King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Presented to: Dr. Sadi Assaf CEM 520 Class Causes.

Slides:



Advertisements
Similar presentations
Innovation data collection: Advice from the Oslo Manual South East Asian Regional Workshop on Science, Technology and Innovation Statistics.
Advertisements

Innovation Surveys: Advice from the Oslo Manual South Asian Regional Workshop on Science, Technology and Innovation Statistics Kathmandu,
FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
1 WATER AUTHORITY Dr. Or Goldfarb CENTRAL BUREAU of STATISTICS Zaur Ibragimov Water Accounts in Israel Vienna January 2009.
Company Name PRESENTATION NAME Compilation and Dissemination of Energy Statistics International Workshop on Energy Statistics, Beijing, Sep 2012 International.
ABC Change Orders College of Environmental Design
Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
Are You Smarter Than a 5 th Grader? 1,000,000 5th Grade Topic 1 5th Grade Topic 2 4th Grade Topic 3 4th Grade Topic 4 3rd Grade Topic 5 3rd Grade Topic.
4 TH TERM BATCH: 2010 LECTURE # 1 & 2 5/8/2011 Lec#1 & 21.
12 Financial Management 12-1 Financial Planning
Topics
State of the City Address Glen P. Stewart, Mayor May 10 th,
Industrial Statistics In Afghanistan Economic Statistics Division Central Statistics Organization(CSO) Afghanistan 1.
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA Construction Engineering & Management CEM-520 CHANGE ORDERS IN CONSTRUCTION PROJECTS.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS COLLEGE OF ENVIRONMENTAL DESIGN Dhahran, Saudi Arabia THERMAL AND ECONOMIC PERFORMANCE OF INSULATION FOR.
Trends in Internet Usage & its Social Effects in Saudi Arabia Dr. Sadiq M. Sait King Fahd University of Petroleum & Minerals Dhahran, Saudi Arabia ICASE.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important.
Dr. Michael R. Hyman, NMSU Sample Size (Click icon for audio)
Facts About King Fahd University of Petroleum &Minerals KFUPM.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
DATA ANALYSIS I MKT525. Plan of analysis What decision must be made? What are research objectives? What do you have to know to reach those objectives?
1 FACTORS AFFECTING FACILITY MAINTENANCE MANAGEMENT AUDTING IN SAUDI ARABIA BY Al-Hammad,A. and AL-Zahrani A., College of Environmental Design, King Fahd.
Presented By: Wasel A. Al-Muhammad 24 December 2002 by Ahmad I. Al-Musallami MS Thesis: CEM, KFUPM, 1992.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
Trends in Internet Usage & its Social Effects in Saudi Arabia
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS COLLEDGE OF GRADUATE STUDIES CONSTRUCTION ENGINEERING AND MANAGEMENT For Dr. Sadi A. Assaf A Conceptual Model.
Abdallah M. Al-Mahasheer
1 CONTRACTORS QUALITY SYSTEMS ASSESSMENT TO ISO 9000 By: Tawfiq Al-Atiq December 1996 Presented to: Dr. Sadi Assaf & CEM-520 Class Presented by: Eid S.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
THE APPLICATION OF VALUE ENGINEERING ON PUBLIC CONSTRUCTION PROJECTS IN SAUDI ARABIA BY: Mohammad Ali Husain Al-Sughaiyer Supervised By: Dr. Saadi Assaf.
ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )
CEM 520: Construction Contracting and Administration 03 June 2007
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.
1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
FACTORS INFLUENCING IMPLEMENTATION OF MAJOR INFRASTRUCTURE PROJECTS IN KENYA: A CASE OF THE SOUTHERN BYPASS ROAD, KENYA By 1. Dr. Charles Wafula Misiko.
Dr. PARICHART PALANANTANA RATTANA BUNDIT UNIVERSITY Study the Readiness and Characteristics of e-Learning for Students at Private Universities in Bangkok.
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
AN INTRODUCTION DATA COLLECTION AND TERMS POSTGRADUATE METHODOLOGY COURSE.
King Fahd University of Petroleum & Minerals
Facts About King Fahd University of Petroleum &Minerals KFUPM.
Estimating a Population Standard Deviation. Chi-Square Distribution.
Copyright  2003 by Dr. Gallimore, Wright State University Department of Biomedical, Industrial Engineering & Human Factors Engineering Human Factors Research.
Chapter 8 : Estimation.
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
King Fahd University of Petroleum and Minerals
Welcome to Presentation. Presentation on Living standard and socio- economic condition of garments employees.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
BYU WIND POWER PROJECT by Powergy Marketing. BYU WIND POWER PROJECT by Powergy Marketing.
Class Seven Turn In: Chapter 18: 32, 34, 36 Chapter 19: 26, 34, 44 Quiz 3 For Class Eight: Chapter 20: 18, 20, 24 Chapter 22: 34, 36 Read Chapters 23 &
Estimation and Confidence Intervals
Claims in Construction Projects
Estimation and Confidence Intervals
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
Causes of Contractors’ Failure “ North West Bank” Graduation Project
Under supervision of: Eng. Reema Nassar
The Most Gracious and The Most Merciful.
Causes Of Contractors’ Failure In West Bank
Financial Appraisal of Project
Confidence Intervals for the Mean (σ Known)
Factors Affecting Bid/No Bid Decision Making IN The West Bank
Researching Industry Financial Statistics
‘ Causes of Delay During Construction Phase at Palestine ’
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Presented to: Dr. Sadi Assaf CEM 520 Class Causes of Contractor’s Failures in Saudi Arabia By: Adel Al-Barrak June 1993 Presented By: Tariq Al-Wabil 28 December 2003

OBJECTIVES RESEARCH METHODOLOGY RESULTS CONCLUSION RECOMMENDATION Q & A GUIDELINES Causes of Contractor’s Failures in Saudi Arabia

ٱ OBJECTIVES To undertake a comprehensive analysis of the most important factors that cause business failure among contractors. To identify and analyze the most severe factors causing failure in Saudi Arabia. To test the hypothesis that different grades of contractors, generally agree on the severity of failure. Causes of Contractor’s Failures in Saudi Arabia

ٱ RESEARCH METHODOLOGY Questionnaire Design. Part 1 : Purpose of the survey. Part 2 : General Information. Part 3 : Causes of Failures. Causes of Contractor’s Failures in Saudi Arabia

ٱ RESEARCH METHODOLOGY Questionnaire Design. Part 1 : Purpose of the survey. Part 2 : General Information. Part 3 : Causes of Failures. Causes of Contractor’s Failures in Saudi Arabia

ٱ RESEARCH METHODOLOGY Questionnaire Design. Part 1 : Purpose of the survey. Part 2 : General Information. Part 3 : Causes of Failures. Causes of Contractor’s Failures in Saudi Arabia

ٱ RESEARCH METHODOLOGY Questionnaire Design. Part 1 : Purpose of the survey. Part 2 : General Information. Part 3 : Causes of Failures. Causes of Contractor’s Failures in Saudi Arabia Statistical Sampling. Classification of Contractors. Sample size Information.

Contractor Classification Certificate Causes of Contractor’s Failures in Saudi Arabia

Degrees Financial Limits of Saudi Contractor#Field Degree (In Millions Riyal) 5 th 4 th 3 rd 2 nd 1 st Roads Water and sewage works Industrial Works Marine Works Buildings Electrical Works Mechanical Works Electronic Works DamsLandscaping Slaughter Houses Cities Cleaning & Hauling of garbage Parks & recreation grounds Maintenance Medical Centresb Maintenance Wells Drilling More than 300 More than 200 More than 100 More than 10 Causes of Contractor’s Failures in Saudi Arabia

ٱ RESEARCH METHODOLOGY Questionnaire Design. Part 1 : Purpose of the survey. Part 2 : General Information. Part 3 : Causes of Failures. Causes of Contractor’s Failures in Saudi Arabia Statistical Sampling. Classification of Contractors. Sample size Information.

Sample Size Information hStrataStrata Population N (h) Sample Size Percent of Sample to Population Size Prop. Sample 1 Group One %27.9% 2 Group Two %39.7% 3 Group Three %32.4% %100% ٱ RESEARCH METHODOLOGY

ٱ RESULTS STATISTICAL METHODS. Causes of Contractor’s Failures in Saudi Arabia STATISTICAL METHODS CROSS TABULATION STATISTICAL TECHNIQUES CORRELATIONRANKING Specialty Experience Volume of Business Number of Workers Mean Standard Deviation Standard Error of Mean Confidence Interval Coefficient of Variation Spearman Partial Multiple Grade One & Two Grade Three Grade Four

ٱ RESULTS MAJOR FINDINGS. Causes of Contractor’s Failures in Saudi Arabia Finance Causes % Environmental Causes 23.7 % Managerial Causes % Expansion Causes 21.7 %

ٱ RESULTS 1 - Project cost estimation > The Owner’s budget = Lowest Price. 2 - Comparison Between Contractors. 3 – Early Planning for the Project. 4 – Not Qualified Causes of Contractor’s Failures in Saudi Arabia Low Price + Low Quality.

ٱ RECOMMENDATIONS Qualified Owner Improvement of estimation. No. of payment, late payment. Two committees (organization/cash flow) Motivating Workers Long term planning. Causes of Contractor’s Failures in Saudi Arabia

ٱ CONCLUSION Insufficient Experience. Poor Estimation. Anyone could become a contractor. Cash flow Problem. Labor productivity & Improvement. Bad Decisions “One Man Role’ Neglect. Managerial Maturity. Causes of Contractor’s Failures in Saudi Arabia

Q & A Causes of Contractor’s Failures in Saudi Arabia

Thank You Causes of Contractor’s Failures in Saudi Arabia