Congestion Management Settlement Credits December, 2002.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Set Up Instructions Place a question in each spot indicated Place an answer in each spot indicated Remove this slide Save as a powerpoint slide show.
Advanced Piloting Cruise Plot.
1
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 4 Future Value, Present Value and Interest Rates.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Welcome to Who Wants to be a Millionaire
1 1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
ZMQS ZMQS
1 Copyright Copyright 2012.
PP Test Review Sections 6-1 to 6-6
An Introduction to International Economics
ABC Technology Project
The table shows the top scores for girls in barrel racing at the 2004 National High School Rodeo finals. The data can be presented in a table or a spreadsheet.
VOORBLAD.
A Key to Economic Analysis
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Januar MDMDFSSMDMDFSSS
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Converting a Fraction to %
Fundamentals of Cost Analysis for Decision Making
Partial Products. Category 1 1 x 3-digit problems.
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
Energy Generation in Mitochondria and Chlorplasts
IJT Transaction Timelines and Scheduling – NISL and CMSC.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
Presentation transcript:

Congestion Management Settlement Credits December, 2002

2 Market Design Principles The price of energy at each time and place should reflect the marginal cost of producing or not consuming one more unit of energy (at that time and place) Dispatchable market participants should be compensated for the effects of constraints The price of energy at each time and place should reflect the marginal cost of producing or not consuming one more unit of energy (at that time and place) Dispatchable market participants should be compensated for the effects of constraints

3 Congestion Occurs when physical capability of the transmission system cannot meet market requirements

Operating Profit

5 Operating Profit is the difference between operating cost and revenue Market Rules written assuming participants bid and offer based on marginal benefit/cost Marginal Cost - Cost of producing next MW Marginal Benefit - Benefit of consuming next MW Operating Profit is the difference between operating cost and revenue Market Rules written assuming participants bid and offer based on marginal benefit/cost Marginal Cost - Cost of producing next MW Marginal Benefit - Benefit of consuming next MW

6 OP = Revenue - Cost Quantity (MW) MCP = 20 Price ($/MWh) MQSI= OP+OP+OP+

7 Skill Check

8 Generator A offer: 0-20 MW $ MW $ MW $100 Dispatched to 30 MW Generator A offer: 0-20 MW $ MW $ MW $100 Dispatched to 30 MW Load B bid: 0-10 MW $1, MW $ MW $20 Dispatched to 20 MW If MCP is $30, what is the OP for A and B?

Congestion Management Settlement Credits

10 Congestion Management Settlement Credit CMSC payments are based on the difference between the Operating Profit that would result from the Market Schedule and Operating Profit resulting from the Dispatch Instruction OP (MQSI) - OP (DQSI) Where MQSI = Market Quantity Scheduled for Injection DQSI = Dispatch Quantity Scheduled for Injection OP (MQSI) - OP (DQSI) Where MQSI = Market Quantity Scheduled for Injection DQSI = Dispatch Quantity Scheduled for Injection

11 Market Schedule Requirement is 190 MW Gen 1: 100 MWGen 1: 100 MW Gen 2: 90 MWGen 2: 90 MW MCP $20MCP $20 GEN 3: does not runGEN 3: does not run Region 2 Region 1 notransmission line limit Generator MW $25 Load 190 MW Generator MW $15 Generator MW $20

12 Transmission Congestion Requirement is 190 MW Gen 1: 100 MWGen 1: 100 MW Gen 2: 50 MWGen 2: 50 MW Gen 3: 40 MWGen 3: 40 MW MCP $20MCP $20 Generator MW $15 Generator MW $20 Generator MW $25 Load 190 MW Region 2 Region MW transmission line limit

13 CMSC For Generator 2 in this case: MQSI = 90Offer = $20 DQSI = 50MCP = $20 For Generator 2 in this case: MQSI = 90Offer = $20 DQSI = 50MCP = $20 CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = (20-20) x90 - (20-20) x 50 = = $0 CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = (20-20) x90 - (20-20) x 50 = = $0

14 CMSC For Generator 3 in this case: MQSI = 0Offer = $25 DQSI = 40MCP = $20 For Generator 3 in this case: MQSI = 0Offer = $25 DQSI = 40MCP = $20 CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = (20-25) x 0 - (20-25) x 40 = 0 - (-$200) = $200 CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = (20-25) x 0 - (20-25) x 40 = 0 - (-$200) = $200

15 Gen 1- Constrained Off Requirement is 190 MW Gen 1: 95 MWGen 1: 95 MW Gen 2: 55 MWGen 2: 55 MW Gen 3: 40 MWGen 3: 40 MW MCP $20MCP $20 Generator MW $25 Load 190 MW Region 2 Region MW transmission line limit 95 MW limit Generator MW $15 Generator MW $20

16 Constrained Off Payment Generator 1 Market Schedule: 100 MW Dispatch : 95 MW Offer: $15 /MWh MCP: $20 /MWh Generator 1 Market Schedule: 100 MW Dispatch : 95 MW Offer: $15 /MWh MCP: $20 /MWh CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = (20-15) x (20-15) x 95 = $25 CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = (20-15) x (20-15) x 95 = $25

17 Gen 2 - Constrained Off Requirement is 190 MW Gen 1: 95 MWGen 1: 95 MW Gen 2: 55 MWGen 2: 55 MW Gen 3: 40 MWGen 3: 40 MW MCP $20MCP $20 Generator MW $25 Load 190 MW Region 2 Region MW transmission line limit 95 MW 100 MW Generator MW $15 Generator MW $20

18 Constrained Off Payment Generator 2 Market Schedule: 90 MW Dispatch : 55 MW Offer: $20 /MWh MCP: $20 /MWh Generator 2 Market Schedule: 90 MW Dispatch : 55 MW Offer: $20 /MWh MCP: $20 /MWh CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = (20-20) x 90 - (20-20) x 55 = $0 CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = (20-20) x 90 - (20-20) x 55 = $0

19 Constrained On Payment Generator 3 Market Schedule: 0 Dispatch : 40 MW Offer: $25 MCP: $20 /MWh Generator 3 Market Schedule: 0 Dispatch : 40 MW Offer: $25 MCP: $20 /MWh CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = ($20-$25) x 0 - ($20-$25) x 40 MW = $200 CMSC = OP(MQSI) - OP(DQSI) = (MCP-Offer) x MQSI - (MCP-Offer) x DQSI = ($20-$25) x 0 - ($20-$25) x 40 MW = $200

Constraint Payments When Actual Quantity Different than Dispatch Quantity

21 Gen 1- Constrained Off Requirement is 190 MW Gen 1: 95 MWGen 1: 95 MW Gen 2: 55 MWGen 2: 55 MW Gen 3: 40 MWGen 3: 40 MW MCP $20MCP $20 Generator MW $25 Load 190 MW Region 2 Region MW transmission line limit 95 MW limit Generator MW $15 Generator MW $20 Actually produces 50 MW

22 Constraint Payments MQSI = 0 MW, DQSI=40 MW, AQEI =50MW MCP = $20Offer = $25 MQSI = 0 MW, DQSI=40 MW, AQEI =50MW MCP = $20Offer = $25 CMSC = OP (MQSI) - MAX [OP (DQSI), OP (AQEI)] = (20-25) x 0 - MAX [(20-25) x 40, (20-25) x 50] = $0 - MAX [$-200, $-250] = $-(-200) = $200 CMSC = OP (MQSI) - MAX [OP (DQSI), OP (AQEI)] = (20-25) x 0 - MAX [(20-25) x 40, (20-25) x 50] = $0 - MAX [$-200, $-250] = $-(-200) = $200

23 CMSC for a Dispatchable Load Load may be dispatched off or on Any time constrained and unconstrained are different, possibility exists for CMSC Load may be dispatched off or on Any time constrained and unconstrained are different, possibility exists for CMSC

24 CMSC for a Dispatchable Load E.G. Load A bids for 100 MW at $2,000 Market Clearing Price = $100 Load A is dispatched to only 75 MW At a bid price of $2,000 Load A will be scheduled by the unconstrained algorithm for all 100 MW E.G. Load A bids for 100 MW at $2,000 Market Clearing Price = $100 Load A is dispatched to only 75 MW At a bid price of $2,000 Load A will be scheduled by the unconstrained algorithm for all 100 MW

25 CMSC for a Dispatchable Load Bid = $2,000 MCP = $100 MQSI = 100 MW, DQSI = 75 MW CMSC = OP(MQSI) - OP(DQSI) = ($2,000 - $100) x ($2,000 - $100) x 75) = $1900 x $1900 x 75 = $47,500 The lost Operating Profit is $47,500 Bid = $2,000 MCP = $100 MQSI = 100 MW, DQSI = 75 MW CMSC = OP(MQSI) - OP(DQSI) = ($2,000 - $100) x ($2,000 - $100) x 75) = $1900 x $1900 x 75 = $47,500 The lost Operating Profit is $47,500

26 Negative CMSC CMSC payments bring the participant back to the market schedule operating profit Generally CMSC payments will be a top-up to restore operating profit Sometimes the schedule would lead to lower profit than dispatch instructions CMSC payments bring the participant back to the market schedule operating profit Generally CMSC payments will be a top-up to restore operating profit Sometimes the schedule would lead to lower profit than dispatch instructions

27 CMSC CMSC payments bring the participant back to the market schedule operating profit While CMSC can be negative, it is more often a payment to participants The cost of CMSC is recovered from loads based on their activity in the market CMSC payments bring the participant back to the market schedule operating profit While CMSC can be negative, it is more often a payment to participants The cost of CMSC is recovered from loads based on their activity in the market