The Critical Path John R. Baker Attorney at Law 1-800-447-1985 Photos by USDA NRCS.

Slides:



Advertisements
Similar presentations
Values John R. Baker Attorney at Law Beginning Farmer Center Photos by USDA NRCS.
Advertisements

F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Making a Success of Succession Planning using the Critical Path Method David W. Baker Farm Transition Specialist Photos.
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
Chapter 10: Project Schedule Planning
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Critical Path and Gantt
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
MGMT 483 Week 8 Scheduling.
Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers are responsible for.
Planning & Scheduling Systems: From Design to Fabrication.
Spring 2008, King Saud University Bar Chart Dr. Khalid Al-Gahtani 1 What is Activity An activity or task is a given kind and amount of work which: –Consumes.
CS CS 5150 Software Engineering Lecture 4 Project Management.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management Techniques.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Workshop-3 Gantt and Pert Chart.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Lecture Note 4 Managing Analysis and Design Activities
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
System Analysis & Design Chapter V: Information System Planning 1.Introduction Nowadays, Information Systems plays the main role in success or failure.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
Appendix A Project Management: Process, Techniques, and Tools.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Gantt Chart Heba Iqbal. What is a Gantt chart? Developed by Henry Gantt Were considered revolutionary when first introduced Type of bar chart Illustrates.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Project Management “Project Planning & Scheduling”
PERT and CPM.
Returning To The Farm Lessons From 20 Years Of Seminars John R. Baker Attorney at Law Beginning Farmer Center Photos.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Making a timeline A timeline shows a graphic representation, or picture, of chronology. Making a timeline lets you understand and remember a sequence of.
The Critical Path John R. Baker Attorney at Law Photos by USDA NRCS.
Project Management.
Chapter 3 Managing the Information Systems Project
Project Time Management
 Chapter 6: Activity Planning – Part 3 NET481: Project Management Afnan Albahli.
A2 Operations Management Critical Path Analysis. How long will it take? n Walls have decided to launch a new Magnum ice cream. Machine delivery will take.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
 Chapter 6: Activity Planning – Part 2 NET481: Project Management Afnan Albahli.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
MADALINA CROITORU Software Engineering week 6 Madalina Croitoru IUT Montpellier.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Network planning models These project scheduling techniques model the project's activities and their relationships as a network. In the network, time flows.
Managing the Information Systems Project Cont’d
Project Planning & Scheduling
Software Project Management
Business Decision Making
Project Planning & Scheduling
Project Planning and Scheduling
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Activity Planning.
Chapter 6: Project Time Management
Project Time Management
Teaching slides Chapter 3.
ENGINEERING MANAGEMENT (GE 404)
Slides Prepared by JOHN LOUCKS
Presentation transcript:

The Critical Path John R. Baker Attorney at Law Photos by USDA NRCS

The Critical Path Method Analyzes a complex project Identifies necessary resources Focuses on the essential activities Prioritizes activities Schedules and monitors progress Calculates the time for completion Provides a graphic view of the plan

Activities Sequential activities are dependent on other activities being first completed and must be completed. -Each must be completed, or near completion, before starting the next activity in the sequence. EXAMPLE: Planting a crop –EXAMPLE: Planting a crop – Parallel activities are not dependent on completing a previous activity. EXAMPLE: Making a land paymentEXAMPLE: Making a land payment

Estimating the Time Needed for an Activity It is difficult to estimate the length of time for a new activity and normal to underestimate the time High priority activities must be carried before immediate activities There will be unexpected or unscheduled high priority work There will be: -Accidents and/or emergencies, Meetings, Holidays, Sickness, Break downs in equipment, Delays, Interruptions, Rejections due to quality or quantity (If it can go wrong it will and at the most inconvenient time.) Develop a systematic approach to include these factors Rely on your experience

Methodology List all activities in plan: The context will determine if an activity is parallel or sequential. Activity ______________________________________ Start date ____________Time to completion ________ Sequential & dependent upon ____________________ Who is responsible for the activity _________________ How will progress be reported?____________________ To whom will progress be reported ________________

Select the graph paper with the appropriate time periods needed to complete the plan

Copy the Activities in the Appropriate Time Periods Start with the activities with the earliest start dates Draw and label each activity as an arrow that ends with a box Remember to denote whether the activity is sequential or parallel

Scheduling Activities Remember to schedule sequential activities so they are carried out in the proper sequence Remember to scheduled parallel activities so they do not interfere with the sequential activities

Prepare a Final Copy Time is marked out across top of the chart Activities are drawn as arrows ending with boxes The length and positions of the arrows show the start date and duration of the activity

The Critical Path is the longest sequence of sequential activities leading to the completion of the plan. Any delay of in the start or completion of an activity on the critical path will delay the completion of the whole plan… or The time allowed for future sequential activities will need to be shortened.

Critical Path Method Chart Weeks Sequential Parallel

Critical Path Method Chart Weeks Sequential Parallel The Critical Path

Presented by: John R. Baker Attorney at Law Beginning Farmer Center BFC.1999