NOAA Weather Radio Broadcast Message Handler

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
ZMQS ZMQS
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
ABC Technology Project
Chapter 15 Integrated Services Digital Network ISDN Services History Subscriber Access Layers BISDN WCB/McGraw-Hill The McGraw-Hill Companies, Inc., 1998.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Figure Essential Cell Biology (© Garland Science 2010)
Clock will move after 1 minute
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
How Cells Obtain Energy from Food
Immunobiology: The Immune System in Health & Disease Sixth Edition
By Rasmussen College. 1. What majors or programs do you offer? 2. What is the average length of your programs? 3. What percentage of your students graduate?
McGraw-Hill©The McGraw-Hill Companies, Inc., 2001 Chapter 16 Integrated Services Digital Network (ISDN)
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
NOAA Weather Radio/Broadcast Message Handler (NWR/BMH)
Presentation transcript:

NOAA Weather Radio Broadcast Message Handler Project Gary Dayton Project Manager Office of Science and Technology National Weather Service

Objectives Impacts Replace legacy Console Replacement System (CRS) 15 years old (far beyond end of life) Hardware and software support difficult Leverage AWIPS II Hardware Baseline Software baseline O&M Tech refresh Impacts WFO Forecasters Minimal Same user interface and functionality as CRS Public None Same weather products

CRS Hardware (Legacy)

AWIPS II/BMH Hardware

BMH High Level Data Flow Legacy CRS AWIPS II BMH

BMH Architecture

BMH Progress Completed Functional Requirements Document Completed Preliminary Design Review Completed Critical Design Review AWIPS II Software Development Initiated Digital Analog Converters Tested and Approved for Production

BMH Schedule Task Start Finish Functional Requirements Document 09/12/13 11/25/13 High level Design Document 12/17/13 04/09/14 Software Design Document 01/17/13 05/20/14 Preliminary Design Review 03/27/14 Critical Design Review 05/21/14 Software Development 05/05/14 12/19/14 Initial Software Demonstration 08/27/14 DAC Delivery 11/01/14 12/31/14 Final Software Demonstration 12/17/14 Software Integration Testing (SWIT) 12/22/14 02/19/15 Software Acceptance Testing (SAT) 03/10/15 03/15/15 Alpha Testing 03/16/15 04/28/15 Operational Test and Evaluation 04/20/15 07/24/15 Deployment Readiness Review 07/27/15 07/28/15 Deployment 08/05/15 09/16/15