E-petroleumservices.com 1 Business Benefits Delivered through True Valve Performance Yvonne Roberts Edinburgh Petroleum Services.

Slides:



Advertisements
Similar presentations
February 5 & 6, Spring Gas-Lift Workshop ASME/API Gas-Lift Workshop API RP 11V5 Continuing the Review of Recommended Practices for Operation,
Advertisements

Predicting Future Gas Lift Performance in a Mature Water Flooded Field
M. J. Haigh Well Design Differentiators CO 2 Sequestration in Depleted Reservoirs SPE Presented at Offshore Europe 2009 Conference.
Gaslift Management in PDO Northern Directorate
Total System Optimisation in Gas-Lifted Fields
PRESSURE PULSE ANALYSIS OF GAS LIFT WELLS
Fuels Ventilation and Combustion Alan White Title Fuels, Ventilation and Combustion The unit has been developed to allow the learner to gain underpinning.
A force applied over a surface is pressure.
Model-based PID tuning methods Two degree of freedom controllers
Unit 12 Conduction in Liquids and Gases
2001 ASME/API Gas-Lift Workshop
Intelligent Gas Lift Cameron Laing, LETS Limited
Real-Time Gas Lift Optimization
GAS LIFT OPERATION By : Ubet Khoirudin TOTAL E&P INDONESIE.
Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
WHAT KIND OF CHALLENGES Mogens Zoll Hundahl Esbjerg, 19 th August 2014.
WELL PERFORMANCE ANALYSIS
be dynamic
GAS PURGE SYSTEMS ‘Manly Hydraulics Laboratory’ 28 th June 2011.
Liquid Loading Current Status, New Models and Unresolved Questions
1 Gas Hydrate basics. 2 Gas Hydrates Ice-like, crystalline solid May exist at temperatures up to 25 ° C at high pressure ‘Practical discovery’ by Hammerschmidt,
Foam Flow Meeting, Jul.9th, New Comprehensive Equation to Predict Liquid Loading Shu Luo The University of Tulsa.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l
Camcon Oil Limited Ian Anderson, Chief Operating Officer.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
ASME – WORK SHOP - KUALA LUMPUR 2003 By:
By: Gatut Widianoko Weatherford Artificial Lift Systems
PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l
Gas Lift Design Philosophy for Chevron’s Subsea Developments
Gas Lift Redesign in Dual Strings Completion
© Copyright 2006 POSC1 Gas Lift Scenario Flow Network Construction.
Gaslift Management in PDO Northern Directorate
E-petroleumservices.com 1 Online Field-Wide Gas-lift Optimisation Dr Alasdair S Brown Technical Manager EPS Americas Inc.
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
Åsgard Subsea Gas Compression. Norwegian Petroleum Directorate The Norwegian Petroleum Directorate (Norwegian: Oljedirektoratet) or OD is a Norwegian.
Analysis of Gas Lift Transient Effects Henry Nickens Adam Ballard BP - Houston.
Shell Global Solutions PRODML Business Overview Ron Cramer.
Automating Continuous Gas Lift
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Petroleum Experts Ltd. Janvier Lissanon
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
Copyright February Shell International E & P All Rights Reserved ASME/API Gas-Lift Workshop Sheraton - North Houston Houston, TX February 6 and.
Automating Flow Control on Gas Lift Wells
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
CE 3372 Water Systems Design
e-petroleumservices.com 1 Gas Lift Automation Dr Alasdair S Brown Technical Manager EPS Americas.
Advanced Artificial Lift Methods Prepared by Dr. Nguyen Advanced Artificial Lift Methods – PE 571 Introduction.
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
Challenges of Offshore Gas Lift Break-out session API/ASME Gas Lift Workshop 4-5 Feb 2009 Wim der Kinderen Senior Production Technologist Shell EP Europe,
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
Thermo-hydraulic Analysis of a Gas-Condensate Pipeline for Hydrate Prevention During Steady State Production By Itong Ujile.
EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
IMPROVED ENGINEERING WORKFLOW
Asekhame Yadua Introduction Main Results
Analysis of Heading in Artificially Lifted Wells
Chemical additive solutions to overcome challenges and create value
Automated Gaslift Control Pecten Cameroon Company
New Technology Opening Remarks
Active Control of Gas Lift Wells Simulation and Experimental Series
Flow Network Construction
Gas-Lift Breakout Sessions Fall 2003 Gas-Lift Workshop
CHAIR - JIM BENNETT EXXONMOBIL
2001 ASME/API Gas-Lift Workshop
CHAIR - JIM BENNETT EXXONMOBIL
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Presentation transcript:

e-petroleumservices.com 1 Business Benefits Delivered through True Valve Performance Yvonne Roberts Edinburgh Petroleum Services

e-petroleumservices.com 2 Introduction True Valve Performance Well Modelling i-AM Total System Optimisation $$

e-petroleumservices.com 3 intelligent Asset Management intelligent Asset Management is maximising the value that an oil or gas field delivers over its life from discovery to abandonment. –Initial investment (optimise strategy for production) –Daily Operations (optimise investments already made) –Planning (optimise timing and amount of future investments) For any producing asset, the first element is complete and the major emphasis is on intelligent Operation and Planning.

e-petroleumservices.com 4 True Valve Performance (TVP) Q Q THP IPR TVP P down Q gi Thornhill-Craver/orifice Gas-charged valve Valve Data custom-measured by Valve Performance Clearinghouse Measured data, not generic correlations Data specific to valve type and port size Accuracy!

e-petroleumservices.com 5 Data Flow On-line integration with SCADA systems Off-line activities Well Models with TVP Well Model Tuning Gas-Lift Diagnosis Gas-Lift and Total System Optimisation Steady-state Tuning and Analysis Dynamic Gas-Lift Analysis

e-petroleumservices.com 6 Total System Optimisation Fuel, Q gc Formation Gas, Q gf Produced Gas = Q gf +Q gi Other uses = Q gf -Q gc Lift Gas, Q gi Oil + Water +$-$ +$ Compressors Qsuction Pdisch Stonewall Surge Gas-lifted Wells (Curves for one THP) CHP Qoil Gas Injection Rate TVP provides the link

e-petroleumservices.com 7 Valve Stability Valve performance curve for a given CHP P Q gi Amount of gas injected by that valve at the given Casing and Tubing pressures Limit of valve stability Unstable operating point Tubing Performance for a given THP Increasing CHP (and P Minimum stable gas injection rate

e-petroleumservices.com 8 ReO Optimisation Flow Group Produced Fluids from Production Manifold Gas Injection Manifold (Pm1, Tm1) Flow Group 2 Wells To other Flow Groups Gas Injection Manifold (Pm2, Tm2) Flow Group 3 Wells To other Flow Groups Multiphase Optimisation

e-petroleumservices.com 9 On-line Diagnosis (Sedilag) Read SCADA Surface Production Data Check Gas Supply Status Check Production Status Check complete pressure drop from CHP to THP using valve models Advise operator and recommend remedial action if necessary Calculate deepest possible point of injection Pressure Depth P Cas P Tub Mandrel 1 Mandrel 2 Mandrel 3 Mandrel 4 Check which valve(s) open and the opening margin(s)

e-petroleumservices.com 10 Dynalift Inflow Q gi (t)

e-petroleumservices.com 11 Benefits through Optimisation Venezuela/Maracaibo –automated optimisation and GL-diagnosis 250 wells leading to gains worth around $36 Million/annum Kuwait –automated optimisation and performance analysis >400 wells with projected impact of $ Million/annum Norway/Ekofisk –impact assessment of Ekofisk II/integration with SCADA sustain increased production worth ~ $180 Million/annum North Sea –analysis and optimisation of single well performance prevention of over-intervention yielded production increase of ~ $1000/d.

e-petroleumservices.com 12 Business Benefits Delivered through True Valve Performance Yvonne Roberts Edinburgh Petroleum Services