limited PROBLEMS

PERSPECTIVES ? Some work could be done with the support of Kėdainiai Forest Enterprise High economical potential of the hardwoods is at least acknowledged by state and Supreme forest authorities This years PHARE project will be granted (?) The work must go on!