Test Procedure For INA226EVM

Slides:



Advertisements
Similar presentations
Help file for Installation and Opening Digital Contract Note(*FTIL) file from Verify utility.
Advertisements

VC709 Power Bus Reprogramming
Manual Software Upgrade Guide ◆ Notice 1. Use the full model name of TV when manually downloading software updates. Ex) 47LX9500-UA : The Full model name.
Introduction to Multisim ECE 1020 Professor Ahmadi.
DNR-322L & DNR-326.
Getting your Arduino to Work: Microsoft Windows 1.Install Arduino programming environment 2.Install Arduino Uno driver 3.Make sure you can download a program.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
5-9/12/2005 CPE How to format your computer and re-install Windows XP.
Bluetooth Presented by: Mohammad Shanehsaz June 2004 Adapted from BELKIN Bluetooth Software User Manual.
1 of 3 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
ESE Lab Computer based Temperature Control Sid Deliwala, ESE Labs.
VC707 Power Bus Reprogramming
Step 1 - Start your PC and place your Windows XP CD in your CD/DVD- ROM drive. Your PC should automatically detect the CD and you will get a message saying.
Aladdin Token Driver Installation Guide ***************************************
AC701 Power Bus Reprogramming © Copyright 2012 Xilinx.
Kirchhoff’s Laws. Changes from circuit in lab manual. 1. The DC voltage supply to use is +5V, not +9V as is shown in the lab manual. 2. A second circuit.
Dean Brock, Rebecca Bruce and Susan Reiser, CCSC SE 2009 Using Arduino Material taken from Todbot blog Bionic Arduino Todbot blog Bionic ArduinoTodbot.
Getting started with Microsoft.NET Gadgeteer Comberton Village College Gadgeteer Club.
9000U Quick Guide Marketing & RMA Department XELTEK 8/28/2015.
Advanced Digital Circuits ECET 146 Week 3 Professor Iskandar Hack ET 221B,
HUAWEI TECHNOLOGIES CO., LTD. Page 1 Firmware Upgrade & Dashboard Update of Huawei E220 USB Modem HUAWEI TECHNOLOGIES CO., LTD.
With Bluetooth Connectivity
Clock Board Test and Preliminary Acceptance Criteria Ciemat (Madrid), April 2009 Juan de Vicente, Javier Castilla, Gustavo Martínez.
1 Fluke DAQ Software Visual Demo Guide 2680A-APSW.
TM001028E Administrator Course TM001028E. Content Of Administrator Course Log-On to VaporTracer 2 Menus Interfacing with a computer Advanced Menu Functions.
High Speed Data Converter University
Meter Accuracy DC Volts ±(0.1% of the reading + 1 digit) DC Amps
Department of Electrical Engineering, National Taiwan Ocean University NuMicro MCU Learning Board SDK Installation 1/29/2015 Richard.
USB-Hipro Training Course ——Marketing Dept. Front view of digital Hearing Aid Programmer USB Rear view of digital Hearing Aid Programmer USB.
Data Studio. When you start the computer, you may get the message below. Close it by clicking on the x.
OPERATION SYSTEM (WINDOWS) Installing and Uninstalling.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
By Kanjimana B. Nawezi.  Installing iTunes  Setting up Your iPod  Importing songs from CDs into iTunes  Downloading songs from a website into iTunes.
Updating USB2ANY firmware
SIDE SCAN HARDWARE CONFIGURATION
1 /17 Installing and Configuring TaxWise © 2006, Universal Tax Systems, Inc. All Rights Reserved. Installing and Configuring TaxWise Objectives –In this.
SIDE SCAN HARDWARE CONFIGURATION HYPACK Connection Block Diagram GPS, single beam and tide data go into HYPACK ® SURVEY. Sidescan (with optional.
Downloading Procedures From the Web Importing Web Procedures Using ProEdit.
QCAMPform SETUP 1. The following window will appear with the execution of the “setup.exe” file. (Note: “setup.exe” file is extracted from the “cf2dsetup.zip”
Data Studio. Start/All Programs/Physics/Data Studio/Data Studio.
Troubleshooting Dashhawk Issues. Here's what you have to do to have the DashHawk run properly Go to the ACTUAL PROGRAM file (not the short cut)
 There are three things to get Trend Micro software for your PC. They are Download, Installation and Activation of the software license. Trend Micro.
Chapter Objectives In this chapter, you will learn:
How to Install Norton Antivirus in your Computer
Prototyping with Microcontrollers and Sensors
ZIMBRA DESKTOP USER MANUAL
GPRS Troubleshooting.
1. Make sure supply voltage is off, unplug the USB, and close the GUI.
WikID installation/training
ADS54J66EVM Test with TSW14J10EVM and ZC706
Computer and Information Technology for HKCEE
Setting Up and Performing a Calibration
Arduino Development for Beginners
What are the Steps to Connect Epson Printer to Laptop?
ADS54J20EVM Test with TSW14J10EVM and ZC706
What are the Steps to Connect Epson Printer to Laptop?
Introduction to Arduino Microcontrollers
Introduction to Arduino Microcontrollers
ADC32RF45EVM Test with TSW14J10EVM and ZC706
ADC32RF45 with KCU105 Internal Clock GHz.
ADC32RF45EVM Test with TSW14J10EVM and ZC706
McCrometer Nano Board Test Procedure
NI Data Acquisition (DAQ) Wiring and Connections
AC701 Power Bus Reprogramming
Gurpreet Singh CSE/IT.
How to create an Itunes account to your computer
Quick Start Guide   Installation GM Pro 7.4 5/10/2019.
Presentation transcript:

Test Procedure For INA226EVM 4/3/10 Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 1

Required Order Verify the Required Hardware and Software Install INA226EVM Software Verify Hardware Run INA226EVM Test Procedure Label Passing Units Ship Passing Units Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 2

Required Hardware and Software Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 3

Items provided by Texas Instruments No. Item Qty Description / Use 1 INA226EVM Completely built INA226EVM PCB with INA226 part inserted. 2 USB Extender Cable Connects to USB SM-DIG . 3 USB DIG Platform Sample of working USB SM-DIG platform used as a digital data acquisition system 4 Software and Documentation Disk Contains all software and documentation required for the INA226EVM test procedure. Items provided by Manufacture / Test Vendor 1 PC with windows operating system For test software. 2 Digital Multimeter Volt Meter to measure the voltage being supplied to the INA226 Test Board 3 Analog power supply Supplies power to Rshunt and Rload to test the INA226 4 Resistors 1 47ohm and 1 10kohm standard tolerance resistor. Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 4

EVM Installation Procedure Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 5

INA226EVM software is on the CD provided by Texas Instruments Double Click on the setup.exe file to begin installation of the test software Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 6

Allow the setup to initialize and click next Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 7

Accept both license agreements Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 8

Installing … Press Next on the Start Installation dialog, the program will install, then select Finish Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 9

Hardware Setup for Test Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 10

Connections for INA226EVM Test Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 11

Set Jumpers on Boards 12 Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 12

Connect Power and USB Cables Connect the 10-pin connector to the SM-DIG and PCB Connect USB extender cable to the board and PC The first time a USB DIG Board is plugged into your computer you may get a message Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 13

Apply INA226EVM Interface Board Power 10k Ω Resistor (RLOAD) 47Ω resistor (RSHUNT) Shunt Wire from Vin- to GND Apply 10v power supply voltage to terminal block 3. The high side of the supply should be connected to Vbus and the low side should be connected to GND. Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 14

Run Test Procedure 15 Introduction Verify Hardware Install Software Label Passing Units Ship Passing Units Conclusion 15

Launch the INA226 software that was recently installed Launch the INA226 software that was recently installed. The program should look like this: If it comes up with an error, ensure that the USB SM-DIG is securely plugged in. Also try restarting the program. Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 16

Program Setup Enter in the exact resistance of the Rshunt into the “Resistance” box and hit enter. Also, enter the Max current as “10m” and hit enter. Enter the value 109 into the calibration register box and hit enter. Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 17

Program Evaluation Select the “Read all Reg” buttons shown to the right. This should update the value at the bottom of the program. Ensure the values are close to the table below Channel Output Vbus ~10 V Shunt Voltage ~50mV Current ~1mA Power ~10mW Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 18

Label Passing Units If the designated part has passed the tests, label the passing unit with a QC sticker on the bottom of the board as shown below Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 19

Tested Device This test is designed to test the Read/Write capability of the INA226EVM. Once the test has been passed, the EVM is ready to be shipped. Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 20

Thank you for choosing Texas Instruments® Any questions, comments, or concerns should be directed to your TI representative. Introduction Verify Hardware Install Software Run Test Procedure Label Passing Units Ship Passing Units Conclusion 21