Planning and Executing an Effective Pivot Plan Course Number: 13201-05 Credit Hours: 2.5 Hours Link:

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Adders Used to perform addition, subtraction, multiplication, and division (sometimes) Half-adder adds rightmost (least significant) bit Full-adder.
AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
1 Hyades Command Routing Message flow and data translation.
David Burdett May 11, 2004 Package Binding for WS CDL.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Solve Multi-step Equations
Student & Work Study Employment Facts & Time Card Training
Break Time Remaining 10:00.
This module: Telling the time
Find the total of 5 hours 10 minutes 3 hours 23 minutes 6 hours 39 minutes Click for solution + hours minutes7214 More than 60 minutes? YES: convert 60.
The basics for simulations
CityBus Reliability Jimmy Khorshid – Daniel Richards – Nick Saraniecki – Richie Schultz –
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
2007 Pearson Education, Inc. All rights reserved C Structures, Unions, Bit Manipulations and Enumerations.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
15. Oktober Oktober Oktober 2012.
Created by Mr. Lafferty Maths Dept.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
1 Displaying Open Purchase Orders (F/Y 11). 2  At the end of this course, you should be able to: –Run a Location specific report of all Open Purchase.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Page 1 of 43 To the ETS – Bidding Query by Map Online Training Course Welcome This training module provides the procedures for using Query by Map for a.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
1 How Do I Order From.decimal? Rev 05/04/09 This instructional training document may be updated at anytime. Please visit and check the.
Subtraction: Adding UP
: 3 00.
5 minutes.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Weisburd, Lawton, Ready, Rudes, Cave, and Nelson Presented by Breanne Cave 1.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Planning and Executing an Effective Pivot Plan. Pivot Coaching Module Define –What is pivoting and why is it used. Plan –Identify Opportunity and plan.
Presentation transcript:

Planning and Executing an Effective Pivot Plan Course Number: Credit Hours: 2.5 Hours Link:

Pivot Coaching Module Define –What is pivoting and why is it used. Plan –Identify Opportunity and plan ahead. Execute –Using the DOIS tools Three Components

Define Pivot Coaching Module

Define What is Pivoting? Pivoting is defined as dividing the office and street activity of a route into sections which are assigned to individual carriers.

Pivot Coaching Module Define When is Pivoting used? 1) Cover Vacant assignments. 2) Provide auxiliary assistance to an over- burden route. Pivoting should capture Undertime and should only result in overtime as a last resort.

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG Low Volume Period Opportunity March, April, and May volumes are where we adjust routes to OT or Aux Assistance Undertime % BASE PERFORMANCE 1.6 M 2.7 M 3.6 M 2.2 M 2.4 M 1.5 M 1.2 M 1.1 M 1.0 M.5 M.8 M.9 M Qtrs Qtrs Undertime BASE FY 2006 Qtrs 3/4 - We Never Performed Below Base Hours FY 2006 Qtrs 3/4 - We Never Performed Below Base Hours

How can DOIS assist in the capture of undertime through pivoting? Pivot Coaching Module Define

Strategy-1 Quality Pivot Plans ROUTE 01 ROUTE 02 ROUTE 03 ROUTE 04 ROUTE 05 ROUTE 06 ROUTE 07 ROUTE 08 ROUTE 09 DELIVERY TERRITORY DOIS SEGMENTS ALL STREET DELIVERY TERRITORY BY ROUTE DOIS SEGMENTS ALL STREET DELIVERY TERRITORY BY ROUTE

Strategy-1 Quality Pivot Plans ROUTE 01 ROUTE 04 ROUTE 07 ROUTE 08 ROUTE 09 ROUTE 03 ROUTE 02 ROUTE 06 ROUTE 05 EXAMPLE: Below is the Street Delivery for Route 3 The Pivot Plan functionality in DOIS allows a supervisor to divide each routes street delivery into logical groups The Pivot Plan functionality in DOIS allows a supervisor to divide each routes street delivery into logical groups

PIVOT PLAN MAINTENANCE _ x Strategy-1 Quality Pivot Plans LG 0:23 0:27 0:19 0:29 0:17 0:22 0:25 0:15 0:28 0:23 0:31 0:17 P&L West Main St 122 West Main St 18 Thomas Avenue 39 Washington Avenue 11 Willow Street 10 Park Avenue 25 Lincoln Avenue 55 Ellicott Avenue 225 Bland Road 35 Montclair Avenue 35 Holland Avenue 23 Holland Avenue 126 West Main St 212 West Main St 98 Thomas Avenue 43 1/2 Washington Ave 21 Lewis Avenue 44 Park Avenue 6 Park Avenue 19 Ellicott Avenue 27 Cumberland Road 4 Montclair Avenue 2 Olin Avenue 24 Holland Avenue DurationDelivery Poss Dels Last Delivery Address First Delivery Address ROUTE 03 DOIS can then determine the time duration of each of the logical groups the supervisor has created, and provide the total number of deliveries along with the first and last delivery address of each group DOIS can then determine the time duration of each of the logical groups the supervisor has created, and provide the total number of deliveries along with the first and last delivery address of each group

Strategy-1 Quality Pivot Plans ROUTE 01 ROUTE 04ROUTE 07ROUTE 08ROUTE 09 ROUTE 03ROUTE 02ROUTE 06ROUTE Hrs

Plan Pivot Coaching Module

Pivot Planning The National City Delivery Pivot Opportunity Model: Is your starting point in planning your pivots. Will project the weekly opportunity expressed in Full-time Equivalent Routes.

Route Pivoting Opportunity Model What does CDPOM Identify? CDPOM identifies a 52 week by week trend using common productivity assumptions, such as: –Total credit for actual cased letters and flats –100% to Standard performance for cased volume –Actual Current DPS Performance –Established Base Fixed Office Time –Established Base Street SEI –Credit for each new possible delivery at Base SEI rate

Route Pivoting Opportunity Model What does CDPOM Identify? CDPOM allows for National, Area, Cluster, MPOO, Post Office, and Station drill down CDPOM Identifies current YTD Staffing performance to Base Equivalent Routes and Earned daily staffing CDPOM provides trend line analysis for Hours, Overtime and Cased Volume CDPOM Establishes a Post Rate Increase Volume Impact Goal performance expectation

Route Pivoting Opportunity Model

DOIS Base= routes per day Projected earned = routes per day Plan to Pivot 1.39 routes per day on undertime in week 31

Pivot Coaching Module Pivot Planning Success in delivery operations is defined largely before the first carrier arrives. Successful capture of undertime requires planning ahead !!!!!!

Pivot Coaching Module Pivot Planning Office Pivot Ground Rules to consider when planning: Plan to set-up the pivoted routes to coincide with the other routes. Plan the pull-down of the route as part of the pivot.

Pivot Coaching Module Pivot Planning Street Pivot Ground Rules to consider when planning: All pivot sections go to the street with the assigned carrier(s) in the morning. Instruct the carrier as to when they are to deliver the pivot.

Pivot Coaching Module Pivot Planning Remember……………………. The more you plan ahead, the more likely you are to capture the time. Use a worksheet to plan your pivot. A worksheet can be as simple as a printed copy of the DOIS pivot plan.

Your plan may not work out entirely the way you thought. However, the majority of your work will be done. Carriers will be aware of expectations Pivot Coaching Module Pivot Planning

Pivot Coaching Module Pivot Planning Considerations when scheduling target routes to pivot: o Knowledge of the routes o Knowledge of the people o Knowledge of the mail flow

Pivot Coaching Module Pivot Planning – Know the routes When planning for pivot routes consider vacancies that you already know.

Pivot Coaching Module Pivot Planning – Know the routes Additional Considerations when planning for pivots: o a good pivot plan. o geographically advantageous routes. o straight park and loop, mounted residential, and centralized residential. o stable routes with minimal COAs or high UBBM volume.

Pivot Coaching Module Pivot Planning – Know the people When planning for pivot routes consider who you have available. Maximize their strengths. DOIS can assist you in determining what carriers know what routes.

At the Supervisor Workbench simply double-click the route that you are planning to pivot. We will pivot route for this example. Pivot Coaching Module

You will then be provided a route detail listing. By clicking on the assign assistance on the office tab, you will be provided a carrier information list. Pivot Coaching Module

Under the Days Cased Column you find that Bowley has cased route times. Pivot Coaching Module

Pivot Planning – Know the Mail Flow When planning for pivot routes consider the mail flow. Heavy volume days Light volume days Scheduled mailings Curtailment of Standard A volumes

Execute Pivot Coaching Module Daily Execution

1. You already have a plan to pivot ahead of time. 2. On the morning of the plan to pivot, you need to determine that days actual workload. Pivot Coaching Module Daily Execution

The DOIS Workload Status Report provides a snapshot of the daily workload on a route by route basis. From this report you can determine the opportunity for the capture of undertime available for each carrier. Pivot Coaching Module Daily Execution

Pivot Coaching Module Daily Execution

Does the workload match your previously developed pivoting plans ? If yes, then execute your plan! Pivot Coaching Module Daily Execution

If not: you may have more undertime available than planned, OR you may have less undertime available than planned. Either way, you need to be able to adjust your plan. Pivot Coaching Module Daily Execution

If todays workload has more undertime than planned Carriers Pivoting Undertime you planned for: Todays Actual Workload FTR Carrier on route 1 -1:00-1:15 FTR Carrier on route 2 -:45-1:00 FTR Carrier on route 3 -1:00-1:25 PTF Carrier hours on FT route 4 5:154:20 Undertime Captured -2:45-3:40 Pivot Coaching Module Daily Execution – Adjusting Your Plan If todays workload has less undertime than planned Carriers Pivoting Undertime you planned for: Todays Actual Workload FTR Carrier on route 1 -1:00-:30 FTR Carrier on route 2 -:45-:15 FTR Carrier on route 3 -1:00-:30 PTF Carrier hours on FT route 4 5:156:30 Undertime Captured -2:45-1:30

However, if standard A volume were to be curtailed, your original plan could be executed. Pivot Coaching Module Daily Execution

Pivot Coaching Module Daily Execution – Adjusting Your Plan Carriers Pivoting Undertime you planned for: Todays Actual Workload Time equivalent for Standard A Curtailed Todays Actual undertime after curtailing FTR Carrier on route 1 -1:00-:30 -1:00 FTR Carrier on route 2 -:45-:15-:30-:45 FTR Carrier on route 3 -1:00-:30 -1:00 PTF Carrier hours on FT route 4 5:156:305:15 Undertime Captured -2:45-1:30-2:45

Assigning Pivots in DOIS From the Supervisor Workbench –SELECT Street Pivoting

Assigning Pivots in DOIS Use the radio button to select your method Use the Pull down box to select your route

Assigning Pivots in DOIS Select the Display Pivot Plan

Assigning Pivots in DOIS Hold the shift button down to assign multiple sections in a row at one time to a single carrier, or select Combine Sections to create a larger section.

Assigning Pivots in DOIS Select the appropriate carrier. If the assigned section projects OT. Select the appropriate reason.

Route Pivoting Opportunity Model DOIS Base= routes per day Earned Equivalent Routes = Actual Equivalent Routes = Opportunity lost = 1.58 rtes per day

Unit Daily Performance Report Week 30 FY 2007

Sample of Daily Average Variances