Project Manager Contact person Dr. Viktor Wesztergom Prime contractor Technical manager: Eszter Szűcs Contractual officer: Ilona Deibler Tímárné Prime.

Slides:



Advertisements
Similar presentations
WHO, WHAT, HOW Your Internal Audit Team …by your side. …at your service. …in your best interests.
Advertisements

Reform of the University governance and management structure – first project year Place: University of Gent Date: – Participants: one.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
PBIS Coaches Training Day 4 Rebecca Mendiola, PBIS Coordinator Santa Clara County Office of Education.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
Introducing Regulatory Impact Analysis into the Turkish Legal Framework Prime Minister’s Office, Better Regulation Group The Project Implementation Team.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Development and Quality Plans
Development plan and quality plan for your Project
Electrical Engineering Capstone Courses EE-4BI6 Electrical and Biomedical Engineering  Dr. Hubert deBruin EE-4OI6 Electrical and Computer Engineering.
QEC initiates SA through the dean one semester prior to the assessment Department forms the PT that will be responsible for preparing SAR QEC reviews.
Lecture 4: Phases of Engineering Design
Your Internal Audit Team …by your side …at your service …in your best interests.
Implementing ISO 9001 Our project plan Copyright ©2008 The 9000 Store.
Understanding Information Systems. Information System (IS) An IS is a combination of people, hardware, software, computer networks, and data that organizations.
The Preparatory Phase Proposal a first draft to be discussed.
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Role and Responsibilities of Field Monitors David Njue, Investment.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Electrical and Computer Engineering Senior Design John Peeples, Ph. D., P.E. Professor and Department Head.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Software Testing. What is Testing? The process consisting of all life cycle activities, both static and dynamic, concerned with planning, preparation.
Office of Pipeline Safety Qualifications of Individuals: Protocol Review Integrity Management Workshop July 23-24, 2002.
CIP Quality System for Genebank ISO 17025
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
 Build a Bridge?  Make a Robot?  Work on a Computer?  Drive a Train?  Repair Car Engines?
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Ensures project work is divided evenly and everyone has the necessary resources to keep the project on track as well as making sure all members contribute.
May 2004NTUA1 National Technical University of Athens EGEE Project 3 rd Parties Kick off Meeting, Athens, May 27-28, 2004 Dr. Costis Christogiannis Telecommunications.
Independent Expert Program Review (IEPR) February 2006.
LBT Q Engineering Review ESW Engineering Software.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Esprit INCO-Copernicus CEC DG III project n° EMGnet Kick Off meeting INRIA Rhône-Alpes December
ERPTS Implementation Plan Prepared by R. Crabtree June 2008.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
1.ARCHITECT 2. ATHLETE 3.TEACHER. ARCHITECT FAST LOOK Salary * * * * * excellent Occupation size * * above average Job stability * * above average ARCHITECT.
Unit 33 Computer Technology For Music 1 Develop an understanding of the terminology associated with computer technology identify with reference to examples.
Monitoring Visit to NatRisk Project
WLTP IWG ISC Taskforce: Starting note
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Supporting quality devices
Director| Program & Technical Services
ISO/IEC
Fundamentals of Information Systems, Sixth Edition
Ministry of Water Resources, River Development and Ganga Rejuvenation
local INVENT Meeting progress in the Project Oct
Status and Development of Regulatory Infrastructure in Iraq
Request for Proposal (RFP)
COST Action Measuring Homelessness in Europe
Optimization for Airport Facilities
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
LUCAS SURVEY 2015: an update on current survey
Delft University of Technology
The basics ESSnet on SDMX prepared in 2008/2009
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Independent Expert Program Review (IEPR)
(System Development Life Cycle)
Resource Pool Teams Steering Committee Process Owners Project Sponsors
The Survival Plan.
PBIS Coaches Training Day 4
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Project Manager Contact person Dr. Viktor Wesztergom Prime contractor Technical manager: Eszter Szűcs Contractual officer: Ilona Deibler Tímárné Prime Contractor Study leader: Dr. László Bányai Study team: Dr. Viktor Wesztergom, geophysical expert Dr. János Kalmár, software development Dr. Ernő Prácser, software development Dr. István Lemperger, geophysical expert Ildikó Eperné Pápai, geophysical expert Eszter Szűcs, geodetic expert Dóra Bán, geophysical expert Tamás György Nagy, computational expert Team tasks: Geometric design of integrated benchmarks Manufacturing of benchmarks Selection of test and practical sites Development of data integration software Demonstration of proposed procedure 1 th Sub-Contractor Study leader: Prof. Andrew Hooper Study team: … Team tasks: Upgrading of PSI software Coaching and training of PSI software Contribution to test computation 2 nd Sub-Contractor Study leader: Prof. Lajos Nagy Study team: … Team tasks: Electrical design of SAR backscatters Numerical and laboratory tests Feasibility studies

Project Manager Contact person Dr. Viktor Wesztergom Prime contractor Technical manager: Eszter Szűcs Contractual officer: Ilona Deibler Tímárné Prime Contractor Study leader: Dr. László Bányai Study team: Dr. Viktor Wesztergom, geophysical expert Dr. János Kalmár, software development Dr. Ernő Prácser, software development Dr. István Lemperger, geophysical expert Ildikó Eperné Pápai, geophysical expert Eszter Szűcs, geodetic expert Dóra Bán, geophysical expert Tamás György Nagy, computational expert Team tasks: Geometric design of integrated benchmarks Manufacturing of benchmarks Selection of test and practical sites Development of data integration software Demonstration of proposed procedure 1 th Sub-Contractor Study leader: Prof. Andrew Hooper Study team: … Team tasks: Upgrading of PSI software Coaching and training of PSI software Contribution to data evaluation 2 nd Sub-Contractor Study leader: Prof. Lajos Nagy Study team: … Team tasks: Electromagnetic design of SAR backscatters Numerical and laboratory tests Feasibility studies Contribution to data evaluation

Geometric design of integrated benchmarks Electromagnetic investigation of TCR backscatters Upgrading of PSI software Manufacturing of benchmarks Selection of test site in Sopron Coaching and training of PSI software 1 th Progress meeting Development of data integration softwares 2 nd Progress meeting Selection of practical test sites in Hungary Continuous data processing Demonstration of developed procedures Preparation of necessary documentations Closing workshop Final meeting End Start Kick-off meeting Initial workshop