Well surveillance by continuous temperature profiling using DTS kit

Slides:



Advertisements
Similar presentations
PID Control Loops Guy Zebrick.
Advertisements

Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
1 ASTEL 2012 CONFERENCE EUROPEAN NETWORKS: STRATEGIES & REALITY Sheraton Sofia 10th April 2012.
Predicting Future Gas Lift Performance in a Mature Water Flooded Field
SPE Getting the Most out of Networked Drillstring Petersen, Sui, Frøyen, Nybø Center for Integrated Operations in the Petroleum Industry & SINTEF.
The Renewable Future for the UK
1 New build-up technique with copper bump AGP Process.
Guillen Lopez Inge Vintermyr Marine Surveillance System LoVe Project.
Solid level measurement
How To Leverage Your Data? Presented by Michel Ruel, Top Control Inc. 1.
Hydrological Services Pty Ltd Heater Model TB323LP For Model TB3 Tipping Bucket Raingauge Presented By W.R. Barratt CEO Copyright.
December 27, 2012 The I.A. University of Ahvaz Mahdi Bavi Hossein Kharazmipour.
1 BOILERS AND EFFICIENCY Gary Archer Vice President of Sales JW Stevens Co.
Power Plant Construction and QA/QC Section 2.3– Steam Generators
Chapter 18 ChEN 4253 Terry A. Ring
Use of Steam Tables Saturated Vapor or Liquid
Petroleum technology Pressure Sensor © 2012, all rights reserved Gauges Deployment.
Intelligent Gas Lift Cameron Laing, LETS Limited
Real-Time Gas Lift Optimization
 Depth Into the earth Surface of the earth Distance along the fault plane 100 km (60 miles) Slip on an earthquake fault START.
Air Conditioners.
Waves and Sound Review.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Energy Saving in Hospitals: Hong Kong Initiatives
DCN286 Introduction to Data Communication Technology Session 5.
ISO 9001:2008 Co. Manufacturers & Exporters of Hydraulic Tank Jacking Equipments, Power Packs & Vacuum Boxes.
Layers of the Earth Study Guide Standard S6E5
© DualSun – Thermal performance study of DualSun installations by Transénergie Thermal performance analysis of two DualSun installations 1.
IKCO Samand ABS System Presentation.
by Wim der Kinderen Consultant Production Technologist
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Completion Object Overview June 2013 WITSML/PRODML Standards.
Smart Sensor Technology for Gas Pipeline Monitoring
COIN Soap Box Meeting #5 (SBM#5) Downhole Control Line Wet Connectors: Hydraulic, Electric And Fibre Optic Connectors…. Are They Reliable Completion Options.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
Johan Castberg Production Challenges
Nexans experience in deployment of sensors in subsea cable systems
SmartPacker Workup - 8/01 SmartPacker Workup 8-01 Working document This is a work-in-progress And is under development. Not for Publication ! Robin Lafever.
Downhole Pressure Monitors Halliburton Pressure Transmission Systems (PTS) have been in use at SYU since 1984 (Hondo) & 1993 (Harmony & Heritage) Have.
ASME/API GAS LIFT WORKSHOP DOWNHOLE GAS LIFT AND THE FACILITY John Martinez Production Associates ASME/API GAS LIFT WORKSHOP.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
Developments in the IntelliFIBER ™ Fiber Optic Fence Sensor
Philip Holweg Wim der Kinderen (Shell Expro)
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
1 Update on ELift™ SAGD artificial lift Presentation to Artificial Lift & Low-Pressure SAGD Subcommittees Nov 2004 Ken Kisman Ph.D., P.Eng.
1 Through Wall Communication Revolutionises Pig Tracking By Gordon Blair, UK Sales Manager, TDW Offshore Services PPSA, Aberdeen 19/11/2008.
How to Maintain High Producing Efficiency in Sucker Rod Lift Operations Lynn Rowlan.
Flow Assurance Integrity Monitoring FAIM™ a “Game Changing” Technology Presented By Elizabeth Breakey.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
© LogicaCMG All rights reserved Distributed Temperature Sensing Database Stephen Vear Shell Global Solutions / LogicaCMG.
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Challenges of Offshore Gas Lift Break-out session API/ASME Gas Lift Workshop 4-5 Feb 2009 Wim der Kinderen Senior Production Technologist Shell EP Europe,
Introducing OmniWell™
Optical performance measurements of various fibre connections
A Fiber-Optic Borehole Seismic
Lecture 10 Production Engineering
Online monitoring applications for power cables Joona Mörsky.
Mike Webster Intelligent Wells Project UTG Aberdeen
A PROPOSAL TO TRANSPORT FLUIDS FROM WELLHEAD TO FLOW STATION USING A GAS DISPLACEMENT PUMP. Juan Carlos Brown, 6th July 2017.
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Shell UK Exploration and Production
Marine Surveillance System LoVe Project
Presentation transcript:

Well surveillance by continuous temperature profiling using DTS kit Wim der Kinderen Consultant Production Technologist Shell UK Exploration and Production Aberdeen w.derkinderen@expro.shell.co.uk API/ASME Gas Lift Workshop, Houston, February 2001

Distributed Temperature System (DTS) How does it work? Sensor is ‘standard’ optical fibre Fibre is pumped into well through control line post completion or ‘hardwired’ using fibre optic braided cable Measures temperature along the length of fibre (1 m resolution) History >100 Oil well industry installations (e.g. Aera-steam flood) BPA Wytch Farm successes KA-7, M12, M17 Value Drivers Gas lift optimisation, tubing integrity, reservoir inflow data Reliability of system potentially higher than standard PDGs

The physics behind DTS Distributed temperature is measured by sending a pulse of laser light down the optical fibre. Molecular vibration, which is directly related to temperature, creates weak reflected signals. The reflected signal is detected in the surface read-out unit and converted to values of temperature at 1 metre intervals along the fibre and well. Multi-mode fibre is 50µm diameter with a 125µm doped silicon cladding, within a wear resistant acrylate coating. Time =ƒ(depth) Anti-Stokes vs. Stokes amplitude = ƒ(temp)

Optic fibre deployment Xmas Tree Fibre reel Packer Sensa® Signal Conditioner Adaptor Flange Casing Water Pump Real Time Data Management System (RTMS) Optic fibre deployment DTS specs: Accuracy & resolution up to 0.1°C Datapoint every metre Up to 10,000 datapoints Operates -40°C to + 300°C Up to 10 wells per surface unit

TA27 DTS installation, April 2000 - platform well - initial GL producer, later water injector - encapsulated dual 1/4”sensor tube clamped to tubing, down to packer - datasets (T versus depth) collected every 20 minutes and sent to shore - latest 10 datasets accessible on the web - temperatures at 10 selected depths recorded in PI data historian

T (C) ahd (m) t 1 = 14:16 h - kick-off started

Observations: Bunch of wells coming together beneath the platform: earth heated up by producing wells Lift gas: 100+ °C at wellhead cooled by seawater Sensor tubes are plastic encapsulated: insulated from the tubing effectively Tannulus is measured Above lift point: Ttubing > Tannulus > Tformation Below lift point: Ttubing  Tannulus

Annulus pressure and wellhead temperature trends during unloading

T (C) ahd (m) t 6 = 23:01 h - ULVs closed, tubing warming up t 5 = 21:46 h - ULVs re-open at higher gas rate t 3 = 18:01 h - 2nd ULV and orifice pass gas t 6 = 23:01 h - estimated tubing temperature t 4 = 18:46 h - ULVs closed, inflow started t 2 = 17:16 h - top ULV open

What’s planned next? Combine gas lift surveillance and reservoir inflow monitoring DTS across reservoir sections inside/outside casing Develop real-time thermal profiling analyses tools Develop sub-sea Xmas tree wet mateable connector (on-going) Develop downhole liner top wet mateable connector Develop long distance DTS capability via umbilicals

Subsea Deployment OK 2001 Subsea Distribution SDU Wellhead & SCM Optical Wet-Mate Connector SDU Subsea DTS pod Main Umbilical SCM Well Jumper Upper Completion Lower Completion Subsea Distribution Wellhead & Tubing Hanger Pod Jumper UTDA Data Comms. DTS POD DTS Processor Wet-Mate Connector for Tree/TH OK 2001 Optical Wet Connect