Sprinkler Protection of Non-Storage Occupancies with High Ceiling Clearance 20 May, 2014 Peter Thomas.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
:. A. B. C. D. A. 92% 90% 60 P S.. ~ ~
Advanced Piloting Cruise Plot.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
and 6.855J Spanning Tree Algorithms. 2 The Greedy Algorithm in Action
We need a common denominator to add these fractions.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
0 - 0.
1 1  1 =.
1  1 =.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Negative Numbers What do you understand by this?.
Learning to show the remainder
ZMQS ZMQS
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Division- the bus stop method
ABC Technology Project
© S Haughton more than 3?
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Mrs. Rivas International Studies Charter School. Worksheet Practice 7-1 to 7-5Section 7-1 Algebra Solve each proportion.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
“Be An Example” Introduction 1st Timothy 4:12 Matthew 5:16
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
0 x x2 0 0 x1 0 0 x3 0 1 x7 7 2 x0 0 9 x0 0.
7x7=.
Presentation transcript:

Sprinkler Protection of Non-Storage Occupancies with High Ceiling Clearance 20 May, 2014 Peter Thomas

Background Architectural designs create real fire protection challenges to fire engineers. “The Taller” seems to be “The Better” Sprinkler performance and effectiveness in buildings with high roofs and non-storage occupancies such as atria, convention centers, casinos, auditoriums, theaters, exposition halls and others, is not well understood.

Introduction – Current Situation Convention Center Ceiling Height of 18 m What is sprinkler protection based on current installation standards?

Introduction – Current Situation EN 12845 (OH 4) 5.0 mm/min 360 sq m NFPA 13 (OH 2) 8.1 mm/min 139 sq m 6.1 mm/min 372 sq m FMDS 3-26 (HC 3) 20.0 mm/min 280 sq m China GB 50084 (OH 1) 6.0 mm/min 160 sq m Australia AS 2118.1 (High Hazard- Process) 12 mm/min 360 sq m Singapore CP52 Not Allowed

Needs further research 2017年4月8日星期六 Test Summary from FM Test 1 Test 2 Test 3 Test 4 Exploratory Test 5 EC 25 Commodity (as per NFPA) Class II Group A Plastic Fuel Height 2.26 1.73 Ceiling 15.4 15.9 16.6 Deflector 15.2 15.7 16.4 Arrangement 8X8,solid, 2 tiers 2X8, solid, 1 tier density 12 mm/min 6 mm/min 18 mm/min. K-factor K115, RTI 140 K 80, RTI 140 K 160, RTI 28 K 360, RTI 28 Spacing 3.0 X 3.0 6.1 X 6.1 Conclusion Passed 15 heads operating Skipping Adequate 17 heads operating Failed 26 heads operating 16 heads operating 1 head operating No skipping Needs further research

Test Plan

Test Fuel and Fuel Array Arrangement

Sprinkler System

Full Scale Fire Test 1 Fuel Arrangement: Group A Plastics Ceiling height: 12 m Fuel Height: 1.63 m Clearance to ceiling: 10.4 m Arrangement of fuel package: 8 by 2, solid pile Ignition Location: Under 1 sprinkler Density: 15 mm/min Sprinklers: K115, RTI 105 (m-s)1/2 Standard Response, Pendent Spacing: 3.0 m x 3.0 m

Full Scale Fire Test 1

Full Scale Fire Test 1

Full Scale Fire Test 1

Full Scale Fire Test 2 Fuel Arrangement: Group A Plastics Ceiling Height: 16 m Fuel Height: 1.63 / 1.13 m Clearance to ceiling: 14.4 m Arrangement of fuel package: 8 by 2, solid pile Ignition Location: Under 1 sprinkler Density: 20 mm/min Sprinklers: K115, RTI 35 (m-s)1/2 Quick Response, Pendent Spacing: 3.0 m x 3.0 m

Full Scale Fire Test 2

Full Scale Fire Test 2

Full Scale Fire Test 2

Full Scale Fire Test 3 Fuel Arrangement: Group A Plastics Ceiling Height: 16 m Fuel Height: 1.63 / 1.13 m Clearance to ceiling: 14.4 m Arrangement of fuel package: 8 by 2, solid pile Ignition Location: Under 1 sprinkler Density: 23 mm/min Sprinklers: K161, RTI 138 (m-s)1/2 Standard Response, Pendent Spacing: 3.0 m x 3.0 m

Full Scale Fire Test 3

Full Scale Fire Test 3

Full Scale Fire Test 4 Fuel Arrangement: Group A Plastics Ceiling Height: 18 m Fuel Height: 1.63 m Clearance to ceiling: 16.4 m Arrangement of Fuel Package: 6 by 2, solid pile Ignition Location: Under 1 sprinkler Density: 40 mm/min Sprinklers: K363, RTI 130 (m-s)1/2 Standard Response, Pendent Spacing: 3.0 m x 3.0 m

Full Scale Fire Test 4

Full Scale Fire Test 4

Full Scale Fire Test 5 Fuel Arrangement: Group A Plastics Ceiling Height: 18 m Fuel Height: 1.63 Clearance to Ceiling: 16.4 m Arrangement of Fuel package: 6 by 2, solid pile Ignition Location: Between 4 sprinklers Density: 40 mm/min Sprinklers: K363, RTI 130 (m-s)1/2 Standard Response, Pendent Spacing: 3.0 m x 3.0 m

Full Scale Fire Test 5

Full Scale Fire Test 5

Test Summary Effectiveness of sprinkler to control depends on delivered density Under 12 m ceiling, K 115 sprinkler at 15 mm/min. did not control the fire. Under 16 m ceiling, K115 sprinkler at 20mm/min. did not control the fire. A K160 sprinkler marginally controlled the fire at 23 mm/min. Under 18 m ceiling, K363 sprinkler at 40 mm/min. generates significantly larger drops and effectively controlled the fire.

Conclusion EN 12845 (OH 4) NFPA 13 (OH 2) FMDS 3-26 (HC 3) 5.0 mm/min 360 sq m NFPA 13 (OH 2) 8.1 mm/min 139 sq m 6.1 mm/min 372 sq m FMDS 3-26 (HC 3) 20.0 mm/min 280 sq m China GB 50084 (OH 1) 6.0 mm/min 160 sq m Change – 40 mm/min 160 sq m with K360 sprinklers Australia (AS 2118.1) (High Hazard- Process) 12 mm/min 360 sq m Singapore CP52 Not Allowed over 13 m Proposed change - 12 mm/min 360 sq m with K160 sprinklers