VALMONT WIND ENERGY, INC. MODULAR TOWER SYSTEMS. Presentation Overview Bigger Machines Modular Tower Systems (MTS) Transportation Restrictions Flexible.

Slides:



Advertisements
Similar presentations
1 EMBA-2, BUP EO Strategic Capacity Planning.
Advertisements

LTL (Less-than-Truckload)
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Technical & Economic Assessment Grid, Mini-grid & Off-grid Electrification Technologies Chubu Electric Power Co.,Inc. (CEPCO) Toyo Engineering Co. (TOYO)
LEAF SPRING.
Petra Rubber Powder Industries Ltd. The greener way to move forward.
Stripe Hog – NLB Comparison Fall Overall length - Maneuverability 45 Long, 58,000 lbs empty36 Long, 43,000 lbs empty.
Matrix SYSTEM OVERVIEW
B ONES O F S TEEL 100 YEARS IN BUSINESS +1MILLION TONNES OF STEEL 4 GENERATIONS E ST MW = 650,000 TONNES S TRENGTH & INNOVATION.
March 21, 2012 An Advanced Manufacturer in Steel California Steel Industries, Inc. Fontana, CA.
VERSATILITY The compact size and lightweight of the BIGMAX TC crane makes it useful in many different applications. Especially where space may be limited.
1 Wyoming Infrastructure Authority November 10, 2009 Superconductor Electricity Pipelines.
New Vi-Go Ladder Climbing Safety Systems provide the ultimate in safety with continuous fall protection when climbing fixed ladders. Systems are available.
JOHN DAY SCREEN AND PASSAGE PROGRAM: CURRENT ISSUES Presented by Michael Jensen John Day Shop Manager.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
RES Americas Kansas Wind and Renewable Energy Conference 2008.
Fundamentals of Cost Analysis for Decision Making
LONE STAR TECHNOLOGIES, INC. IPAA Annual Meeting October 25, 2005.
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
is a mobile protective steel barrier in a modular design.
DIRECTION DE LA RECHERCHE Marc FLORETTE Jeudi 29 mai 2008 The advantage of mCHP as a high efficiency gas solution for the residential market Gas industry.
Offshore Wind 2004 From Vindeby to Nysted A Manufacturer’s Experience Henrik Stiesdal Bonus Energy A/S.
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Staffan Engström, Ägir Konsult AB Stefan Lindgren, VG Power AB
Wind Turbine Towers for Greater Hub Heights Why higher wind turbine tower can contribute to increase energy output? Energy output is proportional to the.
© Siemens AG 2011 Hull Offshore Wind Workshop Siemens Wind Power A/S, Thomas Mousten, Offshore Wind Americas.
Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group.
Private-private partnership for the future turbine technology REpower 3.2M114 Michael Baranowski EWEA ( Copenhagen) 17. April 2012.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
Advantages of Lattice Towers
Hardinge Universal Turret Senior Design Project Project Sponsor: Hardinge Inc.
Global Manufacturing and Materials Management
Deep Water Offshore Wind Energy By Paul D. Sclavounos Horns Rev Wind Farm (Denmark) - Rated Power 160 MW – Water Depth 10-15m.
Converting Wind to Energy: The University of Maine at Presque Isle Wind Project By Sumul Shah Solaya Energy (A Division of Lumus) May 14, 2009.
Announcements Read Chapter 7 Quiz on HW 3 Today
What is a Hallmark Modular Home? A Hallmark Modular Home is designed, engineered and built in the controlled environment of a modern factory. It is computer.
IOWA STATE UNIVERSITY Department of Civil, Construction and Environmental Engineering Cost Estimate for Different Wind Turbine Technologies Bin Cai Wind.
By : PHILLIP, ANGUS, DASHAUN, JORDAN, AND MARCUS.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
THE POWER OF THE WIND. The wind: a key factor in world economy Wind needs clean, renewable and competitive sources of energy; wind is a very competitive.
World Sales Meeting Application
Off-Shore Wind Energy Technologies
Wind Energy and Wind Power
What is Electricity? Electricity is energy transported by the motion of electrons Electricity is energy transported by the motion of electrons **We.
1 PSI Insulators when the carrier pipe runs inside a casing.
Page 1 May 08 Energy – Fossil Power Generation 700°C Steam Turbine for highest efficiency Energy – Fossil Power Generation 700°C Steam Turbine – Challenges.
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
Introduction to Coal Coal is a fossil fuel that is created from the plants that have died. Coal is a non renewable energy source because it takes millions.
Wind Turbine Design Methods
How much levers can a crane have.. A crane, can also be known as a bridge crane, overhead crane is a type of machine used for lifting, generally equipped.
Industrialized Floating Foundation
An Overview of the Technology and Economics of Offshore Wind Farms
Cranes LETS LIFT THE WORLD TOGETHER We bring you more than any other brand in the world.
POWERFUL SOLUTIONS. GLOBAL FORCE. TQ700 Lightweight Torque Wrench Pump May, 2013.
Steel Wire Mesh Reinforced HDPE Pipe Roobuck Pty Ltd.
Various shapes and sizes of steel are available for different purposes. Blooms, billets, and slabs arrive at finishing mills, where they are formed into.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Welcome to Cedar Ridge Wind Farm Alliant Energy’s first fully owned-and-operated wind facility.
07/04/2013 Saint-Petersburg Danilin Aleksey Vladimirovich Patent pending
__________________________ © Cactus Moon Education, LLC. CACTUS MOON EDUCATION, LLC ENERGY FROM THE WIND WIND TECHNOLOGIES.
Federal Reserve Bank of Cleveland
WELCOME.
© 2018 Global Market Insights, Inc. USA. All Rights Reserved Structural Steel Market Research Analysis and Trends Report for
Siemens Gamesa Renewable Energy The best technology for your wind projects in Brazil 30 August 2017 © Siemens Gamesa Renewable Energy.
World Sales Meeting Application
- BEAM Sinusoidal Web Beam
ENERGY EFFICIENT MOTORS
SHANGHAI ROTORCOMP COMPRESSOR ONLY USE.
Physical Distribution Management and Strategy
Presentation transcript:

VALMONT WIND ENERGY, INC. MODULAR TOWER SYSTEMS

Presentation Overview Bigger Machines Modular Tower Systems (MTS) Transportation Restrictions Flexible site Management Standardized Transportation Loads Cost Benefits and Comparisons

Is BIGGER always better? Larger wind turbines –2.5 MW – 3 MW w/ 100 meter rotors Larger Tower –70 – 100 meters –100 – 200 tons Larger Trucks –Custom heavy haul trailers

Is BIGGER always better? (Cont.) Larger Cranes –400 – 600 ton crawlers with 400’ booms This all equals more efficient turbines… But also: More expensive transportation and installation

Over length – 85’ Over width – 14’ Over height – 14’ Over weight – 115,000 lbs Painted surfaces prone to scratch = RUST Tower is often an afterthought by the turbine manufactures Tower Transportation today Base section 80m tower

TRANSPORTATION Conventional 80m Tower: Over Length / Over Width / Over Height / Over Weight Cost: $60-80K for 500 Miles Transportation MTS: Ships Via Standard Flatbed Trailers Cost Savings on Freight: 50-70%

MTS: Modular Tower Systems -Broad Market Application -Mimics Industry Standard Tapered Design -Increased Bottom Diameter Options -Conventional Crane Installation -Low Freight Costs -Multiple Coating Options -‘Simple’, Low-Labor Content

MTS P RIMARY C OMPONENTS T-FLANGESTRANSITION CASTING PETALFRICTION PLATE

P ETALS Allows For Very Large Diameters Enables Increased Tower Heights Opportunity To Use Lower Strength Steel (A-36) Dependent Upon Use Of Bolted Connections Can Be Galvanized Thickness Range: 3/8”-1” For Towers Up To 2.5MW/80m

F RICTION P LATES Bolted Friction Connection Excellent Fatigue Characteristics Commonly Used in Bridge Construction World Wide Allows for Complete Installation from Inside the Tower

T-F LANGES Segmented Base Flange Design Addresses Freight & Field Installation Objectives Standard Anchor Bolt Connection to Foundation Friction Plate Connection to Tower

T RANSITION CASTING Cast Design Solves Geometry Transition Issues Mates Seamlessly with Turbine Base Flange Most Technically Complex Component of MTS Design

WIND ENERGY

Hub height: 65 meters Weight: lbs Sections: 4 Petals per section: 4 Standard trucks: 7 First installation: December 2 nd 2005

Competitive Advantages Standard transportation to site –$70,000 vs. $16,000 (500 miles) Site assembly –Less than $9,000 per tower Tower price FOB factory –Same or lower than conventional

Competitive Advantages (Cont.) Tower Installation –4 sections vs. 3 sections Savings are site dependent Faster lead time than conventional towers Working closely with Developers and Manufactures to optimize savings.

Recent Market Trends Surging fossil fuel prices put alternatives in the spotlight With low volatility, wind is becoming interesting to large utilities Disruption of the U.S. oil production as a result of Hurricane Katrina and Rita has put upward pressure on the oil prices

Recent Market Trends (Cont.) Elevated natural gas price and high volatility plus political initiatives, should spur broader interest for alternative energy among U.S. utilities. Wind is currently the lowest cost alternative Declining interest rates will improve wind energy competitiveness further.

THANK YOU!