Some Aspects of Digital Cameras Usage Andrej Yu. Sechin, Scientific Director, Racurs VIII th International Scientific and Technical Conference From Imagery.

Slides:



Advertisements
Similar presentations
Homework Answers P. 570 P   28. 6 4. /9
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
AP STUDY SESSION 2.
EuroCondens SGB E.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Objectives: Generate and describe sequences. Vocabulary:
1 Application of LiDAR technology in Vietnam Dr. Hoang Ngoc Lam MSc. Nguyen Thuc Anh Hanoi, 22 May 2007 MINISTRY OF NATURAL RESOURCES & ENVIRONMENT REMOTE.
David Burdett May 11, 2004 Package Binding for WS CDL.
Measurements and Their Uncertainty 3.1
CALENDAR.
1 1  1 =.
1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire? Mrs Mances Edition.
I can interpret intervals on partially numbered scales and record readings accurately ? 15 ? 45 ? 25 ? 37 ? 53 ? 64 Each little mark.
Ultra-Fast Mapping: Why? When?
Break Time Remaining 10:00.
The basics for simulations
Wehrli/Geosystem
PP Test Review Sections 6-1 to 6-6
Look at This PowerPoint for help on you times tables
MCQ Chapter 07.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Area of triangles.
Created by Mr. Lafferty Maths Dept.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Sets Sets © 2005 Richard A. Medeiros next Patterns.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Least Common Multiples and Greatest Common Factors
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
4.5 Solve Quadratic Equations by Finding Square Roots
Before Between After.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Static Equilibrium; Elasticity and Fracture
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Converting a Fraction to %
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
PSSA Preparation.
& dding ubtracting ractions.
From Imagery to Map: Digital Photogrammetric Technologies 13 th International Scientific and Technical Conference From Imagery to Map: Digital Photogrammetric.
Vasco Palmeirim Vector Maps - Production Flow ( Portugal - Portimão ) 1.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
From Imagery to Map: Digital Photogrammetric Technologies 13 th International Scientific and Technical Conference From Imagery to Map: Digital Photogrammetric.
VIIth International Scientific and Technical Conference From Imagery to Map: Digital Photogrammetric Technologies Bundle Adjustment Method in PHOTOMOD.
From Imagery to Map: Digital Photogrammetric Technologies 15 th International Scientific and Technical Conference From Imagery to Map: Digital Photogrammetric.
12/12/20071 Digital Resource Acquisition John Mootz, APFO Charlotte Vanderbilt, APFO.
Presentation transcript:

Some Aspects of Digital Cameras Usage Andrej Yu. Sechin, Scientific Director, Racurs VIII th International Scientific and Technical Conference From Imagery to Map: Digital Photogrammetric Technologies September 15-18, 2008, Porec, Croatia

Samples of Digital Cameras 150/ N/A 15 N/A (15000x15000)‏ RC / x 9400 UltraCam X 60/ x 5400 DSS 120/ x 8000 DMC 62.5/ ADS-40 (80)‏ F mm/pixPixel Size (µm)‏ Image Size Camera

GSD instead of image scale 1.RC-30 2.АФА 3.DMC 4.DSS GSD = H (m) / F (pixels)‏

GSD instead of image scale 0.74 FPS UltraCam 7.5 FPSVisionMap A FPSDSS FPSDMC N/AADS-40 (80)‏ Frame RateCamera Minimal flying speed Vmin = L*FPS = 0.4*FPS*H*(S/F)‏ Cessna minimal flying speed is 40 knots (or 21 m/s, or 75 km/h)‏ DMC minimal GSD ~ 4 cm, ADS-40 (SH-40) GSD ~ 15 cm (5 cm pan)‏

Flying Height and GSD 20 cm 3000 * cm 1500 * cm 750 m * 750 m RC-30/150/15µm 14.4 cm 2072 * cm 1036 * cm 518 m * 338 m UltraCam X 22.8 cm 1640 * cm 820 * cm 410 m *308 m DSS 20 cm 2700 * cm 1350 * cm 675 m * 400 m DMC 20.8 cm 2700 m * ∞ 10.4 cm 1350 m * ∞ 5.2 cm 624 m * ∞ ADS-40 (80)‏ 2000m1000m500mH/Camera

B/H ratio 0.61/0.31RC-30 F=150/ UltraCam X 0.25DSS 0.32DMC 0.29/0.49/0.78ADS-40 (80)‏ B/HCamera Z accuracy: dZ = c*GSD/(B/H)‏ c – image “quality” 60% overlap

Color in Digital Cameras For Small and Medium Format Digital Cameras Bayer filter All images are from

Color in Digital Cameras For Large Format Digital Cameras: Pansharpening 9UltraCam X 22DMC 1ADS-40 (80)‏ Pan/Multispectral pixel size ratioCamera

IMU/GPS, Direct GeoReferencing, LIDAR GPS Accuracy GPSDGPS PPP ( Precise Point Positioning PPP ( Precise Point Positioning)‏ Table 1: Errors (RMS) of GrafNav PPP Vertical Horizontal Flight 03 Flight 02 Flight 01 Errors (cm RMS)‏

IMU/GPS, Direct GeoReferencing, LIDAR LIDAR — may require the same or more accurate IMU LIDAR —can provide DEM without photogrammetric stereo processing LIDAR — can provide DEM without photogrammetric stereo processing Δφ= 1/F ~ (deg)‏

IMU/GPS, Direct GeoReferencing, LIDAR Real project: Kstovo, Nizhegorodskij region, GSD = 9 cm Orthophoto scale Orthophoto scale: 1 : Total images number: 1010 Direct Georeferencing accuracy: 17 cm Orthophoto scale: 1 : 500 Total images number: 294 Bundle adjustment accuracy : 10 cm All data was provided by Geokosmos company

What is upcoming? Many systems (hardware and software) for oblique aerial photography Many systems (hardware and software) for oblique aerial photography Pushbroom aerial camera «3-DAS-1» by Wehrli/GeoSystem with 45º views Pushbroom aerial camera «3-DAS-1» by Wehrli/GeoSystem with 45º views

Economical/Legal Aspects Economical aspects of Digital Cameras, GPS, IMU, Lidar Economical aspects of Digital Cameras, GPS, IMU, Lidar What Camera is best for…? What Camera is best for…? Digital Images Storage? Digital Images Storage?

Thank You for Attention