Job Order Cost Accounting Chapter 20 Cost Systems There are two basic systems used by manufacturers to assign costs to their products: –Process costing.

Slides:



Advertisements
Similar presentations
Job Order Costing Chapter 4.
Advertisements

Job Order Cost Accounting
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 2 Systems Design: Job-Order Costing.
Systems Design: Job-Order Costing
Systems Design: Job-Order Costing
Job Order and Process Costing
Basics of Job-Order Costing
Chapter 2 Job-Order Costing and Modern Manufacturing Practices
REVIEW of Chapter 14 We begin this chapter by describing a cost accounting system. We then explain the procedures used to determine costs using a job.
Product Costing in Service and Manufacturing Entities
Systems Design: Job-Order costing Chapter 3. © The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Types of Costing Systems Used to Determine Product.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 2 Systems Design: Job-Order Costing.
Systems Design: Job-Order Costing 11/09/04
4 - 1 Job Order Costing Chapter Learning Objective 1 Describe the building-block concepts of costing systems.
Systems Design: Job-Order costing Chapter 3. © The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Types of Costing Systems Used to Determine Product.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Product Costing and Cost Accumulation in a Batch Production.
CHAPTER 15 Job Order Costing & Analysis. Cost Accounting Systems determine the costs associated with products (or services). ________ Cost System (this.
Job Order Costing and Analysis
19 Job Order Costing Accounting 26e C H A P T E R Warren Reeve Duchac
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Chapter 2 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Systems Design: Job-Order Costing.
Chapter 2 Systems Design: Job-Order Costing. © The McGraw-Hill Companies, Inc., 2005 McGraw-Hill /Irwin Process and Job-Order Costing Process Costing.
REVIEW of Chapter 14. Completed products for sale. Materials waiting to be processed. Can be direct or indirect. Partially complete products. Material.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 13 Job Costing Systems.
20 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Job Costing Chapter 20.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Job Order Cost Accounting Chapter 19.
3 Chapter Three Product Costing and Cost Accumulation in a Batch Production Environment.
Financial and Managerial Accounting John J. Wild Third Edition John J. Wild Third Edition McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies,
Systems Design: Job-Order Costing Chapter 3 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Product Costing and Cost Accumulation in a Batch Production.
Systems Design: Job-Order costing Chapter 3. © The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hil2 Types of Costing Systems Used to Determine Product.
18-1 CHAPTER 18 M ANAGERIAL A CCOUNTING C ONCEPTS /J OB C OSTING.
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill/Irwin Chapter 19 Job Order Costing.
© The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 3 Cost Accumulation for Job-Shop & Batch Production Operations.
CHAPTER 3 Product Costing and Cost Accumulation in a Batch Production Environment Chapter 3: Product Costing and Cost Accumulation in a Batch Production.
Chapter 17 Job Order Costing
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition Copyright © 2011 by The McGraw-Hill.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Three Systems Design: Job-Order Costing.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Product Costing and Cost Accumulation in a Batch Production.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Product Costing and Cost Accumulation in a Batch Production.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Chapter 2 Systems Design: Job-Order Costing PowerPoint Authors:
Systems Design: Job-Order Costing Chapter 3. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Types of Costing Systems Used to Determine Product.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Job-Order Costing Chapter Types of Costing Systems Used to Determine Product Costs Process Costing Job-order Costing  Many different products.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective Distinguish actual costing from normal costing.
Systems Design: Job-Order costing Chapter 2. © The McGraw-Hill Companies, Inc., 2002 Irwin/McGraw-Hill 2 Types of Costing Systems Used to Determine Product.
Chapter Three Job-Order Costing. 3-2 Types of Product Costing Systems Process Costing Job-order Costing  A company produces many units of a single product.
Product Costing and Cost Accumulation in a Batch Production Environment Chapter 3 Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction.
Product Costing and Cost Accumulation in a Batch Production Environment Chapter 3 McGraw-Hill/Irwin Copyright © 2014 McGraw-Hill Education. All rights.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Chapter 2 Systems Design: Job-Order Costing.
Chapter Three Job-Order Costing. 3-2 Types of Product Costing Systems Process Costing Job-order Costing  A company produces many units of a single product.
Job-Order Costing: A Microsoft Excel-Based Approach
Chapter 17 Job Order Costing
Systems Design: Job-Order Costing
Chapter 3 Costing Systems: Job Order Costing
Job-Order Costing: Cost Flows and External Reporting
Systems Design: Job-Order costing
Job Order and Process Costing
Job Costing 1 1.
Financial and Managerial Accounting
Systems Design: Job-Order Costing
Job Order Costing and Analysis
Chapter 2 Job Costing.
Chapter 17 Job Order Costing
Chapter 4.
Presentation transcript:

Job Order Cost Accounting Chapter 20

Cost Systems There are two basic systems used by manufacturers to assign costs to their products: –Process costing –Job Order costing

Process Costing Used by companies that produce large numbers of identical units –Breakfast cereal –Paper mills –Oil refining

Job Order Costing Used for production of large, unique, high-cost items Built to order rather than mass produced –Special-order printing – Building construction –Hospitals – Law firms

Receive orders from customers. Schedule jobs. Order materials. Begin production. Events in Job Order Manufacturing

Goods in Process Cost of Goods Sold Labor Materials Indirect Finished Goods Factory Overhead Direct Allocate Job Order Manufacturing Activities Indirect

Job Order Cost Documents job cost sheet The primary document for tracking the costs associated with a given job is the job cost sheet.

Job Cost Sheet J9738 Miami Motors 300 boat engines

Materials Requisition Used to authorize the use of materials on a job. Also serves as the source document for recording material usage in the accounting records. MR523 8/ Bar steel stock 3” 720 lbs $11.50 $8,280 J9738 A35161 Subassemblies 290 units $ ,020 Total $19,300

Job Cost Sheet J9738 Miami Motors 300 automobile engine valves 8/03 MR52319,300

Labor Time Ticket J. Khan M16 J hours $28 $196 Date: 8/03

Job Cost Sheet J9738 Miami Motors 300 automobile engine valves 8/03 MR52319,300M M /04A25 3,824

Job Cost Sheet Assign manufacturing overhead to jobs using predetermined overhead rate based on direct labor cost.

Job Cost Sheet J9738 Miami Motors 300 automobile engine valves 8/03 MR52319,300M M /04A25 3,824 8/04 40% 1,798 4,496 Predetermined overhead rate = 40% of direct labor costs 19,300 4,496 1,798 25,594 Cost per valve = $25,594/ 300 = $85.31

Raw Materials Material Purchases Direct Material Flow of All Job Order Costs Actual Overhead Costs Indirect Material Manufacturing Overhead Work in Process

Incurred Direct Material Manufacturing Wages Actual Applied overhead overhead = / an adjustment is needed. We will look at how to accomplish this later. When Flow of All Job Order Costs Manufacturing Overhead Actual Overhead Costs Indirect Labor Direct Labor Overhead Applied to Work in Process Overhead

Work in Process Direct Material Direct Labor Overhead Finished Goods Cost of Goods Mfd. Cost of Goods Sold Flow of All Job Order Costs

Overhead Application 1.Estimate total overhead for the period. 2.Select an overhead allocation base. 3.Estimate total quantity of the overhead allocation base. 4.Compute the predetermined overhead rate.

Estimated total manufacturing overhead cost for the coming period Estimated total of manufacturing overhead allocation base. POHR = Predetermined Overhead Allocation Rate Formula

Overhead Application 5Obtain actual quantities of the overhead allocation base. 6Allocate manufacturing overhead by multiplying the predetermined manufacturing overhead rate by the actual quantity of the allocation base that pertains to each job.

Reasons for using a predetermined overhead rate Overhead is not incurred uniformly during the year. Actual Overhead rate might vary from month to month. Predetermined rate makes it possible to estimate job costs sooner.

Adjusting of Overapplied and Underapplied Overhead The POHR is based on estimates. What happens if actual results differ from the estimates? The result will be either underapplied or overapplied overhead and we will adjust Cost of Goods Sold at the end of the period

Overhead applied Actual overhead costs incurred Overhead is overapplied. Adjusting of Overapplied and Underapplied Overhead

Overhead applied Actual overhead costs incurred Overhead is underapplied. Adjusting of Overapplied and Underapplied Overhead

Objective 2 Trace Materials and Labor in a Manufacturer’s Job Costing System.

Materials Cost Example Alec Clothing Co. purchased raw materials on account for $15,000. Materials costing $10,000 were requisitioned for production. Of this total, $2,000 was indirect materials.

Indirect materials Direct materials 15,000 10,000 2,000 8,000 Materials InventoryWIP Inventory Manufacturing Overhead Materials Cost Example

Labor Cost Example The company incurred $30,000 of manufacturing wages for all jobs. Assume that $25,000 can be traced directly to the jobs and $5,000 is for indirect labor.

Indirect labor Direct labor 30,000 5,000 25,000 Manufacturing WagesWIP Inventory Manufacturing Overhead Labor Cost Example

Objective 3 Allocate Manufacturing Overhead in a Manufacturer’s Job Costing System

Manufacturing Overhead (Deprec.-Plant and Equipment)20,000 Accumulated Depreciation (Plant and Equipment)20,000 To record plant and equipment depreciation Manufacturing Overhead Costs The company incurred $20,000 of plant equipment depreciation.

$243,000 ÷ 4,500 = $54 Manufacturing Overhead Example Total estimated overhead for the year equals $243,000. The predetermined overhead rate is based on 4,500 direct labor hours. What is the predetermined overhead rate?

Work-in-Process Inventory10,800 Manufacturing Overhead10,800 To record overhead applied to Job 51 Manufacturing Overhead Example Assume that Job 51 used 200 direct labor hours. What is the journal entry to record the manufacturing overhead applied?

Objective 4 Account for Completion and Sales of Finished Goods, and Adjust for Under-or-Overapplied Manufacturing Overhead

Finished Goods, Sales, and Cost of Goods Sold As jobs are completed they are transferred to finished goods inventory. In addition to the overhead applied to Job 51, direct labor was $4,000 and direct materials totaled $30,000. How much was transferred to Finished Goods Inventory?

Finished Goods, Sales, and Cost of Goods Sold Direct materials$30,000 Direct labor 4,000 Manufacturing overhead 10,800 $44,800 Work in Process 44,800 Finished Goods 44,800

Accounts Receivable74,800 Sales Revenue74,800 Cost of Goods Sold44,800 Finished Goods Inventory44,800 To record sale of Job 51 Finished Goods, Sales, and Cost of Goods Sold Assume that Job 51 was sold for $74,800. What are the journal entries?

Work in Process 44,800 Finished Goods 44,800 44,800 Cost of Goods Sold 44,800 Finished Goods, Sales, and Cost of Goods Sold

Disposing of Underallocated or Overallocated Overhead Suppose that the company incurred $232,000 of actual manufacturing overhead during the year, and that actual direct labor hours worked were 4,000. The actual manufacturing overhead rate would have been $232,000 ÷ 4,000 = $58. The predetermined rate was $54.

Disposing of Underallocated or Overallocated Overhead How much overhead was allocated to the various jobs? 4,000 direct labor hours × $54 = $216,000 What is the underallocated amount? $232,000 actual – $216,000 allocated = $16,000

Manufacturing Overhead 232,000216,000 16,000 Cost of Goods Sold 16,000 0 Disposing Underallocated Overhead to Cost of Goods Sold

Disposing Overallocated Overhead to Cost of Goods Sold Assume the opposite situation in which allocated overhead is $232,000 and actual overhead is $216,000. How do we dispose of overallocated overhead? Debit the Manufacturing Overhead account and credit the Cost of Goods Sold account to decrease the costs that went to the income statement.

Manufacturing Overhead 216,000232,000 16,000 0 Cost of Goods Sold 16,000 Disposing Overallocated Overhead to Cost of Goods Sold

Objective 5 Assign Noninventoriable Costs in Job Costing.

Job Costing in a Nonmanufacturing Company How is direct labor traced to individual jobs in a nonmanufacturing company? Employees complete a weekly time record. Jim, Abby, and Associates is a firm specializing in composing and arranging music parts for different clients. Musician Judy Lopez’s salary is $80,000 per year.

80,000 ÷ 2,000 = $40 Job Costing in a Nonmanufacturing Company Assuming a 40-hour workweek and 50 workweeks in each year gives a total of 2,000 available working hours per year (40 hours × 50 weeks). What is her hourly rate?

Advertising$ 15,000 Depreciation 6,000 Maintenance 12,000 Office rent 60,000 Office support 47,000 Travel 20,000 Total indirect costs$160,000 Job Costing in a Nonmanufacturing Company Jim and Abby estimated the indirect costs that will be incurred in 2006.

160,000 ÷ 8,000 = $20 Job Costing in a Nonmanufacturing Company Assume that they estimate that the musicians will work 8,000 direct labor hours in What is the predetermined indirect cost rate?

Direct Labor:25 hours × $40 =$1,000 Indirect costs:25 hours × $20 = 500 Total costs:$1,500 Job Costing in a Nonmanufacturing Company Records show that Judy Lopez worked 25 hours servicing Los Abuelos Music Co. What is the total cost assigned to this client?