FACILITIES. GENERAL OVERVIEW OF PRODUCTION FACILITY 11900 m 2 Covered storage Area 11900 m 2 19600 m 2 5 Rolling lines 19600 m 2 68500 m 2 Fabrication.

Slides:



Advertisements
Similar presentations
How to create a climate graph?. Step One: Draw on three axis.
Advertisements

Welcome to Who Wants to be a Millionaire
Shanghai Kaiquan Pump (Group) Co., LTD.
MITRASINOVIC (SERBIA)
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Demonstration Problem
Value Stream Mapping AGENDA Introduction to mapping
Woods for Water South East Workshop 22 nd October 2013 Forestry Commission grants & support Matthew Woodcock Partnerships & Expertise Manager South East.
1 More Standard Costing & Variance Analysis Week 10.
Who Wants To Be A Millionaire? Maths Special Miss Carries Edition.
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire? Mrs Mances Edition.
Who Wants To Be A Millionaire?
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
1 Copyright Copyright 2012.
1 1 North Central USA South Central USA Northern Europe Western Europe Eastern Asia Southeast Asia 24 x Node CDN.
Welcomes You. Hindi/English Basics Learning about surrounding English Conversation Spoken English Grammar English Shaper Program Personality Development.
Some Practice Questions in Engineering Economics
5.5 Resource Management Section 5.6 Resource Management Examples.
S T A N D A R D S AS/NZS :1994 Specifications for rainwater goods, accessories and fasteners Part 1: Metal shape or sheet rainwater.
Problem1; Admission Flow
Iron Product Industries Floating Roof. Benefits- Savings - Preventing evaporation of product, which will pay for itself in less than a year Prevents Pollution.
Work, Power, & Energy Chapter 12 and 13.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
©2013 – The Will-Burt Company – All rights reserved. MIS 2013 R. J. Reese 1 Orrville, Ohio Contract Manufacturing Your full service partner! Initial Proto-Typing.
Sl No Top-up Amount No Of Affiliate Ads Payment Per Day By Affiliate Ad Total Affiliate Ad Income 1.5,000/- Daily 2 ad for 100 days 100/- Affiliate.
TRADITION, POWER QUALITY , INNOVATION
EN 407. OH 1..
Experiences with the Automated Storage and Retrieval System (ASRS) in Mo i Rana Helén Sakrihei, Head of The Repository Library, The National Library of.
The Millitron. Built in Speed: 2 – 20 m/min 2.Capacity: 200,000 m 2 per week 3.Colours: 12 + endless mixes 4.Length of unit: 120 m Facts about.
Water Distribution Systems – Part 1
What We Do LED High Bay & Low Bay LED Flood Light LED Car Park Light LED Tunnel Light LED Street Light LED T8 Tube Light.
Presented by Sandra Healy, CGFM Principal Auditor Idaho Transportation Department 1.
Time-Labour Analysis for the use of Overhead Gantry Cranes in Modern Steel fabrication workshops. By David Rolle. MD. Rimco Building Systems Pty. Ltd.
SHILPA STEEL & POWER LIMITED
LLC «Severstal-Gonvarri-Kaluga»
Welcome to We Build Solutions!. SMF History Cement Quarries Battery Manufacturing Foundries Plastic Food Processing & Distribution …and more Founded in.
CALDSTEEL PRESENTATION. METALWORK INDUSTRIAL PROJECTS ASSEMBLY INDUSTRIAL.
Fixed and Variable Costs. Median income per household member in the U.S. in 2006 was in the range from: 1)$15,000-20,000 2)$20,000-25,000 3)$25,000-30,000.
Welcome to the information pages of the LIST linear fire detection system.
Where is RiverStone?. Most of Southeast within 500 mile radius Overnight truck shipping to significant portion of eastern US.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
PRODUCTION AND OPERATIONS MANAGEMENT
Process Capacity.
Chapter 5 Capacity Planning For Products and Services
Bollinger Shipyards. Established 1946 Family owned and operated Headquarters in Lockport, LA 2750 employees Facilities 8 Repair 2 New Construction 1 Logistics.
WAREHOUSE & OFFICE: Nibbia, San Pietro Mosezzo – NO – via Buonarroti 43 – ITALIA Cap.Soc i.v. – P.I – C.F
2012 Gulf Coast Real Estate Summit Industrial Market Overview Mobile/Baldwin County Jeremy B. Milling, CCIM White-Spunner & Associates, Inc. Industrial.
Real-Time Gas Lift Optimization
Employer pays monthly fees for all employees Key disadvantage = Pay regardless of usage 100 employees x $15/m = $1,500/month 100 employees x.
Making Landmark or Friendly Numbers (Multiplication)
Pressure = force area = 12 N 25 cm 2 = 0.48 N/cm 2.
Example of a Decision Tree Problem: The Payoff Table
Strategy Review Meeting Strategy Review Meeting
Equal or Not. Equal or Not
Slippery Slope
Structures and Mechanisms. Pulleys A pulley wheel is a mechanism which helps move or lift objects. pulley Exercise machine.
Beat the Computer Drill Divide 10s Becky Afghani, LBUSD Math Curriculum Office, 2004 Vertical Format.
1 Damietta Container & Cargo Handling Co. DCHC General overview January, 2012.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Fundamentals of Cost Analysis for Decision Making
Partial Products. Category 1 1 x 3-digit problems.
Assigned Exercises & Problems, Ch 13: Budgeting
Cost-Revenue Analysis for Decision Making
Clark–Reliance Company Manufacturing Update Presented to General Electric July 17, 2007.
BAKU DEEP WATER JACKETS FACTORY NAMED AFTER HEYDAR ALIYEV
Presentation transcript:

FACILITIES

GENERAL OVERVIEW OF PRODUCTION FACILITY m 2 Covered storage Area m m 2 5 Rolling lines m m 2 Fabrication Workshop m m 2 Outdoor Erection Area m m 2 Fitters Training School 2000 m m 2 Welders Training School 1296 m 2 m2 Erection Hall m2

PRODUCTION FACILITIES KEY FIGURES Yearly Production Capacity: t by 2016 Monthly Rolling Capacity: 2 500t (Single Shift) Annual Production Man-hours: m/h Annual Engineering Man-hours: m/h Maximum Indoor Lifting Capacity: 240t Maximum Outdoor Lifting Capacity: to date 4,200 te

YARD LAY OUT

LOGISTICS & WAREHOUSING Direct Access from Garadagh Railway Station to the Warehouse. Direct Access to Salyan Highway – Part of the Traceca Project. Dedicated Customs Office within the Yard. Over m2 Storage Available with Segregation Capability.

STEEL PREPARATION FACILITY 3 Blasting Machines. 4 SAF Multihead Burning Tables 3 Computer Assisted Cutting Machine MEGATOME. 2 Automatic Saws for Beams

STEEL PREPARATION FACILITY 3 Blasting Machines. 4 SAF Multihead Burning Tables 3 Computer Assisted Cutting Machine MEGATOME. 2 Automatic Saws for Beams

ROLLING FACILITY 8 rolling machines with capacity up to 150mm thickness and up to mm internal diameter. 22 SAW welding booms and 9 Mobile Semi Automatic Welding Machines. 16 Overhead cranes up to 50t capacity.

ERECTION AREA 6 Skidways with a Bearing Capacity from 85 t/lm up to 350 t/lm. 25 Crawler & Mobile Cranes with up to 750t lifting Capacity m refurbished quay with 2 x 100 m reinforced offloading area (50t/m2) Dedicated Push-Pull System capable of moving structure up to T.

PIPING WORKSHOPS 1 Exotic Bay with a 10T Overhead Crane 1 Carbon Steel Bay 2 x 10T Overhead Crane Outfitting with Specialized Tooling

SEA ACCESS No Tide. Min. Water Depth to Open Sea: 8.5m Water depth in front of each Skidway: 11.9m Up to 14 Slots available in a Sheltered harbour for Canal Barges/Ships.

PAINTING/BLASTING Existing Facilities Recoverable Blast medium Monthly Capacity of up to m2. Adjacent Area for Expansion. Temperature Controlled. Environmentally & VOC Compliant Paints. T.S.A. Capability New Facilities to be built south of the existing blasting & painting tunnel. Dedicated to blocks Consisting of two (2) parallel bays, each divided in three (3) separated areas: one (1) for grit blasting, one (1) for priming and one (1) for painting & curing. Each bay shall be 20m width by 120m long (3x40m). The overall building size shall be 120m x 40m.