United States Fire Administration Chief Officer Training Curriculum Operations Module 15: High-Rise Simulation Exercise.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

THE RAPID INTERVENTION TEAM
Chapter 19 Lesson Goal After completing this lesson, the student shall be able to communicate effectively by radio and through various reports following.
Zhongxing Telecom Pakistan (Pvt.) Ltd
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
What gas makes up 78% of our atmosphere?
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Module Floor Systems.
Classification of Building Construction Types
Site Safety Plans PFN ME 35B.
7 | Means of Egress (Life Safety Code)
Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
Chapter 12 Lesson Goal After completing this lesson, the student shall be able to make hydrant connections and draft from a static water source according.
Module Reading Plans and Elevations
Fire Protection Systems
1. 2 Earthquake effects on health care facilities 2.
Denver Fire Alarm Test Preparation Speed Drill © Ted Smitty Smith 2013.
PP Test Review Sections 6-1 to 6-6
State Fire Marshal Question and Answer Session with the Louisiana Automatic Fire Alarm Association March 19, 1999.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
There are three types of emergencies:  Internal  External  Natural disasters.
Functional Areas & Positions
Chapter 4 Lesson Goal After completing this lesson, the student shall be able to recognize the various components of basic building construction, understand.
Chapter 16 Lesson Goal After completing this lesson, the student shall be able to operate various fire detection, alarm, and suppression systems and operate.
Analyzing Genes and Genomes
Signs, Signals, and Pavement Markings
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Concrete Construction Part 1
Intracellular Compartments and Transport
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
PSSA Preparation.
Essential Cell Biology
United States Fire Administration Chief Officer Training Curriculum Operations Module 13: Enclosed Mall Simulation Exercise.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
United States Fire Administration Chief Officer Training Curriculum Operations Module 16: Dormitory Simulation Exercise.
School Bus Drivers In-service School Bus Drivers In-service Develop a Special Needs Emergency Exit Plan.
State of Kuwait 3rd Intl Fire & Safety Conference & Expo 4-6 March 2014 Building Performance for Emergency Response Incident Examination and Tactical Response.
C L A S #4 Driver Operator Refresher Training.
FALAR Part 3 – Post Construction  Compilation of  Maintenance records of fire protection/life safety equipment  Test records of fire protection/life.
Tactics.  Garden Apartments  Town Homes  Apartment Buildings 2.
United States Fire Administration Chief Officer Training Curriculum Operations Module 9: Nursing Home Simulation Exercise.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Overview Identify the unique construction factors of single-family dwellings. Recognize the.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Identify the unique construction factors of single-family dwellings. Recognize the basic problems.
United States Fire Administration Chief Officer Training Curriculum Operations Module 18: Penal Institution Simulation Exercise.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
United States Fire Administration Chief Officer Training Curriculum Operations Module 17: Grain Elevator Simulation Exercise.
Southeast Financial Center
Southeast Financial Center
Wilson Hall Fire Protection Features
Bella Vista Fire Department Procedures on Sprinkled Buildings
Presentation transcript:

United States Fire Administration Chief Officer Training Curriculum Operations Module 15: High-Rise Simulation Exercise

United States Fire Administration Ops 15-2 Objectives  Identify critical cues at a high-rise incidents  Establish incident objectives  Select tactics  Identify and request resources  Select alternate solutions  Establish an appropriate ICS organization to manage the incident

United States Fire Administration Ops 15-3 Overview  High-rise: building 75 feet or greater in height  Buildings less than 75-feet height high may present similar difficulties  If fire on top floors of four- or five-story building, treat as high-rise

United States Fire Administration Ops 15-4 Knowledge of Building  “Old” or “new” style construction?  Built-in life safety and fire protection— where and how do they operate?  Current occupancy?  Floors compartmented?  Open space?

Old Style

United States Fire Administration Ops 15-6 Old-Style Characteristics  Bearing wall—masonry  Most reinforced concrete—some not  Large mass (weight)  Less likely to collapse  Floors/walls—reinforced concrete  Many have unreinforced masonry

New Style

United States Fire Administration Ops 15-8 New-Style Characteristics  Core construction—but not all  Steel skeleton—column, beam, and girder  Elevators, stairs, utilities in core  Center core construction  Less mass (weight)—more vulnerable to heat

United States Fire Administration Ops 15-9 New-Style Characteristics (continued)  Floors have been known to sag 2 feet  Sprayed-on coating on steel  Some new high-rises constructed without core –Stairs, elevators, and utilities at various places buildings—mainly on exterior walls

Core

United States Fire Administration Ops Structural Framing Systems  Skeleton of the building  Both styles use interior and exterior columns

United States Fire Administration Ops Exterior Walls—Both Styles  Poured in-place concrete—old style  Prefabricated—new style –Walls lighter weight than old style

United States Fire Administration Ops Exterior Walls—New Style  Bolts to structural frame or floor slab  Leaves space between wall and floor  Unless sealed, can lead to fire and smoke extension to floors above and water damage to floors below

Roof

United States Fire Administration Ops Roofs—Both Styles  2-hour fire-restrictive rating  Know the: –Stair shaft exits –Obstructions on the roof

United States Fire Administration Ops Interior Partition Construction and Compartmentation—Old Style  Interior walls—poured concrete  High level of compartmentation  Walls usually go from floor to to floor

United States Fire Administration Ops Interior Partition Construction and Compartmentation—New Style  Interior partitions and walls usually drywall on a metal stud  May or may not be high-level of compartmentation

United States Fire Administration Ops Electrical Systems  Systems extremely complex and hazardous  Chases one cause of vertical fire spread  Main electrical usually located in basement  Utility company or building engineer should shut down system

Elevator Lobby

United States Fire Administration Ops Elevators  Normal conditions—elevators only practical method of moving people  Fire conditions—elevators become erratic and dangerous  Many control features affected by smoke, moisture, and heat

United States Fire Administration Ops Elevators—Safe Use  Knowledge of how they work  Maximum amount of people—5 to 6  Possible malfunctions What malfunctions can occur?

United States Fire Administration Ops Elevators—Hoistways  Can be multiple elevators in hoistway  Split-bank elevators—low, medium, high-rise

United States Fire Administration Ops Elevators—Emergency Service Feature  Moves cars to designated location  May be activated by fire alarm system  Manual recall may be done by switches in lobby, fire control room, or elevator

United States Fire Administration Ops Elevators—Good Judgment  Can speed up initial investigation and fire control  Can malfunction and take you to the fire floor  Using stairs is safest method  Do not take elevator closer than five floors to the fire floor  Be prepared to take defensive action

United States Fire Administration Ops Smoke Control Systems  Active systems prone to fail under fire conditions  Dirt and dust damage systems  If used for smoke removal, closely monitor the area  Shut down system if notice any adverse affects

United States Fire Administration Ops HVAC Systems  Under fire conditions, can pump heat, smoke and toxins to other areas  Best approach—Shut down system

United States Fire Administration Ops HVAC Systems (continued)  Older buildings: –Close switches that control intake fans –Switches may be in Mechanical Equipment Room (MER)  Newer buildings: –System may automatically shut down –Systems may provide exhaust on fire floor and pressurization of floors above and below –Best bet—Shut down HVAC and use for smoke removal after fire controlled

United States Fire Administration Ops Water Supply  Variety of water supply systems: –1 1/2-inch wet standpipe –2 1/2-inch dry standpipe –2 1/2-inch wet standpipe –Sprinkler systems

United States Fire Administration Ops Water Supply-WARNING  Know outlet pressure—type of hose and nozzle depends on this information: –Typical pressure about 65 psi –This pressure requires smoothbore tip or low pressure fog nozzle –Fog nozzles requiring 100 psi at nozzle produce ineffective streams

United States Fire Administration Ops Water Supply Pressure Control Devices  Minimum pressure must be available at top floor  Pressure Relief Valves (PRV) often placed on lower floors to control head pressure  NFPA Standards #14 and #25 changed since Meridian fire

United States Fire Administration Ops Sprinkler Systems  Required by codes in most states for new construction  Many older buildings do not have sprinklers  Preplanning—know zones the systems protect  Most high-rises do not have sprinklers unless retrofit law

United States Fire Administration Ops Portable Communications Equipment  Can be ineffective at high-rise  Places in building that prevent signal reception and transmission  Radio frequency affects communications capability

United States Fire Administration Ops Built-In Communications Systems  Not found in old style  Hard-wired system—sound- powered phones  May exist in elevators  Local codes should require hard- wired  Headsets should be kept at high- rise  Can reduce load on radio system

United States Fire Administration Ops Smoke/Heat Detectors  Floors may have them  May or may not be connected to enunciator panel  Smoke detectors may be part of HVAC  Preplanning knowledge necessary for effective decision-making

United States Fire Administration Ops Enunciator Panel  Know the location  Know how to read the panel

United States Fire Administration Ops Fire Control Station/Room  Should provide –Specific information on alarms –Fire protection systems status  Often have building communications system to: –Warn occupants –Provide two-way communications with elevators, fire pump rooms, and MER  May be located in the basement

United States Fire Administration Ops Fire Behavior and Fire Spread  Elements that affect fire extension: –Stack effect –Negative stack effect –Vertical extension –Core construction –Fire loading –Heat build-up

United States Fire Administration Ops ICS for High-Rise Incidents  Staging area manager—located two to three floors below fire floor  Base manager—located where apparatus parked, usually 200+ feet from building  Lobby control unit leader—organizes lobby for incoming resources, determines attack and evacuation stairs, and provides personnel to operate elevators

United States Fire Administration Ops ICS for High-rise Incidents (continued)  System unit leader—responsible for all building systems and their effective operation  Ground support unit leader—provides for movement of supplies to staging by way of stair shaft

United States Fire Administration Ops ICS - 8th Floor Fire

United States Fire Administration Ops Activity 15.1: High-Rise Simulation Exercise

Sides A & B

Sides B & C

Side C

Lobby Elevators

Typical Floor

Ba BR LR K Ba BR LR K Ba BR LR K Ba BR LR K Ba BR LR K K BR Ba LR K BR Ba LR K BR Ba LR K BR Ba LR K BR Ba BR LR Ba BR LR E EKK Stair #1 Stair #2 LL Street N Typical Floor Tonnalee Apartments 22nd S t r e t

United States Fire Administration Ops Module Summary  Pre-incident planning –Construction characteristics –Structural features—building systems and fire control rooms  ICS functions for high-rise incidents –Staging area manager –Base manager –Lobby control unit leader –Systems unit leader –Ground support unit leader