Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Advertisements

Report of Event Committee meeting Time: Aug 24 16:00-17:30 Place: Room H - Magnolia Chair: Akira Mizushima Secretariat: Pipot Abdon.
E-Tag 1.8 An industry tutorial.
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
National Thousands Block Number Pooling Services NANC Meeting January 13, 2004.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 24, 2013 Anaheim, CA.
North American Energy Standards Board Upadate Presented by Bob Harshbarger.
Primary Objectives of WIT
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the MIC March 2013 Salt Lake City, UT.
Bob Harshbarger Volunteer Order 771 January 16, 2013 Still Icy-Cold Salt Lake.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the OC October 2013 Salt Lake City, UT.
Load Responsibility in the NWPP Footprint
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Interchange Scheduling and Accounting Subcommittee Update WECC OC Meeting June 2009 Salt Lake City, Utah Marilyn Franz ISAS Chair.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
MIC/ISAS LIAISON REPORT June 15, 2007 April, 2007 ISAS Meeting Highlights.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
Spring 2011 Webinar State Student Assistance Commission of Indiana
The 24-hour clock 1 12-hour clock 24-hour clock
Grants 3.0 Departmental Administrator Review January 22, 2014.
Chapter 3 Mathematics of Finance
FERC Order minute Scheduling.
Student & Work Study Employment Facts & Time Card Training
KRONOS COMPENSATORY TIME AND.
Break Time Remaining 10:00.
Office of Operations 2010 Fall Conference State Agency Compliance with Prompt Contracting Regulation Dan Agosto, John Moriarty & Patricia ODonnell.
15. Oktober Oktober Oktober 2012.
WIT Computation of Primary Inadvertent Interchange (ATEC)
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the OC March 2014 Salt Lake City, UT.
WECC Reliability Based Control Field Trial
ISAS Update August 2, 2011 Market Issues Subcommittee.
ISAS Update Prepared by Brenda Ambrosi ISAS Chair October 14, 2011.
We are learning how to read the 24 hour clock
1 FL EDI R3 Test Requirements Rule 69L , F.A.C.
Training Monday, February 04, Saturday, October 11, Welcome to the Accounts Payable Invoice Processing Course.
: 3 00.
5 minutes.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
How to Fill out a PAR for a New Standard Revised 8 July 2010.
Clock will move after 1 minute
Select a time to count down from the clock above
Web Time Entry Hours Entry in ESS 04/26/12 1 Banner.
ISAS Report To the OC Andy Meyers Interchange Scheduling & Accounting Subcommittee Chair October 2014 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting 01/28/2015 Salt Lake City, UT.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.
Interchange Scheduling & Accounting Subcommittee (ISAS) Charles (Bud) Freeman, SCL W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report
Sheryl Welch ATFWG Chair
Western Electricity Coordinating Council
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Compliance Open Webinar
After-the-Fact Workgroup Update Sheryl Welch
Western Electricity Coordinating Council
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Compliance Open Webinar
North America Energy Standards Board
Sheryl Welch ATFWG Chair
Public Utilities Specialist
Presentation transcript:

Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR

 Generator was incorrectly registered in Electric Industry Registry (EIR) as a sink. ◦ Generator has been removed as a sink in EIR.  PSE tagged to and from the generator between April 28th thru April 30th.  Tags using the incorrect sink were discovered May 1st.  The PSE was asked to correct the tag problem by using the original source and the final sink with a wheel thru the generator.  Until the ATF tags were implemented, the Primary Inadvertent continued to accrue. 2

 29 WECC Schedule Change Request Forms were submitted to WECC Dispute Reports ◦ Submitted on May 1, 2014 approximately 10:30 PDT ◦ Contained 156 Scheduled hours ◦ 86 of the scheduled hours reported “Wrong Sink”  9 Balancing Authority (BAs) involved ◦ 70 of the scheduled hours reported “Wrong Source”  2 BAs involved 3

 WECC Schedule Change Request Forms were completed at approximately 1300 MDT on May 1 st. ◦ Required two WECC staff members  Approximately 16:59, WECC received a WECCNet message from BA1 reporting that it was not participating in the Automatic Time Error correction until “OATI corrects their primary inadvertent calculations.” ◦ At 08:19 on May 2 nd, WECC started an investigation with BA1 to determine why the inadvertant was incorrect. 4

 WECC received a telephone call from BA2 wanting to know why there were so many issues in WIT regarding Primary Inadvertents. ◦ Review of WIT showed the Inadvertent Interchange Accumulations for BA2 was during the same 3-day period as the WECC Schedule Change Request Forms. ◦ PSE notified BA1 that ATF tags would not be ready for implementation until late on May 2nd or not until Monday, May 5 th. 5

◦ After notified by WECC, BA2 requested that either the original schedules be put back into WIT or the ATF tags get implemented immediately.  Until ATF tags are implemented, WIT showed up to 4,000 amount of erroneous “payback” of accumulated primary inadvertent through Automatic Time Error Correction (ATEC).  WECC instructed the PSE to approve and implement ALL ATF tags immediately or all schedules would be returned to WIT until the ATF tags could be ready for processing. ◦ Until ATF tags are implemented, primary inadvertent would continue to accumulate. ◦ PSE submitted ATF Tags at 10:47 on May 2nd. 6

◦ Prior to ATF tags, Primary Inadvertent values from April 28th thru April 30, 2014, were as high as 4,000 MW ◦ After ATF tags, the On-Peak Primary Inadvertent resulted in only 287 MW (prior inadvertent value). ◦ Primary Inadvertent is to be paid back each scheduled hour through ATEC  If problem is not caught early, BAs could payback a large amount of Primary Inadvertent.  If ATF tags are not implement timely, Primary Inadvertent could in fact be in opposite direction of the correct Accumulated Primary Inadvertent. 7

 Effective April 1, 2014, WECC Standard BAL- 004-WECC-02 R3: Each Balancing Authority shall keep its ATEC in service, with an allowable exception period of less than or equal to an accumulated 24 hours per calendar quarter for ATEC to be out of service. ◦ This issue was resolved within 21hours. ◦ However, the time gets accounted for in the quarterly accumulation. 8

 ATF tags should be created and implemented in a reasonable amount of time shortly after the agreed upon WECC Schedule Change Request Forms are implemented to avoid significant Accumulated Primary Inadvertent.  Avoid creating ATF tags after 2:00 pm (PDT). ◦ WECC staff is on MDT 9

 Generator was offline for the following dates: ◦ 04/28/2014, HE 01 & HE 24 ◦ 04/29/2014, HE & HE 24 ◦ 04/30/2014, HE 01-04, HE  USF Events as follows: ◦ Path 66 on 04/29/2014, HE (#12864 & 12865) No tags flowed on the COI ◦ Reviewed the impact on the USF Events  Majority of tags had same TDF of 0.  Few tags went from 0 TDF to negative TDF.  Conclusion: Minimal impact to USF Event. 10