Science Operations Phil Edwards Head of Science Operations CSIRO ATNF.

Slides:



Advertisements
Similar presentations
Australian Report -- The view from down under
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Symantec 2010 Windows 7 Migration Global Results.
Effective Change Detection Using Sampling Junghoo John Cho Alexandros Ntoulas UCLA.
VLBI progress Down-under Tasso Tzioumis Australia Telescope National Facility (ATNF) 25 September 2008.
1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
GSMP Local Community Network Enhanced Process Meeting Sept. 13, 2007.
1 ICOTS What weve learned since October 6, GETTING STARTED.
Making the System Operational
Science Operations Phil Edwards 11 June 2013 CSIRO ASTRONOMY & SPACE SCIENCE.
Introduction Lesson 1 Microsoft Office 2010 and the Internet
Receiver Systems Alex Dunning.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Welcome. © 2008 ADP, Inc. 2 Overview A Look at the Web Site Question and Answer Session Agenda.
Configuration management
E-VLBI Progress with the LBA Chris Phillips, eVLBI Project Scientist November 2011.
Introduction for University Staff
Science Operations Phil Edwards 30 October 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Student Lab Management IT Services March Our Purpose this evening … o Foster good communication o Improve Relationships and Collaboration o Prepare.
® Microsoft Office 2010 Browser and Basics.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 9 TCP/IP Protocol Suite and IP Addressing.
RefWorks: The Basics October 12, What is RefWorks? A personal bibliographic software manager –Manages citations –Creates bibliogaphies Accessible.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
ATNF Scientific Software – an overview Mark Wieringa – ATNF/Operations/SCA.
Mopra Operations Balt Indermuehle 13 June ATNF Mopra Operations What’s new at Mopra Telescope Operating Alerting Device Gotta love the TOAD! Mopra.
Phil Edwards Head of Science Operations CSIRO Astronomy and Space Science Science Operations.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
ATUC, Marsfield Phil Diamond, Chief of Division 28 June 2011 CSIRO Astronomy and Space Science ATNF: Director’s Update.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
The SOC Pilot Project: MALT-90 Jessica Chapman CASS Observatory Operations Research Program Leader 9 September 2010 MALT90 Project – Presented and edited.
Portal User Group Meeting September 14, Agenda Welcome Updates Reminders.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Science Operations Philip Edwards Head of Science Operations 26 May 2010.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
Recent Developments in Australia Phil Edwards Head of Science Operations CSIRO ATNF.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Observing modes at the AT ATUC Presentations October 2000 Ray Norris CSIRO Australia Telescope National Facility.
Engineering Operations: Parkes Development Projects Erik Lensson, SMIEEE, mSMPTE Head, Engineering Operations 29 October 2009.
Welcome to the San Bernardino County Coach Quarterly Meeting.
The SOC Pilot and the ATOA Jessica Chapman CASS Observatory Operations Research Program Leader 28 June 2011.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
2003 LBA Ops meeting Tasso Tzioumis. Previous LBA ops meeting 3 April 2003, Hobart Minutes on
Science Operations Philip Edwards Head of Science Operations 29 October 2009.
ATUC meeting Director’s Report Brian Boyle November 2007.
ATUC Meeting, 14 May 2009, Astro Issues Robert Braun.
CABB update Philip Edwards Head of Science Operations 14 October 2010.
ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.
Science Operations Phil Edwards 11 July 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
Operations Philip Edwards Head of Science Operations 28 October 2008.
ATUC meeting Director’s Report Brian Boyle May 2008.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Astro Report to ATUC – October 2011 Simon Johnston Head Astrophysics, CASS ATUC, October 2011.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.
The ATNF Pulsar Data Archive Matthew Whiting (ATNF) Albert Teoh, David Smith, Lucyna Kedziora-Chudczer, Dick Manchester, Vince McIntyre 2nd Gravitational.
The Parkes Data Archiving Project Arkadi Kosmynin 11 December 2009 The Third ATNF Gravitational Wave Workshop.
Australia Telescope Users Committee Technologies Report - Oct 2008.
Graeme Carrad Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 28 June 2011 Australia Telescope Users Committee Technologies.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback.
Observatory Visit Naomi McClure-Griffiths Australia Telescope National Facility CSIRO Vacation Scholar Program 2 Dec 2002.
CABB support and ATCA flux calibration Jamie Stevens ATCA Senior System Scientist 26 May 2010.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
The CSIRO ASKAP Science Data Archive Progress and Plans
Paul Wild Observatory at Narrabri
ATCA/Mopra report Phil Edwards ATUC meeting 6 November 2007
Australia Telescope Users Committee Technologies Report – October 2011
Presentation transcript:

Science Operations Phil Edwards Head of Science Operations CSIRO ATNF

ATNF Operations Structure Telescope Operations & Science Services Computer Infrastructure Scientific Computing & Archives Visitor services Receivers, LO & Conversion Digital & Servo Electronics Cryogenics Mechanical, Drives, & Electrical Science Operations Engineering Operations National Facility Operations CSIRO. ATUC report May 2010: ATNF Science Operations

Telescope Operations and Science Services TAC met in July Eight TAC members supported by 16 TAC readers No password required to access Cover Sheets and Obs Tables of scheduled proposals by time of next Call for Proposals Schedules released in early September Release notes added for ATCA and Parkes Difficulties in filling the DA roster for Narrabri AT staff, co-supervised students, or experienced others welcome! TOSS support for Narrabri Open Day & CASS Radio School New version of AT User Guide Continued improvements to content and formatting New ATCA sensitivity calculator on-line Beta version of new ATCA calibrator database on-line CSIRO. ATUC report May 2010: ATNF Science Operations

Scientific computing and archives New version of OPAL worked well Updates to CABB scheduler and caobs On-the-fly mosaicing tests with CABB carried out World Coordinate System being implemented in miriad MoniCA updated for new 20/13cm receivers New version of MoniCA being tested Parkes polarisation software being tested and refined New versions of showtel and winds at Parkes ASAP development now in cooperation with ALMA CSIRO. ATUC report May 2010: ATNF Science Operations

Computer Infrastructure On-going work in upgrading servers and adding storage Horus and draco upgraded, athena decommissioned Scheduled replacement of Parkes windows desktops and laptops completed, work begun at Narrabri Pilot SOC point-to-point broadcast quality video link commissioned between Mopra desk and room 23 IP telephony installation at Marsfield (by IM&T) Currently no phones with direct outside access Moving and recabling of equipment in RFI-proof racks at Parkes last week Shaun appointed leader of ASKAP Networking IPT CSIRO. ATUC report May 2010: ATNF Science Operations

Visitor Services Group Vicki and Sam sharing the Project Leader role Accommodation prices increased by 10% from September 1 Meal prices unchanged Visitors now emailed after their stay and asked to complete and on-line questionnaire form VSG staff from all three sites had a get-together at Marsfield earlier this week New beds at Parkes Quarters New fridge and freezer at Narrabri Army of CASS Radio School participants well-fed CSIRO. ATUC report May 2010: ATNF Science Operations

Around the Observatories Tidbinbilla A record 7 proposals for 2010OCT (following 0 for 2010APR) Parkes pulsar project requiring higher frequency observations transferred to Tid New LNAs and down-converters for the 22GHz system expected this month New spectrometer and dual-pol filter box now being tested ATNF Vacation Student to work on on-the-fly mapping with Jimi Green and Shinji Horiuchi LBA Correlator back-log (effectively) cleared LBA session from October 25th, with Hartebeesthoek & Tidbinbilla Shorter sessions during 2010OCT for observations of pulsar around periastron Discussions progressing with AUT about inclusion of Warwkworth in the LBA CSIRO. ATUC report May 2010: ATNF Science Operations

LBA observing time (in hrs) by year and band 2004 2005 2006 2007 2008 2009 20cm 36 37 107 142 58 65 13cm 64 44 54 91 51 11 6cm 22 60 42 14 95 3cm 98 192 127 99 226 168 1cm 24 12 21 105 57 total 244 333 341 366 505 396

Around the Observatories Mopra Paper on 12mm & 7mm characterisation published in PASA Further 3mm characterisation observations over next month Tests of “robotic mode” or “scripted” observing about to start Successful fast-mapping observations Change of default cycle time to 2.048 sec likely to be adopted More tests of standing wave mitigation by sub-reflector cycling Some work on documentation remains Mopra all-sky webcam planned by 2011APR Parkes CPSR2 decommissioned Methanol multi-beam unlikely to be offered in future Two week shutdown underway to commission RF switching matrix Four week shutdown in March for MCP upgrade Increasing RFI seen over last year: observers asked to record onset, duration and characteristics as accurately as possible CSIRO. ATUC report May 2010: ATNF Science Operations

Around the Observatories ATCA 20/13cm receive upgrade continuing All six antennas outfitted by mid-December 20cm observing in 2010OCTS held off till mid-Dec as much as possible Galactic coordinate mosaicing implemented in caobs and awaiting testing: allowing galactic coordinates to be used in the CABB scheduler to follow Attempts to remedy instances of erratic azimuth tracking on some antennas continuing… CABB progress to be described in separate report All six Water Vapour Radiometers now accepted and installed, awaiting in situ calibration CSIRO. ATUC report May 2010: ATNF Science Operations

WVRs Water Vapour Radiometer project funded by LIEF grant administered by UNSW, with contributions from UNSW Sydney James Cook Swinburne ATNF CSIRO. ATUC report May 2010: ATNF Science Operations

Some first WVR data… CSIRO. ATUC report May 2010: ATNF Science Operations

Scheduling policy Observers are expected to check the archives to determine whether observations of their proposed source(s) exist, and, if so, to justify why additional observations are required. The OPAL source list tool can be used with ATOA to determine which sources have been previously observed with the ATCA Similar observations of a source may be scheduled for more than one team Examples include Sgr A* with the ATCA, PSR J1141-6545 with Parkes Proposals do not include sufficient detail to cross-check proposed observations against existing observations Proposals for >30 sources do not need to list all sources Proposals only allocated a fraction of their requested time often elect to observe only a fraction of their original source list CSIRO. ATUC report May 2010: ATNF Science Operations

Scheduling policy ATOA has not until recently allowed positional searches of ATCA mosaic observations Large projects for all telescopes are being encouraged to establish and maintain informative web pages so that prospective users can determine whether their proposed source(s) have already been covered by large survey programs Determining what constitutes a “sufficiently different” observation is not always clear-cut CSIRO. ATUC report May 2010: ATNF Science Operations

Thank you CSIRO/ATNF Philip Edwards CSIRO ATNF Head of Science Operations Email: Philip.Edwards@csiro.au Web: www.atnf.csiro.au Contact Us Phone: 1300 363 400 or +61 3 9545 2176 Email: Enquiries@csiro.au Web: www.csiro.au CSIRO. ATUC report May 2010: ATNF Science Operations