Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Sales and Capacity Planning
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Industrial Facilities Design (7 th Term, Batch 2009)  28/3/2012 11  lectur # 31 & 32.
Chapter 13 Capacity and Aggregate Planning. Aggregate Production Planning (APP) Matches market demand to company resources Matches market demand to company.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
IES 371 Engineering Management Chapter 14: Aggregate Planning
Aggregate Production Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Operations Management Aggregate Planning Chapter 13
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
Manufacturing’s Objectives
Strategic Capacity Planning & Aggregate Planning
Supply Chain Management (SCM) Aggregate Planning
Sales and Capacity Planning
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 11 Capacity Planning And Aggregate Production Planning.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Lesson 16 Aggregate Planning
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Capacity and Aggregate Planning.  Excellent forecasting and planning models - results in multiple ticket plans for Florida residents  Warehousing &
Chapter 13 – Aggregate Planning
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Chapter 14 Sales and Capacity Planning. Lecture Outline The Sales and Operations Planning Process Strategies for Adjusting Capacity Aggregate Planning.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Operations Management Aggregate Planning
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
1 Chapter 13 Production Planning Supplemental Slides.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
© 2007 Pearson Education Sales and Operations Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Aggregate Sales and Operations Planning
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
BUAD306 Aggregate Planning.
Operations Management
13 Aggregate Planning.
Beni Asllani University of Tennessee at Chattanooga
Sales and Operations Planning
Fundamentals of Production Planning and Control
Dr Sh Salleh bin Sh Ahmad
Capacity and Aggregate Planning
Capacity and Aggregate Planning
Capacity and Aggregate Planning
Capacity and Aggregate Planning
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Presentation transcript:

Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor E. Sower, Ph.D., C.Q.E.

© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 13 Capacity And Aggregate Planning

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Capacity Planning Establishes overall level of productive resources Affects lead time responsiveness, cost & competitiveness Determines when and how much to increase capacity

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Capacity Expansion Volume & certainty of anticipated demand Strategic objectives for growth Costs of expansion & operation Incremental or one-step expansion

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Capacity Expansion Strategies Units Capacity Time Demand Units Capacity Time Demand Units Capacity Time Demand Units Incremental expansion Time Demand Capacity lead strategy Capacity lag strategy Average capacity strategyIncremental vs. one-step expansion One-step expansion

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses demand, resources, and capacity in general terms Develops a strategy for economically meeting demand Establishes a company-wide game plan for allocating resources

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted, backordered, or lost Capacity Constraints Size of Workforce Production per month (in units or $) Inventory Levels Demand Forecasts

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Strategies for Meeting Demand 1. Use inventory to absorb fluctuations in demand (level production) 2. Hire and fire workers to match demand (chase demand) 3. Maintain resources for high demand levels 4. Increase or decrease working hours (over & undertime) 5. Subcontract work to other firms 6. Use part-time workers 7. Provide the service or product at a later time period (backordering)

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Strategy Details Level production - produce at constant rate & use inventory as needed to meet demand Chase demand - change workforce levels so that production matches demand Maintaining resources for high demand levels - ensures high levels of customer service Overtime & undertime - common when demand fluctuations are not extreme

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Strategy Details Subcontracting - useful if supplier meets quality & time requirements Part-time workers - feasible for unskilled jobs or if labor pool exists Backordering - only works if customer is willing to wait for product/services

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Level Production Time Production Demand Units

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chase Demand Time Units Production Demand

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e APP Using Pure Strategies Hiring cost = $100 per worker Firing cost = $500 per worker Inventory carrying cost = $0.50 pound per quarter Production per employee = 1,000 pounds per quarter Beginning work force = 100 workers QuarterSales Forecast (lb) Spring80,000 Summer50,000 Fall120,000 Winter150,000

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Level Production Strategy SalesProduction QuarterForecastPlanInventory Spring80,000100,00020,000 Summer50,000100,00070,000 Fall120,000100,00050,000 Winter150,000100, ,000140,000 Cost = 140,000 pounds x 0.50 per pound = $70,000

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chase Demand Strategy SalesProductionWorkersWorkersWorkers QuarterForecastPlanNeededHiredFired Spring80,00080, Summer50,00050, Fall120,000120, Winter150,000150, Cost = (100 workers hired x $100) + (50 workers fired x $500) = $10, ,000 = $35,000

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Strategies for Managing Demand Shift demand into other periods –incentives, sales promotions, advertising campaigns Offer product or services with countercyclical demand patterns –create demand for idle resources

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Demand Distortion along the Supply Chain The bullwhip effect

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Hierarchical Planning Process Items Product lines or families Individual products Components Manufacturing operations Resource level Plants Individual machines Critical work centers Production PlanningCapacity Planning Resource Requirements Plan Rough-Cut Capacity Plan Capacity Requirements Plan Input/Output Control Aggregate Production Plan Master Production Schedule Material Requirements Plan Shop Floor Schedule All work centers

Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Aggregate Planning for Services 1. Most services can’t be inventoried 2. Demand for services is difficult to predict 3. Capacity is also difficult to predict 4. Service capacity must be provided at the appropriate place and time 5. Labor is usually the most constraining resource for services