4 Inputs input_a (double) input_b (double) input_c (double) monitor_state (uint32) 4 Outputs –fail_code (uint32) –monitor_id (uint32) –persistence_count.

Slides:



Advertisements
Similar presentations
A Brief Introduction to the Draft English Language Arts 8-12 IRP
Advertisements

Your performance improvement partner 2/25/
7B Unit 3 Finding your way Integrated skills. Millie is walking across the road.Millie is walking along the road.Sandy is walking over the bridge.Kitty.
Group - E Group Members Burdukov, Ilya Igorevich Lewczyk, Tomasz Sithambaram, Sasitharan Penmatcha, Bharath Steszewski, Andrew Joseph MAE412.
The following 5 questions are about VOLTAGE DIVIDERS. You have 20 seconds for each question What is the voltage at the point X ? A9v B5v C0v D10v Question.
From RegentsEarth.com How to play Earth Science Battleship Divide the class into two teams, Red and Purple. Choose which team goes first. The main screen.
Advanced Concepts in Scheduling SCH02 Stephen Rando.
Inside the binary adder. Electro-mechanical relay A solid state relay is a switch that is controlled by a current. When current flows from A to B, the.
1 Child Nutrition Services Understanding the Child Nutrition Tech Online Application/Agreement Step-By-Step REGION 3 Policy Update Meeting Thursday, February.
The Science of Biology The study of living things.
Created by Todd jenkins Amend This Cant Stop Progress Terminator Who am I Potpourri 100.
Created by Todd Jenkins Who am I Terms Potpourri Cause and effect Places 100 Main Screen.
PLAN DU COLLEGE JEAN MONNET RDC1 er étage. Prendre la feuille de papier millimétré dans le sens de la largeur :
PLAN DU COLLEGE JEAN MONNET RDC1 er étage. Prendre la feuille de papier millimétré dans le sens de la largeur :
NEXT A1B1C1D1E1F1 A4B4C4D4E4F4 A2B2C2D2E2F2 A5B5C5D5E5F5 A3B3C3D3E3F3 A6B6C6D6E6F6.
08/06/2001SPACE S.p.A1 Title: CULTURAL HERITAGE DATA MANAGEMENT Paolo Alongi.
Session No. 2 Introduction to Safety Management. The First Ultra-Safe Industrial System Ultra-safe system (mid 1990s onwards) Business management approach.
PIM ECMP Assert draft-hou-pim-ecmp-00 IETF 80, Prague.
Internal Auditing in the Government of Ontario, Canada Stuart Campbell, CIA, CGA, CISA Director, Internal Audit Government of Ontario, Canada.
M & M’s Counting Activity
Enter. The Scene Type text here Choice A1 Text for decisions Guidelines Guideline text Click on A, B or C A B C Choice B1 Choice C1 Click on A, B or C.
Mai N. And V. AdverbsAdject.VerbsNouns
Understanding Pupil Progress Information for parents.
Supply and Demand.
Page:Date: Code: P021/30A1 Clarity Chromatography Software Clarity 3.0 – New features.
Decoding Circuits Made by Adham Barghouti
EDIFICE 91 st Plenary Matthias GEHRKEN of Nokia Christian ZEININGER of mobilkom austria mobilkom-Nokia PIP Implementation (including Serial Number PIP)
YOUR FIVE-STAR TIMESHARE THERMAL, SPA APARTMENT IN TURKEY. Tel :
Bus 480 – Lecture 2 Transportation and Assignment models
SEQUENCING PROBLEMS.
Understanding Primary Assessment at Panaga School
1 Linked List Demo Node third = new Node(); third.item = "Carol"; third.next = null; Node second = new Node(); second.item = "Bob"; second.next = third;
Free Macro Download from i-present.co.uk by GMARK Ltd.i-present.co.ukGMARK my text Lorem for more information :
Overview Functional Testing Boundary Value Testing (BVT)
Testing “Multiple Conditions” with Decision Table Technique
Gossets student-t model What happens to quantitative samples when n is small?
The model: Canonical form:. Matrix form: Simplex method: BPBPB XBXB A1A1 A2A2 A3A3 A4A A3A3 A4A P(x)=
SOLID GEOMETRY. (d) Projections of Right & Regular Solids like; (Prisms, Pyramids, Cylinder and Cone) SOLID GEOMETRY Following topics will be covered.
LT Codes Paper by Michael Luby FOCS ‘02 Presented by Ashish Sabharwal Feb 26, 2003 CSE 590vg.
Concepts and Vocabulary
U3A1 Windows 7 Professional “ XP Mode ”. U3A2 Microsoft promotional text for XP Mode “Seamless applications Publish and launch applications installed.
Create and Operate EMS Internal Information Business Unit Staff EM Laws Environmental Reports EM Certification NGOs Management Company Policies EA Group.
Grades 1-4. K-4 Standards: A1,2,9 – Grade 1 Vocabulary Identify basic computer parts: computer, monitor, keyboard, mouse Uses proper vocabulary for on-screen.
Title Slide Directions:. My Jeopardy Category 1 Category 2 Category 3 Category 4 Category Final Jeopardy.
An S-IAM Application ‘Road-maps’ and Observations towards Capacity Building By Nigel Lowe DBSA Technical Analyst Tel
C1C2 C3C4C5C6 C7 25 ft. 50 ft. 45 ft. 25 ft. Hose #1Hose #2Hose #3Hose #4Hose #5Hose #6 Hose #3 Designated Busted Hose Designated Drop Area of Spare Hose.
Economics (H) Chapter 1 Review Game Factors of Production Production Possibilities Goods & Services Productivity & Growth Value & Wealth MISC
HIMSS/RSNAParticipant Workshop, Oct 2004 Nuclear Medicine Image (NM) Integration Profile Kevin O’Donnell IHE Radiology Technical Committee Member, Toshiba.
Radiology Participant Workshop, Oct 2004 Nuclear Medicine Image (NM) Integration Profile Kevin O’Donnell IHE Radiology Technical Committee Member, Toshiba.
Functional Dependencies (FDs)
1 Performance Monitoring A Guide for Larger Local Councils (First Draft)
An Update for What Is Greater Dartmoor LEAF? A Local Action Group composed of dedicated volunteers Representing the local community Responsible.
ENGIN112 L15: Magnitude Comparator and Multiplexers October 6, 2003 ENGIN 112 Intro to Electrical and Computer Engineering Lecture 15 Magnitude Comparators.
SOL 4.21 Patterns By, Jennifer Sagendorf ITRT-Suffolk Public Schools.
The simple built-in data types of the C language such as int, float, - are not sufficient to represent complex data such as lists, tables, vectors, and.
Adders Module M8.1 Section 6.2. Adders Half Adder Full Adder TTL Adder.
University of Texas At El Paso
Shortest Paths (1/11)  In this section, we shall study the path problems such like  Is there a path from city A to city B?  If there is more than one.
XDI RDF Cell Graphs V This document introduces a notation for graphing XDI RDF statements called cell graphing. The motivation is to have an.
INSTRUCTION ON HVBMU CONNECTION & DEBUGGING Domestic Engineering Department of Engineering System.
22 22 33 33 11 11 X1 X2 X3 X4 X5 X6 X7 X8 X9                    2,1  3,1  3,2 2,1 1,1 3,1 4,2 5,2 6,2 7,3 8,3 9,3.
Figure1.5 Elevator input and output
5 Qubits Error Correcting Shor’s code uses 9 qubits to encode 1 qubit, but more efficient codes exist. Given our error model where errors can be any of.
SITES SOFTWARE APPLICATION SEMINAR __________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS SITES.
A System Sensitivity Example Friday 19 Sept 2014 EE 401: Control Systems Analysis and Design Example #2:  Nominally, K = 5 and H =  Determine the.
Sequential logic design principles
Evaluating Logarithms
Exponential and Logarithmic Forms
See requirements for practice program on next slide.
Modeling Text-Based Requirements and their Relationship to Design
Presentation transcript:

4 Inputs input_a (double) input_b (double) input_c (double) monitor_state (uint32) 4 Outputs –fail_code (uint32) –monitor_id (uint32) –persistence_count (uint32) –totalizer_count (uint32) Copyright © 2010 by Lockheed Martin CorporationPage 1 of 2

triple_monitor block violates RM- 002 requirement Copyright © 2010 by Lockheed Martin CorporationPage 2 of 2

ExampleThe following simple problem clarifies this exponentially large challenge problem. Apply the following transition conditions to the state diagram (Figure below): C1: Sensors A & B differ by more than a threshold value. C2: Sensors B & C differ by more than a threshold value. C3: Sensors A & C differ by more than a threshold value. C4: One of the above persists more than one interval. C5: One of the above persists longer than the tolerable limit.

Figure 1. Clarifying Simplified Example Problem (see text previous slide). A1: No Failure Monitor No Pending Failures persistent_count 0 A2: Failure Pending But No Differences persistent_count-- A3: Single Failure Monitor Only One Difference A4: Failure Pending persistent_count++ totalizer_count++ A5: Failure Latched (Branch B) fail_code 2 persistent_count 0 monitor_id 0 A6: Failure Latched (Branch A) fail_code 4 persistent_count 0 monitor_id 0 A7: Failure Latched (Branch C) fail_code 1 persistent_count 0 monitor_id 0 A8: All Branches Different totalizer_count++ Conditions C1 C2 C3 C4 C5 F F F F Φ F F F T Φ T F F Φ Φ F T F Φ Φ F F T Φ Φ F T T Φ F T F T Φ F T T F Φ F T T F Φ T T F T Φ T F T T Φ T T T T Φ Φ