Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014.

Slides:



Advertisements
Similar presentations
UAS: Regulatory developments in EASA Michael Smethers Chairman of EASA Management Board 13 September 2011.
Advertisements

Introduction to Navigation Specifications
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Javier Perez Diestro Air Navigation International Director
Mission Trajectory Step 1 From planning to deployment.
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
22 May 2007OST EASA Transposition of JAA TGL No. 10 (Precision RNAV) Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
Status of EASA AMC Development Geoff Burtenshaw Directorate of Airspace Policy UK CAA.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
LSSIP Objective AOP04.1.
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR

ESSIP Plan 2014 / Objective NAV102 Objective NAV10  Comprehensive Explanation  What is new or has changed since LSSIP 2013  Link to European ATM Master Plan  Most important SLoA(s)  Finalisation Criteria and Closed Questions  Supporting Material  ESSIP Report 2013  Objective Coordinator’s Analysis, recommendations, tips & tricks  Conclusions  Links and contacts

ESSIP Plan 2014 / Objective NAV103 Comprehensive Explanation Implement APV procedures;  The intention is to transition from conventional NPA to APV procedures;  The primarily objective to enhance safety but there are potential benefits in terms of reduced minima and better access to airports without precision approach and landing capabilities;  Type: - SESAR;  Scope: – ECAC;  Applicability – All ECAC States;  Implementation Schedule – 06/ /2016

ESSIP Plan 2014 / Objective NAV104 What is new or has changed since LSSIP 2013  Align the FOC dates of REG01, USE01 and USE02 with the FOC date at objective level (12/2016)

ESSIP Plan 2014 / Objective NAV105 Link to European ATM Master Plan  OI step - [AOM-0602-A]-Enhanced terminal operations with APV using Barometric VNAV. ESSENTIAL;  OI step - [AOM-0602-B]-Enhanced terminal operations with LPV using SBAS ESSENTIAL

ESSIP Plan 2014 / Objective NAV106 Most important SLoA(s)  NAV10-ASP01: Design and Publish APV/Baro and/or APV/SBAS procedures;  NAV10-ASP03: Develop National safety case for APV/Baro operations and/or APV/SBAS operations.

ESSIP Plan 2014 / Objective NAV107 Finalisation Criteria and Closed Questions  NAV10-ASP01: APV/Baro and/or APV/SBAS Procedures have been implemented in accordance with guidance material, published in the National AIP and are in use. Is the procedure published in the national AIP and is it BARO or SBAS Procedure? If not when is it planned to be developed and published?  NAV10-ASP03: National Safety case for APV/Baro and/or APV/SBAS produced and an operational approval issued by the regulator. Is the National safety case for APV/Baro operations and/or APV/SBAS operations developed and approved?

ESSIP Plan 2014 / Objective NAV108 Supporting Material  EASA AMC Url : measures/docs/agency-decisions/2009/ R/Annex%20III%20- %20AMC% pdfhttps:// measures/docs/agency-decisions/2009/ R/Annex%20III%20- %20AMC% pdf  EASA AMC Url : measures/certification-specifications.php#AMC-20http:// measures/certification-specifications.php#AMC-20  ICAO PANS-OPS (Doc 8168) Url :  FAA - AC C - Airworthiness Approval of Positioning and Navigation Systems 05/2012 Url : ument.list/parentTopicID/101; ument.list/parentTopicID/101  FAA - AC Approval Guidance for RNP Operations and Barometric Vertical Navigation in the U.S. National Airspace System 01/2009 Url : ument.list/parentTopicID/128; ument.list/parentTopicID/128  ICAO - Doc Performance-based Navigation (PBN) Manual - Edition 4 / 03/2013 Url :

ESSIP Plan 2014 / Objective NAV109 ESSIP Report 2013  1 State has reported the objective as ‘Completed’, 6 States ‘Partially Completed’, 23 ‘Planned’ and 1 ‘Not Applicable’. 11 States have not developed planned for implementation but are considering the implementation;  30 States that have planned to implement the objective will complete it by the FOC of the ESSIP.

ESSIP Plan 2014 / Objective NAV1010 Objective Coordinator’s Analysis, recommendations, tips & tricks  As the objective is applicable to all instrument runway ends, states shall provide the implementation plans, the type of procedures and completion dates per each airport in the states;  There are a number of states which have only ‘tentative’ plans and have reported the objective as ‘Planned’. As no agreed/formal plans exist yet, I would propose to change the status to ‘No Plan’.

ESSIP Plan 2014 / Objective NAV1011 Conclusions  Airworthiness Approval and Operational Criteria for RNP APPROACH (RNP APCH) Operations including APV Baro-VNAV Operations (EASA AMC 20-27) has already approved and published in Dec 2009;  Airworthiness Approval and Operational Criteria for RNP APPROACH (RNP APCH) Operations including APV SBAS Operations (EASA AMC 20-28) has already approved and published in Sep 2012;

ESSIP Plan 2014 / Objective NAV1012 Links and contacts  Objective Coordinator: Kokona Adriatik,  DSR Objective Expert: Farnworth Richard, +33 (0)